X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655241416000

Well Details

Well ID: 0655241416000
Loading map...
Location: 00/16-14-065-24W5/0
Location Alias: 00/16-14-65-24 W5M
Location Alias 2: 00/16-14-065-24 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 24
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: RMP ANTE 16-14-65-24
Operator Name: Tangle Creek Energy Ltd.
License Number: 0435933
License Date: 2011-08-11
License Status: Suspension
Spud Date: 2011-08-26
Final Drill Date: 2011-09-06
Well Total Depth: 3312.00 m
Surface Hole Latitude: 54.619568
Surface Hole Longitude: -117.511603

For data sources see[1][2]

Well History

Date Event
2011-08-11 Obtained License
2011-08-27 Surface Casing Operation Performed
2011-08-28 Well Log Performed
2011-08-30 Direction Drilling Operation Performed - Deviate
2011-09-01 Direction Drilling Operation Performed - Horizontal
2011-09-02 Intermediate Casing Operation Performed
2011-09-02 Well Log Performed
2011-09-06 Finished Drilling
2011-09-06 Well Mode changed to Drilled and Cased
2011-09-08 Liner Casing Operation Performed
2011-09-08 Perforation Treatment Performed - Open-Hole Completion
2011-09-08 Well Log Performed
2011-09-10 Rig Released
2011-09-30 Well Log Performed
2011-10-13 Perforation Treatment Performed - Jet Perforation
2011-10-14 Perforation Treatment Performed - Fractured
2011-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-04 Well Began Production
2011-11-04 Well Fluid changed to Crude Oil
2011-11-04 Well Mode changed to Flowing
2012-01-28 Well Fluid changed to Crude Oil
2012-01-28 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-30 1851.20 Deviate (5 - 79 degrees)
2011-09-01 2243.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-08 Open Hole/Barefoot Completion 3301.00 3312.00 0
2011-10-14 Multi-Stage Fracture 2468.30 2468.40 0
2011-10-14 Multi-Stage Fracture 2390.80 2390.90 0
2011-10-14 Multi-Stage Fracture 2313.30 2313.40 0
2011-10-13 Perforation 3262.00 3263.00 17
2011-10-14 Fracture 3262.00 3263.00 0
2011-10-14 Multi-Stage Fracture 2947.00 2947.10 0
2011-10-14 Multi-Stage Fracture 2869.50 2869.60 0
2011-10-14 Multi-Stage Fracture 2792.00 2792.10 0
2011-10-14 Multi-Stage Fracture 2714.60 2714.70 0
2011-10-14 Multi-Stage Fracture 2637.10 2637.20 0
2011-10-14 Multi-Stage Fracture 2545.80 2545.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 72 0.0 0.0 0.0
2012 7563 0.0 0.0 0.0
2013 6741 0.0 0.0 0.0
2014 7273 0.0 0.0 0.0
2015 8071 0.0 0.0 0.0
2016 7654 0.0 0.0 0.0
2017 5945 0.0 0.0 0.0

For data sources see[6]

References