If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0655242410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.641441,"lon":-117.489553,"icon":""}]} |
| Location: 00/10-24-065-24W5/0 | |
| Location Alias: 00/10-24-65-24 W5M | |
| Location Alias 2: 00/10-24-065-24 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 065 | |
| Meridian: 5 | |
| Range: 24 | |
| Section: 24 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: HOMESTEAD RB ANTE CREEK 10-24-65-24 | |
| Operator Name: CNOOC Petroleum North America ULC | |
| License Number: 0026298 | |
| License Date: 1964-06-19 | |
| License Status: Abandoned | |
| Spud Date: 1964-07-02 | |
| Final Drill Date: 1964-09-03 | |
| Well Total Depth: 3454.90 m | |
| Surface Hole Latitude: 54.641441 | |
| Surface Hole Longitude: -117.489553 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1964-06-19 | Obtained License |
| 1964-09-03 | Finished Drilling |
| 1964-09-03 | Well Mode changed to Drilled and Cased |
| 1964-09-05 | Production Casing Operation Performed |
| 1964-10-19 | Perforation Treatment Performed - Jet Perforation |
| 1964-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1964-11-06 | Well Began Production |
| 1964-11-06 | Well Fluid changed to Crude Oil |
| 1964-11-06 | Well Mode changed to Flowing |
| 1969-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1969-12-04 | Perforation Treatment Performed - Jet Perforation |
| 1985-10-24 | Well Log Performed |
| 1985-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-10-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-10-31 | Well Log Performed |
| 1985-11-01 | Well Log Performed |
| 1985-11-07 | Well Log Performed |
| 1986-01-07 | Well Began Injection |
| 1986-01-07 | Well Fluid changed to Solvent |
| 1986-01-07 | Well Type changed to Injection |
| 1992-09-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-09-27 | Plug Back Performed |
| 1992-09-30 | Well Log Performed |
| 1992-10-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-10-01 | Well Fluid changed to Solvent |
| 1992-10-01 | Well Mode changed to Abandoned |
| 1992-10-01 | Well Type changed to Injection |
| 1992-10-03 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1964-10-19 | Perforation | 3379.90 | 3391.50 | 13 |
| 1992-10-01 | Packing Device Capped w/Cement | 2029.40 | 2310.00 | 0 |
| 1964-10-20 | Acid Treatment | 3379.90 | 3391.50 | 0 |
| 1969-12-04 | Perforation | 3394.90 | 3401.00 | 7 |
| 1969-12-04 | Perforation | 3406.70 | 3410.10 | 7 |
| 1969-12-04 | Acid Treatment | 3394.90 | 3410.10 | 0 |
| 1985-10-27 | Acid Treatment | 3379.90 | 3401.00 | 0 |
| 1985-10-28 | Acid Treatment | 3379.90 | 3401.00 | 0 |
| 1985-10-29 | Acid Treatment | 3379.90 | 3410.10 | 0 |
| 1992-09-27 | Packing Device Capped w/Cement | 3328.00 | 3336.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 2388 | 0.0 | 0.0 | 0.0 |
| 1968 | 3189 | 0.0 | 0.0 | 0.0 |
| 1969 | 5737 | 0.0 | 0.0 | 0.0 |
| 1970 | 5995 | 0.0 | 0.0 | 0.0 |
| 1971 | 7388 | 0.0 | 0.0 | 0.0 |
| 1972 | 4827 | 0.0 | 0.0 | 0.0 |
| 1974 | 688 | 0.0 | 0.0 | 0.0 |
| 1976 | 3959 | 0.0 | 0.0 | 0.0 |
| 1977 | 7878 | 0.0 | 0.0 | 0.0 |
| 1978 | 6833 | 0.0 | 0.0 | 0.0 |
| 1979 | 7113 | 0.0 | 0.0 | 0.0 |
| 1980 | 8153 | 0.0 | 0.0 | 0.0 |
| 1981 | 7929 | 0.0 | 0.0 | 0.0 |
| 1982 | 7798 | 0.0 | 0.0 | 0.0 |
| 1983 | 7294 | 0.0 | 0.0 | 0.0 |
| 1984 | 2615 | 0.0 | 0.0 | 0.0 |
| 1985 | 1662 | 0.0 | 0.0 | 0.0 |
| 1986 | 0 | 0.0 | 0.0 | 0.0 |
| 1987 | 0 | 0.0 | 0.0 | 0.0 |
| 1988 | 0 | 0.0 | 0.0 | 0.0 |
| 1989 | 0 | 0.0 | 0.0 | 0.0 |
| 1990 | 0 | 0.0 | 0.0 | 0.0 |
| 1991 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]