If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0656062605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.643443,"lon":-118.778016,"icon":""}]} |
| Location: 00/05-26-065-06W6/0 | |
| Location Alias: 00/05-26-65-06 W6M | |
| Location Alias 2: 00/05-26-065-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 065 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 26 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: NUVISTA HZ BILBO 5-26-65-6 | |
| Operator Name: NuVista Energy Ltd. | |
| License Number: 0457245 | |
| License Date: 2013-05-30 | |
| License Status: Issued | |
| Spud Date: 2013-07-29 | |
| Final Drill Date: 2013-09-02 | |
| Well Total Depth: 5103.00 m | |
| Surface Hole Latitude: 54.643443 | |
| Surface Hole Longitude: -118.778016 |
| Date | Event |
|---|---|
| 2013-05-30 | Obtained License |
| 2013-07-29 | Lost Circulation Occurred |
| 2013-08-02 | Surface Casing Operation Performed |
| 2013-08-02 | Well Log Performed |
| 2013-08-11 | Direction Drilling Operation Performed - Deviate |
| 2013-08-18 | Direction Drilling Operation Performed - Horizontal |
| 2013-08-19 | Well Log Performed |
| 2013-08-20 | Intermediate Casing Operation Performed |
| 2013-09-02 | Finished Drilling |
| 2013-09-02 | Well Mode changed to Drilled and Cased |
| 2013-09-05 | Liner Casing Operation Performed |
| 2013-09-07 | Rig Released |
| 2013-09-08 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-09-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-10-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-10-02 | Well Fluid changed to Gas |
| 2013-10-02 | Well Mode changed to Testing |
| 2013-10-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-10-18 | Well Began Production |
| 2013-10-18 | Well Fluid changed to Gas |
| 2013-10-18 | Well Mode changed to Flowing |
| 2016-11-01 | Well Fluid changed to Gas |
| 2016-11-01 | Well Mode changed to Pumping |
| 2019-04-01 | Well Fluid changed to Gas |
| 2019-04-01 | Well Mode changed to Suspended |
| 2019-09-20 | Well Fluid changed to Gas |
| 2019-09-20 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-07-29 | Nabors Drilling Limited | 80 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-08-11 | 2772.50 | Deviate (5 - 79 degrees) |
| 2013-08-18 | 3173.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-09-08 | Open Hole/Barefoot Completion | 5098.00 | 5103.00 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 4395.50 | 4395.60 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 4306.10 | 4306.20 | 0 |
| 2013-10-01 | Multi-Stage Fracture | 4216.60 | 4216.70 | 0 |
| 2013-10-01 | Multi-Stage Fracture | 4127.10 | 4127.20 | 0 |
| 2013-10-03 | Multi-Stage Fracture | 3617.60 | 3617.70 | 0 |
| 2013-10-03 | Multi-Stage Fracture | 4037.80 | 4037.90 | 0 |
| 2013-10-03 | Multi-Stage Fracture | 3961.80 | 3961.90 | 0 |
| 2013-10-03 | Multi-Stage Fracture | 3872.40 | 3872.50 | 0 |
| 2013-10-03 | Multi-Stage Fracture | 3783.00 | 3783.10 | 0 |
| 2013-10-03 | Multi-Stage Fracture | 3693.50 | 3693.60 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 5075.40 | 5075.50 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 4994.60 | 4994.70 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 4905.20 | 4905.30 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 4815.80 | 4815.90 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 4739.70 | 4739.80 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 4650.40 | 4650.50 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 4561.10 | 4561.20 | 0 |
| 2013-09-30 | Multi-Stage Fracture | 4471.60 | 4471.70 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-09-30 | 2013-10-03 | 3,025 | 11,029 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 90.6944 | N/A | |||
| CarboBond RCS-C (30/50) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 0.7108 | N/A | ||
| Hexamethylenetetramine | 100-97-0 | 100 | 0.7108 | N/A | ||||
| Phenol formaldehyde resin | 9003-35-4 | 100 | 0.7108 | N/A | ||||
| Sand (30/50) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.1522 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 4.1522 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 4.1522 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 4.1522 | N/A | ||||
| Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 6.0658 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 6.0658 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 6.0658 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 6.0658 | N/A | ||||
| CarboBond LTCA Resin Activator | Canyon | Activator | Alcohols. C12-14 Secondary. Ethoxylated | 84133-50-6 | 100 | 0.0004 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0004 | N/A | ||||
| Polyethylene glycol | 25322-68-3 | 100 | 0.0004 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0139 | N/A | |
| Water | 7732-18-5 | 100 | 0.0139 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0503 | N/A | |
| Water | 7732-18-5 | 100 | 0.0503 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon | Friction Reducer | No hazardous ingredients | Not Available | 100 | 0.0463 | N/A | |
| CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0867 | N/A | |
| Water | 7732-18-5 | 100 | 0.0867 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-09-24 | 2013-10-03 | Surface Water - River | 11029 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 1497 | 0.0 | 0.0 | 0.0 |
| 2014 | 6371 | 0.0 | 0.0 | 0.0 |
| 2015 | 6216 | 0.0 | 0.0 | 0.0 |
| 2016 | 5245 | 0.0 | 0.0 | 0.0 |
| 2017 | 1800 | 0.0 | 0.0 | 0.0 |
| 2018 | 24 | 0.0 | 0.0 | 0.0 |
| 2019 | 2431 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-07-29 | Lost Circulation | 45.00 | 80.00 |
| 2013-10-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]