X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656061601000

Well Details

Well ID: 0656061601000
Loading map...
Location: 00/01-16-065-06W6/0
Location Alias: 00/01-16-65-06 W6M
Location Alias 2: 00/01-16-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA 100 HZ B WAPITI 1-16-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0495993
License Date: 2019-10-03
License Status: Amended
Spud Date: 2019-12-11
Final Drill Date: 2020-01-03
Well Total Depth: 5701.00 m
Surface Hole Latitude: 54.633206
Surface Hole Longitude: -118.863596

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-12-11 Nabors Drilling Limited 77 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-12-17 2925.80 Deviate (5 - 79 degrees)
2019-12-23 3326.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-12 Multi-Stage Fracture 5662.60 5678.40 0
2020-02-13 Multi-Stage Fracture 5158.30 5158.40 0
2020-02-13 Multi-Stage Fracture 5094.10 5094.20 0
2020-02-13 Multi-Stage Fracture 5030.90 5031.00 0
2020-02-13 Multi-Stage Fracture 4967.80 4967.90 0
2020-02-13 Multi-Stage Fracture 4901.80 4901.90 0
2020-02-14 Multi-Stage Fracture 4838.70 4838.80 0
2020-02-14 Multi-Stage Fracture 4775.10 4775.20 0
2020-02-14 Multi-Stage Fracture 4711.80 4711.90 0
2020-02-14 Multi-Stage Fracture 4648.60 4648.70 0
2020-02-14 Multi-Stage Fracture 4572.10 4572.20 0
2020-02-12 Multi-Stage Fracture 5608.90 5609.00 0
2020-02-14 Multi-Stage Fracture 4495.60 4495.70 0
2020-02-14 Multi-Stage Fracture 4419.20 4419.30 0
2020-02-14 Multi-Stage Fracture 4342.60 4342.70 0
2020-02-14 Multi-Stage Fracture 4266.30 4266.40 0
2020-02-14 Multi-Stage Fracture 4189.90 4190.00 0
2020-02-14 Multi-Stage Fracture 4113.80 4113.90 0
2020-02-15 Multi-Stage Fracture 4037.50 4037.60 0
2020-02-15 Multi-Stage Fracture 3961.20 3961.30 0
2020-02-15 Multi-Stage Fracture 3884.60 3884.70 0
2020-02-12 Multi-Stage Fracture 5551.60 5551.70 0
2020-02-12 Multi-Stage Fracture 5489.40 5489.50 0
2020-02-12 Multi-Stage Fracture 5434.60 5434.70 0
2020-02-12 Multi-Stage Fracture 5379.90 5380.00 0
2020-02-12 Multi-Stage Fracture 5328.20 5328.30 0
2020-02-12 Multi-Stage Fracture 5276.60 5276.70 0
2020-02-13 Multi-Stage Fracture 5224.30 5224.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 718 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-20 Kick 2995.00 2995.00
2020-02-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References