X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656051413000

Well Details

Well ID: 0656051413000
Loading map...
Location: 00/13-14-065-05W6/0
Location Alias: 00/13-14-65-05 W6M
Location Alias 2: 00/13-14-065-05 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 05
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARVEST HZ KARR 13-14-65-5
Operator Name: Harvest Operations Corp.
License Number: 0443297
License Date: 2012-01-24
License Status: Issued
Spud Date: 2012-02-17
Final Drill Date: 2012-03-16
Well Total Depth: 3790.00 m
Surface Hole Latitude: 54.616561
Surface Hole Longitude: -118.652471

For data sources see[1][2]

Well History

Date Event
2012-01-24 Obtained License
2012-02-17 Lost Circulation Occurred
2012-02-18 Lost Circulation Occurred
2012-02-21 Surface Casing Operation Performed
2012-02-26 Well Log Performed
2012-02-29 Direction Drilling Operation Performed - Deviate
2012-03-05 Well Log Performed
2012-03-06 Intermediate Casing Operation Performed
2012-03-07 Direction Drilling Operation Performed - Horizontal
2012-03-10 Well Log Performed
2012-03-16 Finished Drilling
2012-03-16 Well Log Performed
2012-03-16 Well Mode changed to Drilled and Cased
2012-03-19 Well Log Performed
2012-03-20 Liner Casing Operation Performed
2012-03-20 Perforation Treatment Performed - Open-Hole Completion
2012-03-21 Rig Released
2012-03-22 Well Log Performed
2012-06-22 Well Log Performed
2012-07-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-15 Well Began Production
2012-08-15 Well Fluid changed to Gas
2012-08-15 Well Mode changed to Flowing
2016-03-01 Well Fluid changed to Gas
2016-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-17 Crusader Drilling Corp. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-29 1886.00 Deviate (5 - 79 degrees)
2012-03-07 2415.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-20 Open Hole/Barefoot Completion 3785.00 3790.00 0
2012-07-04 Multi-Stage Fracture 3194.20 3194.30 0
2012-07-04 Multi-Stage Fracture 3119.20 3119.30 0
2012-07-04 Multi-Stage Fracture 3035.90 3036.00 0
2012-07-04 Multi-Stage Fracture 2939.30 2939.40 0
2012-07-05 Multi-Stage Fracture 2855.70 2855.80 0
2012-07-05 Multi-Stage Fracture 2772.70 2772.80 0
2012-07-05 Multi-Stage Fracture 2688.60 2688.70 0
2012-07-05 Multi-Stage Fracture 2604.80 2604.90 0
2012-07-05 Multi-Stage Fracture 2521.10 2521.20 0
2012-07-05 Multi-Stage Fracture 2437.20 2437.30 0
2012-07-03 Multi-Stage Fracture 3773.50 3776.10 0
2012-07-03 Multi-Stage Fracture 3719.80 3719.90 0
2012-07-03 Multi-Stage Fracture 3646.10 3646.20 0
2012-07-03 Multi-Stage Fracture 3561.60 3561.70 0
2012-07-03 Multi-Stage Fracture 3489.80 3489.90 0
2012-07-03 Multi-Stage Fracture 3415.20 3415.30 0
2012-07-03 Multi-Stage Fracture 3342.30 3342.40 0
2012-07-04 Multi-Stage Fracture 3266.60 3266.70 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3672 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8520 0.0 0.0 0.0
2017 7656 0.0 0.0 0.0
2018 7045 0.0 0.0 0.0
2019 5519 0.0 0.0 0.0
2020 264 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-17 Lost Circulation 90.00 154.00
2012-02-18 Lost Circulation 70.00 80.00
2012-02-18 Lost Circulation 90.00 118.00
2012-07-16 No Incident Encountered 0.00 0.00

For data sources see[8]

References