X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656062408000

Well Details

Well ID: 0656062408000
Loading map...
Location: 00/08-24-065-06W6/0
Location Alias: 00/08-24-65-06 W6M
Location Alias 2: 00/08-24-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ WAPITI 8-24-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0483081
License Date: 2017-03-03
License Status: Issued
Spud Date: 2018-01-03
Final Drill Date: 2018-01-24
Well Total Depth: 5044.00 m
Surface Hole Latitude: 54.649139
Surface Hole Longitude: -118.782371

For data sources see[1][2]

Well History

Date Event
2017-03-03 Obtained License
2018-01-04 Surface Casing Operation Performed
2018-01-10 Direction Drilling Operation Performed - Deviate
2018-01-14 Direction Drilling Operation Performed - Horizontal
2018-01-15 Well Log Performed
2018-01-16 Intermediate Casing Operation Performed
2018-01-24 Finished Drilling
2018-01-24 Well Log Performed
2018-01-24 Well Mode changed to Drilled and Cased
2018-01-26 Well Log Performed
2018-01-29 Liner Casing Operation Performed
2018-01-30 Rig Released
2018-03-17 Well Log Performed
2018-03-21 Perforation Treatment Performed - Jet Perforation
2018-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-22 Perforation Treatment Performed - Jet Perforation
2018-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-23 Perforation Treatment Performed - Jet Perforation
2018-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-24 Perforation Treatment Performed - Jet Perforation
2018-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-25 Perforation Treatment Performed - Jet Perforation
2018-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-26 Perforation Treatment Performed - Jet Perforation
2018-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-27 Perforation Treatment Performed - Jet Perforation
2018-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-28 Perforation Treatment Performed - Jet Perforation
2018-03-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-29 Perforation Treatment Performed - Jet Perforation
2018-03-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-28 Well Began Production
2018-04-28 Well Fluid changed to Gas
2018-04-28 Well Mode changed to Flowing
2019-09-01 Well Fluid changed to Gas
2019-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-03 Nabors Drilling Canada Limited 78 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-10 2743.00 Deviate (5 - 79 degrees)
2018-01-14 3177.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-21 Multi-Stage Fracture 4989.60 5002.80 0
2018-03-23 Perforation 4746.20 4780.10 20
2018-03-23 Multi-Stage Fracture 4746.20 4780.10 0
2018-03-23 Perforation 4696.40 4730.30 20
2018-03-23 Multi-Stage Fracture 4696.40 4730.30 0
2018-03-24 Perforation 4646.60 4679.80 20
2018-03-24 Multi-Stage Fracture 4646.60 4679.80 0
2018-03-24 Perforation 4596.80 4630.00 20
2018-03-24 Multi-Stage Fracture 4596.80 4630.00 0
2018-03-24 Perforation 4547.00 4580.20 20
2018-03-24 Multi-Stage Fracture 4547.00 4580.20 0
2018-03-21 Perforation 4945.40 4978.60 10
2018-03-24 Perforation 4497.20 4530.40 20
2018-03-24 Multi-Stage Fracture 4497.20 4530.40 0
2018-03-25 Perforation 4447.40 4480.60 20
2018-03-25 Multi-Stage Fracture 4447.40 4480.60 0
2018-03-25 Perforation 4397.60 4430.80 20
2018-03-25 Multi-Stage Fracture 4397.60 4430.80 0
2018-03-25 Perforation 4347.80 4381.00 20
2018-03-25 Multi-Stage Fracture 4347.80 4381.00 0
2018-03-25 Perforation 4298.00 4331.20 20
2018-03-25 Multi-Stage Fracture 4298.00 4331.20 0
2018-03-21 Multi-Stage Fracture 4945.40 4978.60 0
