X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655202510000

Well Details

Well ID: 0655202510000
Loading map...
Location: 00/10-25-065-20W5/0
Location Alias: 00/10-25-65-20 W5M
Location Alias 2: 00/10-25-065-20 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 20
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: SOC KAYBOB 10-25-65-20
Operator Name: AlphaBow Energy Ltd.
License Number: 0071248
License Date: 1978-08-09
License Status: Abandoned
Spud Date: 1978-09-03
Final Drill Date: 1978-10-27
Well Total Depth: 3042.00 m
Surface Hole Latitude: 54.657390
Surface Hole Longitude: -116.882668

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-09 Obtained License
1978-09-14 Drill Stem Test Performed
1978-09-15 Drill Stem Test Performed
1978-09-19 Drill Stem Test Performed
1978-09-20 Drill Stem Test Performed
1978-09-24 Drill Stem Test Performed
1978-10-10 Well Log Performed
1978-10-11 Well Log Performed
1978-10-17 Intermediate Casing Operation Performed
1978-10-17 Perforation Treatment Performed - Open-Hole Completion
1978-10-27 Finished Drilling
1978-10-27 Well Mode changed to Drilled and Cased
1978-10-28 Well Log Performed
1978-12-29 Well Log Performed
1978-12-30 Well Log Performed
1979-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-01-19 Perforation Treatment Performed - Jet Perforation
1979-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-22 Well Log Performed
1979-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-23 Perforation Treatment Performed - Jet Perforation
1979-01-25 Well Began Production
1979-01-25 Well Fluid changed to Crude Oil
1979-01-25 Well Mode changed to Flowing
1979-01-30 Perforation Treatment Performed - Jet Perforation
1979-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-07 Perforation Treatment Performed - Jet Perforation
1980-02-10 Perforation Treatment Performed - Fractured
1980-02-10 Well Fluid changed to Crude Oil
1980-02-10 Well Mode changed to Pumping
1981-09-21 Well Fluid changed to Crude Oil
1981-09-21 Well Mode changed to Suspended
1981-12-04 Well Fluid changed to Crude Oil
1981-12-04 Well Mode changed to Pumping
1984-03-31 Well Fluid changed to Crude Oil
1984-03-31 Well Mode changed to Suspended
1986-02-19 Well Log Performed
1986-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-02-20 Plug Back Performed
1986-02-20 Well Fluid changed to Crude Oil
1986-02-20 Well Log Performed
1986-02-20 Well Mode changed to Abandoned Zone
1986-02-21 Well Log Performed
1986-02-22 Perforation Treatment Performed - Jet Perforation
1986-02-26 Perforation Treatment Performed - Jet Perforation
1995-03-12 Perforation Treatment Performed - Cement Squeeze
1995-03-12 Plug Back Performed
1995-03-22 Perforation Treatment Performed - Jet Perforation
1995-03-22 Well Fluid changed to Crude Oil
1995-03-22 Well Mode changed to Suspended
1997-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-12 Plug Back Performed
1997-02-12 Well Fluid changed to Crude Oil
1997-02-12 Well Mode changed to Abandoned Zone
1997-02-13 Well Abandoned
1999-12-30 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-17 Open Hole/Barefoot Completion 2680.00 3042.00 0
1979-01-31 Acid Treatment 2524.00 2531.00 0
1980-02-07 Perforation 2526.50 2528.50 7
1980-02-07 Perforation 2531.00 2534.00 7
1980-02-07 Perforation 2541.50 2545.00 7
1980-02-07 Perforation 2552.00 2555.00 7
1980-02-10 Fracture 2524.00 2558.80 0
1986-02-20 Packing Device Capped w/Cement 2502.00 2510.00 0
1986-02-22 Perforation 1355.40 1358.40 13
1986-02-26 Perforation 1406.40 1408.90 13
1995-03-12 Cement Squeeze 1355.40 1408.90 0
1979-01-17 Packing Device Capped w/Cement 2644.00 2650.00 0
1995-03-22 Perforation 2524.00 2534.00 7
1995-03-22 Perforation 2541.50 2545.00 7
1995-03-22 Perforation 2551.00 2553.00 7
1995-03-22 Perforation 2552.00 2555.00 7
1995-03-22 Perforation 2554.00 2558.00 7
1995-03-22 Perforation 2554.80 2558.80 7
1997-02-12 Packing Device Capped w/Cement 2502.00 2510.00 0
1979-01-19 Perforation 2554.80 2558.80 7
1979-01-21 Acid Treatment 2554.80 2558.80 0
1979-01-23 Perforation 2551.00 2553.00 7
1979-01-23 Perforation 2554.00 2558.00 7
1979-01-23 Acid Treatment 2551.00 2558.80 0
1979-01-30 Perforation 2524.00 2526.50 7
1979-01-30 Perforation 2528.50 2531.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 3399 0.0 0.0 0.0
1980 3799 0.0 0.0 0.0
1981 3007 0.0 0.0 0.0
1982 4939 0.0 0.0 0.0
1983 2705 0.0 0.0 0.0
1984 384 0.0 0.0 0.0

For data sources see[5]

References