X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656062214000

Well Details

Well ID: 0656062214000
Loading map...
Location: 00/14-22-065-06W6/0
Location Alias: 00/14-22-65-06 W6M
Location Alias 2: 00/14-22-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ WAPITI 14-22-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0459974
License Date: 2013-10-10
License Status: Issued
Spud Date: 2013-10-28
Final Drill Date: 2013-11-28
Well Total Depth: 5370.00 m
Surface Hole Latitude: 54.633776
Surface Hole Longitude: -118.793308

For data sources see[1][2]

Well History

Date Event
2013-10-10 Obtained License
2013-10-30 Surface Casing Operation Performed
2013-11-07 Direction Drilling Operation Performed - Deviate
2013-11-11 Direction Drilling Operation Performed - Horizontal
2013-11-11 Well Log Performed
2013-11-12 Intermediate Casing Operation Performed
2013-11-28 Finished Drilling
2013-11-28 Well Log Performed
2013-11-28 Well Mode changed to Drilled and Cased
2013-12-01 Well Log Performed
2013-12-06 Liner Casing Operation Performed
2013-12-06 Rig Released
2013-12-08 Perforation Treatment Performed - Open-Hole Completion
2013-12-17 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-21 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-03 Well Fluid changed to Gas
2014-01-03 Well Mode changed to Testing
2014-01-15 Well Began Production
2014-01-15 Well Fluid changed to Gas
2014-01-15 Well Mode changed to Flowing
2015-05-08 Perforation Treatment Performed - Jet Perforation
2015-05-09 Perforation Treatment Performed - Jet Perforation
2017-06-01 Well Fluid changed to Gas
2017-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-10-28 Nabors Drilling Limited 80 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-07 2764.20 Deviate (5 - 79 degrees)
2013-11-11 3174.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-12-08 Open Hole/Barefoot Completion 5363.00 5370.00 0
2013-12-20 Multi-Stage Fracture 4528.40 4528.50 0
2013-12-20 Multi-Stage Fracture 4415.70 4415.80 0
2013-12-20 Multi-Stage Fracture 4303.90 4304.00 0
2013-12-20 Multi-Stage Fracture 4191.30 4191.40 0
2013-12-20 Multi-Stage Fracture 4078.80 4078.90 0
2013-12-20 Multi-Stage Fracture 3969.70 3969.80 0
2013-12-20 Multi-Stage Fracture 3860.70 3860.80 0
2013-12-20 Multi-Stage Fracture 3748.10 3748.20 0
2013-12-21 Multi-Stage Fracture 3635.50 3635.60 0
2013-12-21 Multi-Stage Fracture 3523.30 3523.40 0
2013-12-17 Multi-Stage Fracture 5327.00 5327.10 0
2013-12-21 Multi-Stage Fracture 3412.40 3412.50 0
2013-12-21 Multi-Stage Fracture 3299.80 3299.90 0
2015-05-08 Perforation 5265.80 5266.30 11
2015-05-08 Perforation 5213.80 5214.30 11
2015-05-08 Perforation 5127.90 5128.40 11
2015-05-08 Perforation 5028.70 5029.20 11
2015-05-08 Perforation 4942.80 4943.30 11
2015-05-08 Perforation 4857.00 4857.50 11
2015-05-08 Perforation 4757.70 4758.20 11
2015-05-08 Perforation 4633.60 4634.10 11
2013-12-17 Multi-Stage Fracture 5221.20 5221.30 0
2015-05-08 Perforation 4520.90 4521.40 11
2015-05-09 Perforation 4408.30 4408.80 11
2015-05-09 Perforation 4296.50 4297.00 11
2015-05-09 Perforation 4183.80 4184.30 11
2015-05-09 Perforation 4071.30 4071.80 11
2015-05-09 Perforation 3962.30 3962.80 11
2015-05-09 Perforation 3853.20 3853.70 11
2015-05-09 Perforation 3740.70 3741.20 11
2015-05-09 Perforation 3628.00 3628.50 11
2015-05-09 Perforation 3515.80 3516.30 11
2013-12-17 Multi-Stage Fracture 5135.40 5135.50 0
2015-05-09 Perforation 3405.00 3405.50 11
2015-05-09 Perforation 3292.30 3292.80 11
2013-12-17 Multi-Stage Fracture 5036.20 5036.30 0
2013-12-19 Multi-Stage Fracture 4950.30 4950.40 0
2013-12-19 Multi-Stage Fracture 4864.40 4864.50 0
2013-12-19 Multi-Stage Fracture 4765.20 4765.30 0
2013-12-19 Multi-Stage Fracture 4641.00 4641.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-17 2013-12-21 3,050 15,683 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 89.2994 N/A
PR-6000 (30/50) Canyon No specific ingredients Not Available 100 0.7368 N/A
Sand (30/50) Ottawa Canyon Aluminum Oxide 1344-28-1 100 4.0003 N/A
Crystalline silica. quartz 14808-60-7 100 4.0003 N/A
Iron Oxide 1309-37-1 100 4.0003 N/A
Titanium Oxide 13463-67-7 100 4.0002 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 5.7659 N/A
Crystalline silica. quartz 14808-60-7 100 5.7659 N/A
Iron Oxide 1309-37-1 100 5.7659 N/A
Titanium Oxide 13463-67-7 100 5.766 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0132 N/A
Water 7732-18-5 100 0.0132 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0497 N/A
Water 7732-18-5 100 0.0497 N/A
CAN-2057 Friction Reducer Canyon Friction Reducer No hazardous ingredients Not Available 100 0.0496 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0846 N/A
Water 7732-18-5 100 0.0846 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-12-02 2013-12-08 Surface Water - Runoff 5353
2013-12-12 2013-12-21 Surface Water - Runoff 8010
2013-12-08 2013-12-08 Surface Water - Runoff 330
2013-12-02 2013-12-21 Municipal Water 2141

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6000 0.0 0.0 0.0
2015 7331 0.0 0.0 0.0
2016 6008 0.0 0.0 0.0
2017 2575 0.0 0.0 0.0
2018 2976 0.0 0.0 0.0
2019 8514 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-08 No Incident Encountered 0.00 0.00
2013-12-21 No Incident Encountered 0.00 0.00
2015-05-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References