If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0656060104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.600223,"lon":-118.779945,"icon":""}]} |
| Location: 00/04-01-065-06W6/0 | |
| Location Alias: 00/04-01-65-06 W6M | |
| Location Alias 2: 00/04-01-065-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 065 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 01 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: HARVEST BILBO 4-1-65-6 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0420832 | |
| License Date: 2010-06-02 | |
| License Status: Issued | |
| Spud Date: 2010-06-21 | |
| Final Drill Date: 2010-07-24 | |
| Well Total Depth: 3539.00 m | |
| Surface Hole Latitude: 54.600223 | |
| Surface Hole Longitude: -118.779945 |
| Date | Event |
|---|---|
| 2010-06-02 | Obtained License |
| 2010-06-21 | Lost Circulation Occurred |
| 2010-06-24 | Surface Casing Operation Performed |
| 2010-07-02 | Direction Drilling Operation Performed - Deviate |
| 2010-07-11 | Well Log Performed |
| 2010-07-14 | Intermediate Casing Operation Performed |
| 2010-07-17 | Direction Drilling Operation Performed - Horizontal |
| 2010-07-24 | Finished Drilling |
| 2010-07-24 | Well Log Performed |
| 2010-07-24 | Well Mode changed to Drilled and Cased |
| 2010-07-25 | Production Casing Operation Performed |
| 2010-07-25 | Well Fluid changed to Gas |
| 2010-07-25 | Well Mode changed to Testing |
| 2010-07-26 | Well Log Performed |
| 2010-07-27 | Rig Released |
| 2010-07-27 | Well Log Performed |
| 2010-08-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-08-19 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-10-22 | Well Began Production |
| 2010-10-22 | Well Fluid changed to Gas |
| 2010-10-22 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-07-02 | 2119.00 | Deviate (5 - 79 degrees) |
| 2010-07-17 | 2560.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-08-19 | Open Hole/Barefoot Completion | 3538.00 | 3539.00 | 0 |
| 2010-08-21 | Multi-Stage Fracture | 2587.30 | 2587.40 | 0 |
| 2010-08-21 | Multi-Stage Fracture | 2470.30 | 2470.40 | 0 |
| 2010-08-19 | Multi-Stage Fracture | 3518.80 | 3518.90 | 0 |
| 2010-08-19 | Multi-Stage Fracture | 3398.20 | 3398.30 | 0 |
| 2010-08-20 | Multi-Stage Fracture | 3278.50 | 3278.60 | 0 |
| 2010-08-20 | Multi-Stage Fracture | 3144.60 | 3144.70 | 0 |
| 2010-08-20 | Multi-Stage Fracture | 3025.90 | 3026.00 | 0 |
| 2010-08-20 | Multi-Stage Fracture | 2923.90 | 2924.00 | 0 |
| 2010-08-21 | Multi-Stage Fracture | 2750.80 | 2750.90 | 0 |
| 2010-08-21 | Multi-Stage Fracture | 2690.90 | 2691.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 1624 | 0.0 | 0.0 | 0.0 |
| 2011 | 8333 | 0.0 | 0.0 | 0.0 |
| 2012 | 8652 | 0.0 | 0.0 | 0.0 |
| 2013 | 8459 | 0.0 | 0.0 | 0.0 |
| 2014 | 7157 | 0.0 | 0.0 | 0.0 |
| 2015 | 7292 | 0.0 | 0.0 | 0.0 |
| 2016 | 8485 | 0.0 | 0.0 | 0.0 |
| 2017 | 8500 | 0.0 | 0.0 | 0.0 |
| 2018 | 8530 | 0.0 | 0.0 | 0.0 |
| 2019 | 8131 | 0.0 | 0.0 | 0.0 |
| 2020 | 2113 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2010-06-21 | Lost Circulation | 75.00 | 161.00 |
| 2010-08-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]