X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656133206000

Well Details

Well ID: 0656133206000
Loading map...
Location: 00/06-32-065-13W6/0
Location Alias: 00/06-32-65-13 W6M
Location Alias 2: 00/06-32-065-13 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 13
Section: 32
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY CHINOOKR 6-32-65-13
Operator Name: Tourmaline Oil Corp.
License Number: 0437952
License Date: 2011-10-24
License Status: Amended
Spud Date: 2011-11-26
Final Drill Date: 2012-03-27
Well Total Depth: 4154.00 m
Surface Hole Latitude: 54.664973
Surface Hole Longitude: -119.943742

For data sources see[1][2]

Well History

Date Event
2011-10-24 Obtained License
2011-11-29 Surface Casing Operation Performed
2011-12-05 Direction Drilling Operation Performed - Horizontal
2011-12-21 Intermediate Casing Operation Performed
2012-03-22 Well Log Performed
2012-03-27 Finished Drilling
2012-03-27 Well Mode changed to Drilled and Cased
2012-03-30 Well Log Performed
2012-03-31 Production Casing Operation Performed
2012-04-02 Rig Released
2012-08-06 Perforation Treatment Performed - Open-Hole Completion
2012-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-11 Well Began Production
2012-08-11 Well Fluid changed to Gas
2012-08-11 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-05 1555.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-06 Open Hole/Barefoot Completion 4149.00 4154.00 0
2012-08-08 Multi-Stage Fracture 4115.70 4128.70 0
2012-08-08 Multi-Stage Fracture 4060.90 4061.00 0
2012-08-09 Multi-Stage Fracture 3994.00 3994.10 0
2012-08-09 Multi-Stage Fracture 3927.40 3927.50 0
2012-08-09 Multi-Stage Fracture 3862.00 3862.10 0
2012-08-09 Multi-Stage Fracture 3795.40 3795.50 0
2012-08-10 Multi-Stage Fracture 3728.50 3728.60 0
2012-08-10 Multi-Stage Fracture 3560.10 3560.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3198 0.0 0.0 0.0
2013 8577 0.0 0.0 0.0
2014 7104 0.0 0.0 0.0
2015 8183 0.0 0.0 0.0
2016 8017 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8447 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-02 No Incident Encountered 0.00 0.00
2012-09-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References