X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656061001020

Well Details

Well ID: 0656061001020
Loading map...
Location: 02/01-10-065-06W6/0
Location Alias: 02/01-10-65-06 W6M
Location Alias 2: 02/01-10-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA 102 HZ KAKWA 1-10-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0491206
License Date: 2018-09-28
License Status: Issued
Spud Date: 2018-10-11
Final Drill Date: 2019-01-11
Well Total Depth: 5660.00 m
Surface Hole Latitude: 54.622812
Surface Hole Longitude: -118.833535

For data sources see[1][2]

Well History

Date Event
2018-09-28 Obtained License
2018-10-13 Surface Casing Operation Performed
2018-12-31 Direction Drilling Operation Performed - Deviate
2019-01-04 Direction Drilling Operation Performed - Horizontal
2019-01-04 Well Log Performed
2019-01-05 Intermediate Casing Operation Performed
2019-01-11 Finished Drilling
2019-01-11 Well Log Performed
2019-01-11 Well Mode changed to Drilled and Cased
2019-01-13 Liner Casing Operation Performed
2019-01-15 Rig Released
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-14 Well Began Production
2019-05-14 Well Fluid changed to Gas
2019-05-14 Well Mode changed to Flowing
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-10-11 Nabors Drilling Canada Limited 17 N/A Set Surface
2018-12-18 Nabors Drilling Canada Limited 17 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-12-31 2914.60 Deviate (5 - 79 degrees)
2019-01-04 3381.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-06 Multi-Stage Fracture 5615.00 5632.40 0
2019-03-12 Multi-Stage Fracture 4960.30 4960.40 0
2019-03-12 Multi-Stage Fracture 4886.20 4886.30 0
2019-03-12 Multi-Stage Fracture 4816.40 4816.50 0
2019-03-12 Multi-Stage Fracture 4742.50 4742.60 0
2019-03-13 Multi-Stage Fracture 4668.50 4668.60 0
2019-03-13 Multi-Stage Fracture 4597.70 4597.80 0
2019-03-13 Multi-Stage Fracture 4530.50 4530.60 0
2019-03-13 Multi-Stage Fracture 4450.40 4450.50 0
2019-03-13 Multi-Stage Fracture 4373.40 4373.50 0
2019-03-15 Multi-Stage Fracture 4292.00 4292.10 0
2019-03-07 Multi-Stage Fracture 5552.50 5552.60 0
2019-03-15 Multi-Stage Fracture 4218.00 4218.10 0
2019-03-15 Multi-Stage Fracture 4144.00 4144.10 0
2019-03-16 Multi-Stage Fracture 4069.80 4069.90 0
2019-03-17 Multi-Stage Fracture 3996.30 3996.40 0
2019-03-17 Multi-Stage Fracture 3922.70 3922.80 0
2019-03-17 Multi-Stage Fracture 3848.70 3848.80 0
2019-03-17 Multi-Stage Fracture 3774.60 3774.70 0
2019-03-20 Multi-Stage Fracture 3700.70 3700.80 0
2019-03-20 Multi-Stage Fracture 3627.90 3628.00 0
2019-03-20 Multi-Stage Fracture 3555.00 3555.10 0
2019-03-08 Multi-Stage Fracture 5478.40 5478.50 0
2019-03-20 Multi-Stage Fracture 3482.80 3482.90 0
2019-03-08 Multi-Stage Fracture 5404.20 5404.30 0
2019-03-08 Multi-Stage Fracture 5330.70 5330.80 0
2019-03-08 Multi-Stage Fracture 5257.10 5257.20 0
2019-03-08 Multi-Stage Fracture 5182.80 5182.90 0
2019-03-08 Multi-Stage Fracture 5108.60 5108.70 0
2019-03-08 Multi-Stage Fracture 5034.40 5034.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-06 2019-03-20 3,224 21,710 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 88.519 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 9.4814 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 2.3649 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0295 N/A
non-hazardous ingredients Not Available 100 0.0295 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-06 2019-03-20 Surface Water - River 21709

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5517 0.0 0.0 0.0
2020 2003 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-15 No Incident Encountered 0.00 0.00
2019-03-31 No Incident Encountered 0.00 0.00
2019-05-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References