2018-03-26 Perforation 4248.20 4281.40 20
2018-03-26 Multi-Stage Fracture 4248.20 4281.40 0
2018-03-26 Perforation 4198.40 4231.60 20
2018-03-26 Multi-Stage Fracture 4198.40 4231.60 0
2018-03-26 Perforation 4148.60 4181.80 20
2018-03-26 Multi-Stage Fracture 4148.60 4181.80 0
2018-03-26 Perforation 4073.60 4133.60 20
2018-03-26 Multi-Stage Fracture 4073.60 4133.60 0
2018-03-27 Perforation 3998.60 4058.60 20
2018-03-27 Multi-Stage Fracture 3998.60 4058.60 0
2018-03-22 Perforation 4895.60 4928.80 20
2018-03-27 Perforation 3923.60 3983.60 20
2018-03-27 Multi-Stage Fracture 3923.60 3983.60 0
2018-03-27 Perforation 3873.80 3907.00 20
2018-03-27 Multi-Stage Fracture 3873.80 3907.00 0
2018-03-27 Perforation 3824.00 3857.20 20
2018-03-27 Multi-Stage Fracture 3824.00 3857.20 0
2018-03-28 Perforation 3772.20 3807.40 20
2018-03-28 Multi-Stage Fracture 3772.20 3807.40 0
2018-03-28 Perforation 3722.70 3757.60 20
2018-03-28 Multi-Stage Fracture 3722.70 3757.60 0
2018-03-22 Multi-Stage Fracture 4895.60 4928.80 0
2018-03-28 Perforation 3675.60 3707.80 20
2018-03-28 Multi-Stage Fracture 3675.60 3707.80 0
2018-03-28 Perforation 3624.80 3658.00 20
2018-03-28 Multi-Stage Fracture 3624.80 3658.00 0
2018-03-29 Perforation 3575.00 3608.20 20
2018-03-29 Multi-Stage Fracture 3575.00 3608.20 0
2018-03-29 Perforation 3500.00 3559.00 20
2018-03-29 Multi-Stage Fracture 3500.00 3559.00 0
2018-03-29 Perforation 3425.00 3485.00 20
2018-03-29 Multi-Stage Fracture 3425.00 3485.00 0
2018-03-22 Perforation 4845.80 4877.70 20
2018-03-29 Perforation 3350.00 3410.00 20
2018-03-29 Multi-Stage Fracture 3350.00 3410.00 0
2018-03-22 Multi-Stage Fracture 4845.80 4877.70 0
2018-03-22 Perforation 4796.00 4829.90 20
2018-03-22 Multi-Stage Fracture 4796.00 4829.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-21 2018-03-29 3,038 27,665 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.8359 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 8.7103 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 2.01 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.4336 N/A
Water 7732-18-5 100 0.4336 N/A
SABB-1 (Acid Corroision Inhibitor) Step Energy Services Acid 2-Propanol 67-63-0 100 0.0017 N/A
Ethylene Glycol 107-21-1 100 0.0017 N/A
Methyl Alcohol 67-56-1 100 0.0017 N/A
Non-Hazardous Ingredients Not Available 100 0.0017 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0002 N/A
Cured Acrylic Resin Not Available 100 0.0002 N/A
Non-Hazardous Ingredients Not Available 100 0.0002 N/A
SFR-302 (Friction Reducer) Step Energy Services Friction Reducer Proprietary Trade Secret 100 0.0241 N/A
Sodium Chloride 7647-14-5 100 0.0241 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.0079 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0079 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0353 N/A
Non-Hazardous Ingredients Not Available 100 0.0353 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0008 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0008 N/A
Methanol 67-56-1 100 0.0008 N/A
Monoethanolamine 141-43-5 100 0.0008 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0008 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0008 N/A
Water 7732-18-5 100 0.0008 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-24 2018-03-24 Surface Water - Runoff 1345
2018-02-19 2018-02-23 Surface Water - River 26655

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5498 0.0 0.0 0.0
2019 7484 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-30 No Incident Encountered 0.00 0.00
2018-03-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References