X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656061016002

Well Details

Well ID: 0656061016002
Loading map...
Location: 00/16-10-065-06W6/2
Location Alias: 00/16-10-65-06 W6M
Location Alias 2: 00/16-10-065-06 W6/02
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ KAKWA 16-10-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0468330
License Date: 2014-07-21
License Status: Issued
Spud Date: 2014-10-10
Final Drill Date: 2015-04-01
Well Total Depth: 5680.00 m
Surface Hole Latitude: 54.632627
Surface Hole Longitude: -118.835350

For data sources see[1][2]

Well History

Date Event
2014-07-21 Obtained License
2014-10-12 Surface Casing Operation Performed
2014-10-20 Direction Drilling Operation Performed - Deviate
2014-10-24 Direction Drilling Operation Performed - Horizontal
2014-10-26 Intermediate Casing Operation Performed
2015-03-09 Kick Occurred
2015-03-16 Direction Drilling Operation Performed - Horizontal
2015-04-01 Finished Drilling
2015-04-01 Well Log Performed
2015-04-01 Well Mode changed to Drilled and Cased
2015-04-04 Liner Casing Operation Performed
2015-04-06 Rig Released
2015-04-10 Perforation Treatment Performed - Open-Hole Completion
2015-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-23 Well Began Production
2015-05-23 Well Fluid changed to Gas
2015-05-23 Well Mode changed to Flowing
2015-05-30 Perforation Treatment Performed - Jet Perforation
2015-05-31 Perforation Treatment Performed - Jet Perforation
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-10-20 2933.30 Deviate (5 - 79 degrees)
2014-10-24 3326.80 Horizontal
2015-03-16 3470.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-04-10 Open Hole/Barefoot Completion 5675.00 5680.00 0
2015-05-13 Multi-Stage Fracture 4865.70 4866.70 0
2015-05-13 Multi-Stage Fracture 4769.10 4770.10 0
2015-05-13 Multi-Stage Fracture 4673.50 4674.50 0
2015-05-13 Multi-Stage Fracture 4577.50 4578.50 0
2015-05-13 Multi-Stage Fracture 4481.20 4482.20 0
2015-05-13 Multi-Stage Fracture 4385.60 4386.60 0
2015-05-13 Multi-Stage Fracture 4289.80 4290.80 0
2015-05-13 Multi-Stage Fracture 4193.40 4194.40 0
2015-05-13 Multi-Stage Fracture 4097.60 4098.60 0
2015-05-13 Multi-Stage Fracture 4001.20 4002.20 0
2015-05-12 Multi-Stage Fracture 5640.50 5641.50 0
2015-05-14 Multi-Stage Fracture 3904.70 3905.70 0
2015-05-14 Multi-Stage Fracture 3808.20 3809.20 0
2015-05-14 Multi-Stage Fracture 3712.60 3713.60 0
2015-05-14 Multi-Stage Fracture 3616.70 3617.70 0
2015-05-14 Multi-Stage Fracture 3508.00 3509.00 0
2015-05-14 Multi-Stage Fracture 3412.00 3413.00 0
2015-05-30 Perforation 5633.10 5633.60 11
2015-05-30 Perforation 5532.30 5532.80 11
2015-05-30 Perforation 5436.20 5436.70 11
2015-05-30 Perforation 5339.60 5340.10 11
2015-05-12 Multi-Stage Fracture 5539.80 5540.80 0
2015-05-30 Perforation 5243.10 5243.60 11
2015-05-30 Perforation 5146.70 5147.20 11
2015-05-30 Perforation 5050.20 5050.70 11
2015-05-30 Perforation 4953.80 4954.30 11
2015-05-30 Perforation 4858.20 4858.70 11
2015-05-30 Perforation 4761.20 4761.70 11
2015-05-30 Perforation 4665.50 4666.00 11
2015-05-30 Perforation 4570.20 4570.70 11
2015-05-31 Perforation 4473.80 4474.30 11
2015-05-31 Perforation 4378.10 4378.60 11
2015-05-12 Multi-Stage Fracture 5443.70 5444.70 0
2015-05-31 Perforation 4282.40 4282.90 11
2015-05-31 Perforation 4185.90 4186.40 11
2015-05-31 Perforation 4090.20 4090.70 11
2015-05-31 Perforation 3993.80 3994.30 11
2015-05-31 Perforation 3897.20 3897.70 11
2015-05-31 Perforation 3800.80 3801.30 11
2015-05-31 Perforation 3705.10 3705.60 11
2015-05-31 Perforation 3609.20 3609.70 11
2015-05-31 Perforation 3500.50 3501.00 11
2015-05-31 Perforation 3404.60 3405.10 11
2015-05-12 Multi-Stage Fracture 5347.10 5348.10 0
2015-05-12 Multi-Stage Fracture 5250.60 5251.60 0
2015-05-12 Multi-Stage Fracture 5154.20 5155.20 0
2015-05-12 Multi-Stage Fracture 5057.60 5058.60 0
2015-05-12 Multi-Stage Fracture 4961.30 4962.30 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-05-12 2015-05-14 3,205 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Not Available 100 90.367 N/A
SAND - CRC 30/50 Halliburton Crystalline silica. quartz 14808-60-7 100 0.0008 N/A
Phenolic Resin 9003-35-4 100 0.0007 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 5.0608 N/A
MC B-8510 Halliburton Bactericide/Biocide 2.2-Dibromo-3-dinitrilopropionamide 10222-01-2 100 0.0084 N/A
Dibromacetonitrile 3252-43-5 100 0.0084 N/A
Inert ingredient Not Available 100 0.0084 N/A
Sodium bromide 7647-15-6 100 0.0084 N/A
FR-66 Halliburton Friction Reducer Ammonium Chloride 12125-02-9 100 0.0414 N/A
Fatty Nitrogen Derived Amides / Ethoxylated Alchol 9068 100 0.0414 N/A
Hydrotreated Light Petroleum Distillate 64742-47-8 100 0.0414 N/A
Inert ingredient Not Available 100 0.0414 N/A
LOSURF-300D Halliburton Surfactant 1.2.4 Trimethylbenzene 95-63-6 100 0.0886 N/A
Ethanol 64-17-5 100 0.0887 N/A
Heavy aromatic petroleum naphtha 64742-94-5 100 0.0887 N/A
Naphthalene 91-20-3 100 0.0887 N/A
Poly(oxy-1.2-ethanediyl). alpha-(4-nonylphenyl)-omega-hydro
x
127087-87-0 100 0.0887 N/A
Proprietary ingredient(s) Trade Secret 100 0.0887 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-25 2014-11-26 Surface Water - Runoff 980
2014-11-26 2014-11-27 Surface Water - Runoff 640
2014-11-27 2014-11-27 Surface Water - Runoff 315
2015-01-06 2015-01-12 Surface Water - River 9854
2015-01-12 2015-01-12 Surface Water - Runoff 202
2015-05-11 2015-05-13 Surface Water - Runoff 6600

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4390 0.0 0.0 0.0
2016 7311 0.0 0.0 0.0
2017 4857 0.0 0.0 0.0
2018 264 0.0 0.0 0.0
2019 2227 0.0 0.0 0.0
2020 2038 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-09 Kick 3303.00 3303.00
2015-05-17 No Incident Encountered 0.00 0.00
2015-05-31 No Incident Encountered 0.00 0.00
2018-08-16 No Incident Encountered 0.00 0.00

For data sources see[9]

References