X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656062403000

Well Details

Well ID: 0656062403000
Loading map...
Location: 00/03-24-065-06W6/0
Location Alias: 00/03-24-65-06 W6M
Location Alias 2: 00/03-24-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ WAPITI 3-24-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0483083
License Date: 2017-03-03
License Status: Issued
Spud Date: 2017-12-28
Final Drill Date: 2018-01-18
Well Total Depth: 5109.00 m
Surface Hole Latitude: 54.646652
Surface Hole Longitude: -118.789925

For data sources see[1][2]

Well History

Date Event
2017-03-03 Obtained License
2017-12-29 Surface Casing Operation Performed
2017-12-31 Direction Drilling Operation Performed - Deviate
2018-01-08 Direction Drilling Operation Performed - Horizontal
2018-01-08 Well Log Performed
2018-01-09 Intermediate Casing Operation Performed
2018-01-18 Finished Drilling
2018-01-18 Well Log Performed
2018-01-18 Well Mode changed to Drilled and Cased
2018-01-21 Liner Casing Operation Performed
2018-01-22 Perforation Treatment Performed - Open-Hole Completion
2018-01-22 Rig Released
2018-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-13 Perforation Treatment Performed - Jet Perforation
2018-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-14 Perforation Treatment Performed - Jet Perforation
2018-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-15 Perforation Treatment Performed - Jet Perforation
2018-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-16 Perforation Treatment Performed - Jet Perforation
2018-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-17 Perforation Treatment Performed - Jet Perforation
2018-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-01 Well Began Production
2018-03-01 Well Fluid changed to Gas
2018-03-01 Well Mode changed to Flowing
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-28 Nabors Drilling Canada Limited 79 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-31 1100.90 Deviate (5 - 79 degrees)
2018-01-08 3178.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-22 Open Hole/Barefoot Completion 5104.00 5109.00 0
2018-02-09 Multi-Stage Fracture 4709.80 4709.90 0
2018-02-11 Multi-Stage Fracture 4664.60 4664.70 0
2018-02-11 Multi-Stage Fracture 4619.30 4619.40 0
2018-02-11 Multi-Stage Fracture 4573.00 4573.10 0
2018-02-11 Multi-Stage Fracture 4527.40 4527.50 0
2018-02-11 Multi-Stage Fracture 4482.10 4482.20 0
2018-02-11 Multi-Stage Fracture 4436.10 4436.20 0
2018-02-11 Multi-Stage Fracture 4391.20 4391.30 0
2018-02-11 Multi-Stage Fracture 4344.80 4344.90 0
2018-02-13 Multi-Stage Fracture 4299.20 4299.30 0
2018-02-09 Multi-Stage Fracture 5094.60 5098.20 0
2018-02-13 Multi-Stage Fracture 4267.30 4267.40 0
2018-02-13 Multi-Stage Fracture 4222.10 4222.20 0
2018-02-13 Perforation 4171.00 4172.00 13
2018-02-13 Multi-Stage Fracture 4171.00 4172.00 0
2018-02-13 Perforation 4128.00 4129.00 13
2018-02-13 Multi-Stage Fracture 4128.00 4129.00 0
2018-02-13 Perforation 4081.00 4082.00 13
2018-02-13 Multi-Stage Fracture 4081.00 4082.00 0
2018-02-13 Perforation 4027.00 4028.00 13
2018-02-14 Multi-Stage Fracture 4027.00 4028.00 0
2018-02-09 Multi-Stage Fracture 5049.80 5049.90 0
2018-02-14 Perforation 3974.00 3975.00 13
2018-02-14 Multi-Stage Fracture 3974.00 3975.00 0
2018-02-14 Perforation 3919.00 3920.00 13
2018-02-14 Multi-Stage Fracture 3919.00 3920.00 0
2018-02-14 Perforation 3864.00 3865.00 13
2018-02-14 Multi-Stage Fracture 3864.00 3865.00 0
2018-02-14 Perforation 3810.00 3811.00 13
2018-02-15 Multi-Stage Fracture 3810.00 3811.00 0
2018-02-15 Perforation 3755.00 3756.00 13
2018-02-15 Multi-Stage Fracture 3755.00 3756.00 0
2018-02-09 Multi-Stage Fracture 4994.60 4994.70 0
2018-02-15 Perforation 3701.00 3702.00 13
2018-02-15 Multi-Stage Fracture 3701.00 3702.00 0
2018-02-15 Perforation 3646.00 3647.00 13
2018-02-15 Multi-Stage Fracture 3646.00 3647.00 0
2018-02-16 Perforation 3592.00 3593.00 13
2018-02-16 Multi-Stage Fracture 3592.00 3593.00 0
2018-02-16 Perforation 3537.00 3538.00 13
2018-02-16 Multi-Stage Fracture 3537.00 3538.00 0
2018-02-16 Perforation 3483.00 3484.00 13
2018-02-16 Multi-Stage Fracture 3483.00 3484.00 0
2018-02-09 Multi-Stage Fracture 4936.60 4936.70 0
2018-02-16 Perforation 3428.00 3429.00 13
2018-02-16 Multi-Stage Fracture 3428.00 3429.00 0
2018-02-16 Perforation 3374.00 3375.00 13
2018-02-16 Multi-Stage Fracture 3374.00 3375.00 0
2018-02-17 Perforation 3319.00 3320.00 13
2018-02-17 Multi-Stage Fracture 3319.00 3320.00 0
2018-02-17 Perforation 3265.00 3266.00 13
2018-02-17 Multi-Stage Fracture 3265.00 3266.00 0
2018-02-09 Multi-Stage Fracture 4892.10 4892.20 0
2018-02-09 Multi-Stage Fracture 4847.50 4847.60 0
2018-02-09 Multi-Stage Fracture 4801.60 4801.70 0
2018-02-09 Multi-Stage Fracture 4756.10 4756.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-09 2018-02-17 3,040 29,815 N/A
2 2018-02-13 2018-02-13 3,040 0 N/A
3 2018-02-13 2018-02-17 3,040 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.8039 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 8.7914 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 2.2734 N/A
SFR-302 (Friction Reducer) Step Energy Services Friction Reducer Proprietary Trade Secret 100 0.0222 N/A
Sodium Chloride 7647-14-5 100 0.0222 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0357 N/A
Non-Hazardous Ingredients Not Available 100 0.0357 N/A
2 30/50 FloPRO PTT Step Energy Services Crystalline Silica 14808-60-7 100 5.7018 N/A
3 SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0002 N/A
Cured Acrylic Resin Not Available 100 0.0002 N/A
Non-Hazardous Ingredients Not Available 100 0.0002 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.0092 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0092 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-30 2018-02-13 Groundwater - Non-saline greater than 150m deep 2846
2018-01-30 2018-02-13 Surface Water - River 26968

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6524 0.0 0.0 0.0
2019 8145 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-22 No Incident Encountered 0.00 0.00
2018-02-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References