X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665093204000

Well Details

Well ID: 0665093204000
Loading map...
Location: 00/04-32-066-09W5/0
Location Alias: 00/04-32-66-09 W5M
Location Alias 2: 00/04-32-066-09 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 09
Section: 32
County/Municipality: Big Lakes County
Well Name: ASPENLEAF SWANH 4-32-66-9
Operator Name: Aspenleaf Energy Limited
License Number: 0022015
License Date: 1962-01-30
License Status: Amended
Spud Date: 1962-02-18
Final Drill Date: 1962-03-16
Well Total Depth: 2626.80 m
Surface Hole Latitude: 54.750238
Surface Hole Longitude: -115.333760

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-01-30 Obtained License
1962-03-16 Finished Drilling
1962-03-16 Well Mode changed to Drilled and Cased
1962-03-17 Production Casing Operation Performed
1962-03-18 Perforation Treatment Performed - Permeator Perforation
1962-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-04-09 Well Began Production
1962-04-09 Well Fluid changed to Crude Oil
1962-04-09 Well Mode changed to Flowing
1973-06-14 Well Fluid changed to Crude Oil
1973-06-14 Well Mode changed to Pumping
2003-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-03 Plug Back Performed
2005-04-03 Well Fluid changed to Crude Oil
2005-04-03 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-03-18 Permeator Perforation 2579.80 2590.80 0
1962-03-18 Permeator Perforation 2598.40 2601.50 0
1962-03-18 Permeator Perforation 2611.20 2614.30 0
1962-03-26 Acid Treatment 2579.80 2614.30 0
2003-08-18 Acid Treatment 2579.80 2614.50 0
2005-04-03 Packing Device Capped w/Cement 2567.00 2575.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8339 0.0 0.0 0.0
1968 8534 0.0 0.0 0.0
1969 8617 0.0 0.0 0.0
1970 8687 0.0 0.0 0.0
1971 8556 0.0 0.0 0.0
1972 8179 0.0 0.0 0.0
1973 8616 0.0 0.0 0.0
1974 8231 0.0 0.0 0.0
1975 8016 0.0 0.0 0.0
1976 8160 0.0 0.0 0.0
1977 6002 0.0 0.0 0.0
1978 7139 0.0 0.0 0.0
1979 7593 0.0 0.0 0.0
1980 7480 0.0 0.0 0.0
1981 7893 0.0 0.0 0.0
1982 8477 0.0 0.0 0.0
1983 7286 0.0 0.0 0.0
1984 8637 0.0 0.0 0.0
1985 8177 0.0 0.0 0.0
1986 8437 0.0 0.0 0.0
1987 8539 0.0 0.0 0.0
1988 8224 0.0 0.0 0.0
1989 6507 0.0 0.0 0.0
1990 8676 0.0 0.0 0.0
1991 5438 0.0 0.0 0.0
2003 2975 0.0 0.0 0.0
2004 8560 0.0 0.0 0.0
2005 2251 0.0 0.0 0.0

For data sources see[5]

References