X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656062716000

Well Details

Well ID: 0656062716000
Loading map...
Location: 00/16-27-065-06W6/0
Location Alias: 00/16-27-65-06 W6M
Location Alias 2: 00/16-27-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ WAPITI 16-27-65-6
Operator Name: NuVista Energy Ltd.
License Number: 0470033
License Date: 2014-09-17
License Status: Amended
Spud Date: 2015-06-02
Final Drill Date: 2015-08-16
Well Total Depth: 5780.00 m
Surface Hole Latitude: 54.644630
Surface Hole Longitude: -118.776531

For data sources see[1][2]

Well History

Date Event
2014-09-17 Obtained License
2015-06-02 Well Mode changed to Preset
2015-06-03 Lost Circulation Occurred
2015-06-05 Surface Casing Operation Performed
2015-07-27 Direction Drilling Operation Performed - Deviate
2015-08-01 Direction Drilling Operation Performed - Horizontal
2015-08-02 Intermediate Casing Operation Performed
2015-08-14 Well Log Performed
2015-08-16 Finished Drilling
2015-08-16 Well Mode changed to Drilled and Cased
2015-08-17 Liner Casing Operation Performed
2015-08-19 Rig Released
2015-08-22 Perforation Treatment Performed - Open-Hole Completion
2015-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-27 Perforation Treatment Performed - Fractured
2015-09-27 Perforation Treatment Performed - Jet Perforation
2015-09-28 Perforation Treatment Performed - Fractured
2015-09-28 Perforation Treatment Performed - Jet Perforation
2015-09-29 Perforation Treatment Performed - Fractured
2015-09-29 Perforation Treatment Performed - Jet Perforation
2015-10-03 Perforation Treatment Performed - Jet Perforation
2015-10-03 Well Fluid changed to Gas
2015-10-03 Well Mode changed to Testing
2015-10-04 Perforation Treatment Performed - Jet Perforation
2015-10-05 Perforation Treatment Performed - Jet Perforation
2015-11-13 Well Began Production
2015-11-13 Well Fluid changed to Gas
2015-11-13 Well Mode changed to Flowing
2018-04-01 Well Fluid changed to Gas
2018-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-07-27 2793.40 Deviate (5 - 79 degrees)
2015-08-01 3148.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-22 Open Hole/Barefoot Completion 5770.00 5780.00 0
2015-09-17 Multi-Stage Fracture 5091.90 5092.00 0
2015-09-17 Multi-Stage Fracture 5010.70 5010.80 0
2015-09-17 Multi-Stage Fracture 4929.50 4929.60 0
2015-09-17 Multi-Stage Fracture 4848.20 4848.30 0
2015-09-17 Multi-Stage Fracture 4766.90 4767.00 0
2015-09-17 Multi-Stage Fracture 4685.60 4685.70 0
2015-09-18 Multi-Stage Fracture 4604.30 4604.40 0
2015-09-18 Multi-Stage Fracture 4523.10 4523.20 0
2015-09-18 Multi-Stage Fracture 4442.20 4442.30 0
2015-09-18 Multi-Stage Fracture 4360.90 4361.00 0
2015-09-15 Multi-Stage Fracture 5735.40 5735.50 0
2015-09-18 Multi-Stage Fracture 4279.70 4279.80 0
2015-09-18 Multi-Stage Fracture 4198.40 4198.50 0
2015-09-18 Multi-Stage Fracture 4117.40 4117.50 0
2015-09-18 Multi-Stage Fracture 4036.20 4036.30 0
2015-09-18 Multi-Stage Fracture 3955.00 3955.10 0
2015-09-19 Multi-Stage Fracture 3873.70 3873.80 0
2015-09-27 Perforation 3800.00 3801.00 13
2015-09-27 Fracture 3800.00 3801.00 0
2015-09-28 Perforation 3729.50 3730.50 13
2015-09-28 Fracture 3729.50 3730.50 0
2015-09-16 Multi-Stage Fracture 5660.50 5660.60 0
2015-09-28 Perforation 3664.00 3665.00 13
2015-09-28 Fracture 3664.00 3665.00 0
2015-09-28 Perforation 3596.00 3597.00 13
2015-09-29 Fracture 3596.00 3597.00 0
2015-09-29 Perforation 3527.00 3528.00 13
2015-09-29 Fracture 3527.00 3528.00 0
2015-09-29 Perforation 3460.00 3461.00 13
