X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656061009000

Well Details

Well ID: 0656061009000
Loading map...
Location: 00/09-10-065-06W6/0
Location Alias: 00/09-10-65-06 W6M
Location Alias 2: 00/09-10-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ KAKWA 9-10-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0483984
License Date: 2017-06-12
License Status: Issued
Spud Date: 2017-09-05
Final Drill Date: 2017-10-03
Well Total Depth: 6726.00 m
Surface Hole Latitude: 54.634978
Surface Hole Longitude: -118.846167

For data sources see[1][2]

Well History

Date Event
2017-06-12 Obtained License
2017-09-07 Surface Casing Operation Performed
2017-09-15 Direction Drilling Operation Performed - Deviate
2017-09-18 Direction Drilling Operation Performed - Horizontal
2017-09-19 Intermediate Casing Operation Performed
2017-09-19 Well Log Performed
2017-09-21 Well Log Performed
2017-10-03 Finished Drilling
2017-10-03 Well Log Performed
2017-10-03 Well Mode changed to Drilled and Cased
2017-10-07 Liner Casing Operation Performed
2017-10-08 Perforation Treatment Performed - Open-Hole Completion
2017-10-08 Rig Released
2017-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-05 Perforation Treatment Performed - Jet Perforation
2017-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-06 Perforation Treatment Performed - Jet Perforation
2017-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-07 Perforation Treatment Performed - Jet Perforation
2017-11-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-21 Well Began Production
2017-11-21 Well Fluid changed to Gas
2017-11-21 Well Mode changed to Flowing
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-05 Nabors Drilling Canada Limited 78 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-15 2936.20 Deviate (5 - 79 degrees)
2017-09-18 3322.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-08 Open Hole/Barefoot Completion 6716.00 6726.00 0
2017-11-02 Multi-Stage Fracture 5957.30 5957.40 0
2017-11-02 Multi-Stage Fracture 5867.20 5867.30 0
2017-11-03 Multi-Stage Fracture 5776.40 5776.50 0
2017-11-03 Multi-Stage Fracture 5685.40 5685.50 0
2017-11-03 Multi-Stage Fracture 5594.20 5594.30 0
2017-11-03 Multi-Stage Fracture 5503.30 5503.40 0
2017-11-03 Multi-Stage Fracture 5412.30 5412.40 0
2017-11-04 Multi-Stage Fracture 5321.80 5321.90 0
2017-11-04 Multi-Stage Fracture 5235.60 5235.70 0
2017-11-04 Multi-Stage Fracture 5148.40 5148.50 0
2017-10-31 Multi-Stage Fracture 6679.40 6682.80 0
2017-11-04 Multi-Stage Fracture 5062.30 5062.40 0
2017-11-04 Multi-Stage Fracture 4975.80 4975.90 0
2017-11-04 Multi-Stage Fracture 4888.80 4888.90 0
2017-11-04 Multi-Stage Fracture 4801.00 4801.10 0
2017-11-05 Perforation 4713.80 4713.90 12
2017-11-05 Multi-Stage Fracture 4713.80 4713.90 0
2017-11-05 Perforation 4626.00 4626.10 12
2017-11-05 Multi-Stage Fracture 4626.00 4626.10 0
2017-11-05 Perforation 4538.00 4538.10 12
2017-11-05 Multi-Stage Fracture 4538.00 4538.10 0
2017-10-31 Multi-Stage Fracture 6588.90 6589.00 0
2017-11-05 Perforation 4450.40 4450.50 12
2017-11-05 Multi-Stage Fracture 4450.40 4450.50 0
2017-11-05 Perforation 4362.60 4362.70 12
2017-11-05 Multi-Stage Fracture 4362.60 4362.70 0
2017-11-06 Perforation 4274.10 4274.20 12
2017-11-06 Multi-Stage Fracture 4274.10 4274.20 0
2017-11-06 Perforation 4186.10 4186.20 12
2017-11-06 Multi-Stage Fracture 4186.10 4186.20 0
2017-11-06 Perforation 4099.10 4099.20 12
2017-11-06 Multi-Stage Fracture 4099.10 4099.20 0
2017-10-31 Multi-Stage Fracture 6502.20 6502.30 0
2017-11-06 Perforation 4011.40 4011.50 12
2017-11-06 Multi-Stage Fracture 4011.40 4011.50 0
2017-11-07 Perforation 3923.70 3923.80 12
2017-11-07 Multi-Stage Fracture 3923.70 3923.80 0
2017-11-07 Perforation 3836.80 3836.90 12
2017-11-07 Multi-Stage Fracture 3836.80 3836.90 0
2017-11-07 Perforation 3750.40 3750.50 12
2017-11-07 Multi-Stage Fracture 3750.40 3750.50 0
2017-11-07 Perforation 3656.60 3656.70 12
2017-11-07 Multi-Stage Fracture 3656.60 3656.70 0
2017-11-01 Multi-Stage Fracture 6411.70 6411.80 0
2017-11-07 Perforation 3554.80 3554.90 12
2017-11-07 Multi-Stage Fracture 3554.80 3554.90 0
2017-11-01 Multi-Stage Fracture 6320.60 6320.70 0
2017-11-01 Multi-Stage Fracture 6229.50 6229.60 0
2017-11-02 Multi-Stage Fracture 6138.50 6138.60 0
2017-11-02 Multi-Stage Fracture 6047.40 6047.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-31 2017-11-07 3,210 28,629 N/A
2 2017-11-06 2017-11-07 3,210 0 N/A
3 2017-11-03 2017-11-07 3,210 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 91.7776 N/A
Interprop 30/50 Trican corundum 1302-74-5 100 1.5807 N/A
mullite 1302-93-8 100 1.5807 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 6.6994 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 2.0868 N/A
CAN-2057 Friction Reducer Trican Friction Reducer acrylamide modified polymer 9972 100 0.0955 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0955 N/A
non-hazardous ingredients Not Available 100 0.0955 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0425 N/A
2 CAN-2300 Breaker Trican Breaker cellulase enzyme solution Not Available 100 0.0009 N/A
3 WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0002 N/A
CAN-2200S Crosslinker / pH buffer Trican Crosslinker monoethanolamine 141-43-5 100 0.0042 N/A
water Not Available 100 0.0042 N/A
WG-111Ls Trican Gelling Agent guar gum 9000-30-0 100 0.0127 N/A
mineral oil Not Available 100 0.0127 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-31 2017-11-04 Surface Water - Runoff 19319
2017-10-29 2017-10-30 Surface Water - Runoff 3907
2017-10-29 2017-11-08 Surface Water - Runoff 5055

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 284 0.0 0.0 0.0
2018 8072 0.0 0.0 0.0
2019 6766 0.0 0.0 0.0
2020 1938 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-08 No Incident Encountered 0.00 0.00
2017-11-08 No Incident Encountered 0.00 0.00
2019-05-31 No Incident Encountered 0.00 0.00

For data sources see[10]

References