X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656061009020

Well Details

Well ID: 0656061009020
Loading map...
Location: 02/09-10-065-06W6/0
Location Alias: 02/09-10-65-06 W6M
Location Alias 2: 02/09-10-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA 102 HZ KAKWA 9-10-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0483988
License Date: 2017-06-12
License Status: Issued
Spud Date: 2017-08-02
Final Drill Date: 2017-08-31
Well Total Depth: 6575.00 m
Surface Hole Latitude: 54.634918
Surface Hole Longitude: -118.846051

For data sources see[1][2]

Well History

Date Event
2017-06-12 Obtained License
2017-08-03 Surface Casing Operation Performed
2017-08-11 Direction Drilling Operation Performed - Deviate
2017-08-14 Direction Drilling Operation Performed - Horizontal
2017-08-20 Intermediate Casing Operation Performed
2017-08-31 Finished Drilling
2017-08-31 Well Log Performed
2017-08-31 Well Mode changed to Drilled and Cased
2017-09-02 Liner Casing Operation Performed
2017-09-04 Perforation Treatment Performed - Open-Hole Completion
2017-09-04 Rig Released
2017-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-03 Perforation Treatment Performed - Jet Perforation
2017-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-04 Perforation Treatment Performed - Jet Perforation
2017-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-05 Perforation Treatment Performed - Jet Perforation
2017-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-06 Perforation Treatment Performed - Jet Perforation
2017-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-18 Well Began Production
2017-11-18 Well Fluid changed to Gas
2017-11-18 Well Mode changed to Flowing
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-02 Nabors Drilling Canada Limited 78 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-11 2966.30 Deviate (5 - 79 degrees)
2017-08-14 3352.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-04 Open Hole/Barefoot Completion 6570.00 6575.00 0
2017-10-31 Multi-Stage Fracture 5827.40 5827.50 0
2017-11-01 Multi-Stage Fracture 5739.90 5740.00 0
2017-11-01 Multi-Stage Fracture 5651.10 5651.20 0
2017-11-01 Multi-Stage Fracture 5563.30 5563.40 0
2017-11-01 Multi-Stage Fracture 5474.40 5474.50 0
2017-11-02 Multi-Stage Fracture 5385.40 5385.50 0
2017-11-02 Multi-Stage Fracture 5209.00 5209.10 0
2017-11-02 Multi-Stage Fracture 5122.30 5122.40 0
2017-11-02 Multi-Stage Fracture 5034.10 5034.20 0
2017-11-02 Multi-Stage Fracture 4932.30 4932.40 0
2017-10-30 Multi-Stage Fracture 6519.30 6522.90 0
2017-11-02 Multi-Stage Fracture 4830.10 4830.20 0
2017-11-03 Multi-Stage Fracture 4728.10 4728.20 0
2017-11-03 Perforation 4626.90 4627.00 12
2017-11-04 Multi-Stage Fracture 4626.90 4627.00 0
2017-11-04 Perforation 4539.70 4539.80 12
2017-11-04 Multi-Stage Fracture 4539.70 4539.80 0
2017-11-04 Perforation 4452.80 4452.90 12
2017-11-04 Multi-Stage Fracture 4452.80 4452.90 0
2017-11-05 Perforation 4366.80 4366.90 12
2017-11-05 Multi-Stage Fracture 4366.80 4366.90 0
2017-10-30 Multi-Stage Fracture 6443.80 6443.90 0
2017-11-05 Perforation 4280.40 4280.50 12
2017-11-05 Multi-Stage Fracture 4280.40 4280.50 0
2017-11-05 Perforation 4194.00 4194.10 12
2017-11-05 Multi-Stage Fracture 4194.00 4194.10 0
2017-11-05 Perforation 4108.30 4108.40 12
2017-11-05 Multi-Stage Fracture 4108.30 4108.40 0
2017-11-05 Perforation 4022.20 4022.30 12
2017-11-05 Multi-Stage Fracture 4022.20 4022.30 0
2017-11-06 Perforation 3936.70 3936.80 12
2017-11-06 Multi-Stage Fracture 3936.70 3936.80 0
2017-10-30 Multi-Stage Fracture 6355.30 6355.40 0
2017-11-06 Perforation 3850.90 3851.00 12
2017-11-06 Multi-Stage Fracture 3850.90 3851.00 0
2017-11-06 Perforation 3765.10 3765.20 12
2017-11-06 Multi-Stage Fracture 3765.10 3765.20 0
2017-11-06 Perforation 3678.80 3678.90 12
2017-11-06 Multi-Stage Fracture 3678.80 3678.90 0
2017-10-30 Multi-Stage Fracture 6267.40 6267.50 0
2017-10-31 Multi-Stage Fracture 6179.60 6179.70 0
2017-10-31 Multi-Stage Fracture 6091.50 6091.60 0
2017-10-31 Multi-Stage Fracture 6003.40 6003.50 0
2017-10-31 Multi-Stage Fracture 5915.40 5915.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-30 2017-11-06 3,245 25,603 N/A
2 2017-11-03 2017-11-06 3,245 0 N/A
3 2017-11-04 2017-11-06 3,245 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 88.9199 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 8.6961 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 2.2376 N/A
CAN-2057 Friction Reducer Trican Friction Reducer acrylamide modified polymer 9972 100 0.0989 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0989 N/A
non-hazardous ingredients Not Available 100 0.0989 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0429 N/A
2 WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0001 N/A
WG-111Ls Trican Gelling Agent guar gum 9000-30-0 100 0.0075 N/A
mineral oil Not Available 100 0.0075 N/A
3 CAN-2200S Crosslinker / pH buffer Trican Crosslinker monoethanolamine 141-43-5 100 0.0046 N/A
water Not Available 100 0.0046 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-31 2017-11-06 Surface Water - Runoff 19891
2017-10-30 2017-11-07 Surface Water - Runoff 4629
2017-11-01 2017-11-02 Surface Water - Runoff 1519

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 357 0.0 0.0 0.0
2018 8082 0.0 0.0 0.0
2019 6666 0.0 0.0 0.0
2020 1914 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-04 No Incident Encountered 0.00 0.00
2017-11-07 No Incident Encountered 0.00 0.00
2019-05-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References