X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656061601020

Well Details

Well ID: 0656061601020
Loading map...
Location: 02/01-16-065-06W6/0
Location Alias: 02/01-16-65-06 W6M
Location Alias 2: 02/01-16-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA 102 HZ B WAPITI 1-16-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0496231
License Date: 2019-10-31
License Status: Amended
Spud Date: 2019-12-09
Final Drill Date: 2020-01-27
Well Total Depth: 5548.00 m
Surface Hole Latitude: 54.633116
Surface Hole Longitude: -118.863595

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-06 Nabors Drilling Canada Limited 77 Resumption
2019-12-09 Nabors Drilling Limited 77 Set Surface

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-11 2982.60 Deviate (5 - 79 degrees)
2020-01-14 3318.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-13 Multi-Stage Fracture 5505.20 5522.90 0
2020-02-14 Multi-Stage Fracture 4948.90 4949.00 0
2020-02-14 Multi-Stage Fracture 4890.90 4891.00 0
2020-02-14 Multi-Stage Fracture 4829.50 4829.60 0
2020-02-14 Multi-Stage Fracture 4768.10 4768.20 0
2020-02-14 Multi-Stage Fracture 4707.00 4707.10 0
2020-02-14 Multi-Stage Fracture 4647.40 4647.50 0
2020-02-14 Multi-Stage Fracture 4586.70 4586.80 0
2020-02-14 Multi-Stage Fracture 4525.60 4525.70 0
2020-02-15 Multi-Stage Fracture 4463.80 4463.90 0
2020-02-15 Multi-Stage Fracture 4402.30 4402.40 0
2020-02-13 Multi-Stage Fracture 5441.30 5441.40 0
2020-02-15 Multi-Stage Fracture 4341.00 4341.10 0
2020-02-15 Multi-Stage Fracture 4283.90 4284.00 0
2020-02-15 Multi-Stage Fracture 4222.80 4222.90 0
2020-02-15 Multi-Stage Fracture 4163.00 4163.10 0
2020-02-15 Multi-Stage Fracture 4101.50 4101.60 0
2020-02-15 Multi-Stage Fracture 4041.10 4041.20 0
2020-02-16 Multi-Stage Fracture 3979.70 3979.80 0
2020-02-16 Multi-Stage Fracture 3919.50 3919.60 0
2020-02-16 Multi-Stage Fracture 3858.80 3858.90 0
2020-02-16 Multi-Stage Fracture 3797.60 3797.70 0
2020-02-13 Multi-Stage Fracture 5379.80 5379.90 0
2020-02-16 Multi-Stage Fracture 3737.40 3737.50 0
2020-02-16 Multi-Stage Fracture 3676.20 3676.30 0
2020-02-16 Multi-Stage Fracture 3614.70 3614.80 0
2020-02-16 Multi-Stage Fracture 3553.60 3553.70 0
2020-02-16 Multi-Stage Fracture 3492.10 3492.20 0
2020-02-17 Multi-Stage Fracture 3430.20 3430.30 0
2020-02-13 Multi-Stage Fracture 5318.30 5318.40 0
2020-02-13 Multi-Stage Fracture 5256.70 5256.80 0
2020-02-13 Multi-Stage Fracture 5195.20 5195.30 0
2020-02-13 Multi-Stage Fracture 5134.00 5134.10 0
2020-02-13 Multi-Stage Fracture 5072.20 5072.30 0
2020-02-13 Multi-Stage Fracture 5010.80 5010.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 525 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-31 No Incident Encountered 0.00 0.00
2020-02-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References