2015-09-29 Fracture 3460.00 3461.00 0
2015-09-29 Perforation 3393.00 3394.00 13
2015-09-29 Fracture 3393.00 3394.00 0
2015-09-16 Multi-Stage Fracture 5579.20 5579.30 0
2015-10-03 Perforation 5728.00 5728.50 20
2015-10-03 Perforation 5653.00 5653.50 20
2015-10-03 Perforation 5571.70 5572.20 20
2015-10-03 Perforation 5490.50 5491.00 20
2015-10-03 Perforation 5409.20 5409.70 20
2015-10-03 Perforation 5328.00 5328.50 20
2015-10-03 Perforation 5246.60 5247.10 20
2015-10-03 Perforation 5165.70 5166.20 20
2015-10-04 Perforation 5084.40 5084.90 20
2015-10-04 Perforation 5003.20 5003.70 20
2015-09-16 Multi-Stage Fracture 5497.90 5498.00 0
2015-10-04 Perforation 4922.00 4922.50 20
2015-10-04 Perforation 4840.70 4841.20 20
2015-10-05 Perforation 4759.40 4759.90 20
2015-10-05 Perforation 4678.10 4678.60 20
2015-10-05 Perforation 4596.00 4597.00 20
2015-10-05 Perforation 4517.60 4518.10 20
2015-10-05 Perforation 4434.70 4435.20 20
2015-10-05 Perforation 4353.40 4353.90 20
2015-10-05 Perforation 4272.20 4272.70 20
2015-10-05 Perforation 4190.90 4191.40 20
2015-09-16 Multi-Stage Fracture 5416.70 5416.80 0
2015-10-05 Perforation 4110.00 4110.50 20
2015-10-05 Perforation 4028.70 4029.20 20
2015-10-05 Perforation 3947.50 3948.00 20
2015-10-05 Perforation 3866.20 3866.70 20
2015-09-16 Multi-Stage Fracture 5335.40 5335.50 0
2015-09-16 Multi-Stage Fracture 5254.10 5254.20 0
2015-09-17 Multi-Stage Fracture 5173.20 5173.30 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-15 2015-09-29 3,044 0 N/A
2 2015-09-27 2015-09-29 3,044 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Not Available 100 89.0112 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 5.4198 N/A
SAND-PRC-30/50 Halliburton Crystalline Silica (Quartz) 14808-60-7 100 0.8259 N/A
Phenol-formaldehyde Novolak Resin 9003-35-4 100 0.8231 N/A
MC B-8510 Halliburton Bactericide/Biocide 2.2-Dibromo-3-dinitrilopropionamide 10222-01-2 100 0.0085 N/A
Dibromacetonitrile 3252-43-5 100 0.0085 N/A
Inert ingredient Not Available 100 0.0085 N/A
Sodium bromide 7647-15-6 100 0.0085 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0434 N/A
Ethoxylated alcohols/Fatty nitrogen derived amides 9068 100 0.0434 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0434 N/A
Inert ingredient Not Available 100 0.0434 N/A
Proprietary ingredient(s) Trade Secret 100 0.0416 N/A
LOSURF-300D Halliburton Surfactant 1.2.4 Trimethylbenzene 95-63-6 100 0.0871 N/A
Ethanol 64-17-5 100 0.0871 N/A
Heavy aromatic petroleum naphtha 64742-94-5 100 0.0871 N/A
Naphthalene 91-20-3 100 0.0871 N/A
Poly(oxy-1.2-ethanediyl). alpha-(4-nonylphenyl)-omega-hydro
x
127087-87-0 100 0.0871 N/A
Proprietary ingredient(s) Trade Secret 100 0.0871 N/A
2 OPTIFLO-IIIA Halliburton Breaker Ammonium persulfate 7727-54-0 100 0.0003 N/A
Inert ingredient Not Available 100 0.0003 N/A
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.0048 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-15 2015-09-17 Surface Water - Runoff 16931
2015-09-29 2015-09-29 Surface Water - Runoff 1928
2015-09-28 2015-09-28 Surface Water - Runoff 1375
2015-09-28 2015-09-29 Surface Water - Runoff 3700

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1137 0.0 0.0 0.0
2016 8255 0.0 0.0 0.0
2017 7313 0.0 0.0 0.0
2018 6130 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-03 Lost Circulation 37.00 193.00
2015-08-22 No Incident Encountered 0.00 0.00
2015-09-19 No Incident Encountered 0.00 0.00
2015-10-05 No Incident Encountered 0.00 0.00

For data sources see[9]

References