If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0655202510002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.65739,"lon":-116.882668,"icon":""}]} |
Location: 00/10-25-065-20W5/2 | |
Location Alias: 00/10-25-65-20 W5M | |
Location Alias 2: 00/10-25-065-20 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 5 | |
Range: 20 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SOC KAYBOB 10-25-65-20 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0071248 | |
License Date: 1978-08-09 | |
License Status: Abandoned | |
Spud Date: 1978-09-03 | |
Final Drill Date: 1978-10-27 | |
Well Total Depth: 3042.00 m | |
Surface Hole Latitude: 54.657390 | |
Surface Hole Longitude: -116.882668 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-08-09 | Obtained License |
1978-09-14 | Drill Stem Test Performed |
1978-09-15 | Drill Stem Test Performed |
1978-09-19 | Drill Stem Test Performed |
1978-09-20 | Drill Stem Test Performed |
1978-09-24 | Drill Stem Test Performed |
1978-10-10 | Well Log Performed |
1978-10-11 | Well Log Performed |
1978-10-17 | Intermediate Casing Operation Performed |
1978-10-17 | Perforation Treatment Performed - Open-Hole Completion |
1978-10-27 | Finished Drilling |
1978-10-28 | Well Log Performed |
1978-12-29 | Well Log Performed |
1978-12-30 | Well Log Performed |
1979-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-01-19 | Perforation Treatment Performed - Jet Perforation |
1979-01-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-01-22 | Well Log Performed |
1979-01-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-01-23 | Perforation Treatment Performed - Jet Perforation |
1979-01-30 | Perforation Treatment Performed - Jet Perforation |
1979-01-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-07 | Perforation Treatment Performed - Jet Perforation |
1980-02-10 | Perforation Treatment Performed - Fractured |
1986-02-19 | Well Log Performed |
1986-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-02-20 | Plug Back Performed |
1986-02-20 | Well Log Performed |
1986-02-21 | Well Log Performed |
1986-02-22 | Perforation Treatment Performed - Jet Perforation |
1986-02-26 | Perforation Treatment Performed - Jet Perforation |
1986-02-28 | Well Mode changed to Drilled and Cased |
1987-02-01 | Well Began Production |
1987-02-01 | Well Fluid changed to Gas |
1987-02-01 | Well Mode changed to Flowing |
1995-03-12 | Perforation Treatment Performed - Cement Squeeze |
1995-03-12 | Plug Back Performed |
1995-03-12 | Well Fluid changed to Gas |
1995-03-12 | Well Mode changed to Abandoned Zone |
1995-03-22 | Perforation Treatment Performed - Jet Perforation |
1997-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-02-12 | Plug Back Performed |
1997-02-13 | Well Abandoned |
1997-02-13 | Well Fluid changed to Gas |
1997-02-13 | Well Mode changed to Abandoned |
1999-12-30 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-10-17 | Open Hole/Barefoot Completion | 2680.00 | 3042.00 | 0 |
1979-01-31 | Acid Treatment | 2524.00 | 2531.00 | 0 |
1980-02-07 | Perforation | 2526.50 | 2528.50 | 7 |
1980-02-07 | Perforation | 2531.00 | 2534.00 | 7 |
1980-02-07 | Perforation | 2541.50 | 2545.00 | 7 |
1980-02-07 | Perforation | 2552.00 | 2555.00 | 7 |
1980-02-10 | Fracture | 2524.00 | 2558.80 | 0 |
1986-02-20 | Packing Device Capped w/Cement | 2502.00 | 2510.00 | 0 |
1986-02-22 | Perforation | 1355.40 | 1358.40 | 13 |
1986-02-26 | Perforation | 1406.40 | 1408.90 | 13 |
1995-03-12 | Cement Squeeze | 1355.40 | 1408.90 | 0 |
1979-01-17 | Packing Device Capped w/Cement | 2644.00 | 2650.00 | 0 |
1995-03-22 | Perforation | 2524.00 | 2534.00 | 7 |
1995-03-22 | Perforation | 2541.50 | 2545.00 | 7 |
1995-03-22 | Perforation | 2551.00 | 2553.00 | 7 |
1995-03-22 | Perforation | 2552.00 | 2555.00 | 7 |
1995-03-22 | Perforation | 2554.00 | 2558.00 | 7 |
1995-03-22 | Perforation | 2554.80 | 2558.80 | 7 |
1997-02-12 | Packing Device Capped w/Cement | 2502.00 | 2510.00 | 0 |
1979-01-19 | Perforation | 2554.80 | 2558.80 | 7 |
1979-01-21 | Acid Treatment | 2554.80 | 2558.80 | 0 |
1979-01-23 | Perforation | 2551.00 | 2553.00 | 7 |
1979-01-23 | Perforation | 2554.00 | 2558.00 | 7 |
1979-01-23 | Acid Treatment | 2551.00 | 2558.80 | 0 |
1979-01-30 | Perforation | 2524.00 | 2526.50 | 7 |
1979-01-30 | Perforation | 2528.50 | 2531.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 5648 | 0.0 | 0.0 | 0.0 |
1988 | 7078 | 0.0 | 0.0 | 0.0 |
1989 | 7731 | 0.0 | 0.0 | 0.0 |
1990 | 7935 | 0.0 | 0.0 | 0.0 |
1991 | 8117 | 0.0 | 0.0 | 0.0 |
1992 | 7509 | 0.0 | 0.0 | 0.0 |
1993 | 8276 | 0.0 | 0.0 | 0.0 |
1994 | 7610 | 0.0 | 0.0 | 0.0 |
1995 | 262 | 0.0 | 0.0 | 0.0 |
For data sources see[5]