X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665162508000

Well Details

Well ID: 0665162508000
Loading map...
Location: 00/08-25-066-16W5/0
Location Alias: 00/08-25-66-16 W5M
Location Alias 2: 00/08-25-066-16 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 16
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: N7 ENERGY MEEKWAP 8-25-66-16
Operator Name: N7 Energy Ltd.
License Number: 0029556
License Date: 1965-12-07
License Status: Suspension
Spud Date: 1966-01-17
Final Drill Date: 1966-02-18
Well Total Depth: 2805.10 m
Surface Hole Latitude: 54.739674
Surface Hole Longitude: -116.272827

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-12-07 Obtained License
1966-01-28 Drill Stem Test Performed
1966-02-02 Drill Stem Test Performed
1966-02-18 Finished Drilling
1966-02-18 Well Mode changed to Drilled and Cased
1966-02-22 Drill Stem Test Performed
1966-02-24 Production Casing Operation Performed
1966-03-02 Perforation Treatment Performed - Bullet Perforation
1966-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-05 Well Began Production
1966-03-05 Well Fluid changed to Crude Oil
1966-03-05 Well Mode changed to Flowing
1967-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-05-27 Well Fluid changed to Crude Oil
1975-05-27 Well Mode changed to Pumping
1985-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-18 Perforation Treatment Performed - Jet Perforation
1986-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Suspended
2008-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-03-02 Bullet Perforation 2277.20 2280.80 13
1966-03-04 Acid Treatment 2277.20 2280.80 0
1967-01-20 Acid Treatment 2277.20 2280.80 0
1985-03-12 Acid Treatment 2277.20 2280.80 0
1986-01-18 Perforation 2277.20 2284.50 13
1986-01-19 Acid Treatment 2277.20 2284.50 0
2008-12-21 Packing Device Capped w/Cement 2259.20 2267.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1 0.0 0.0 0.0
1969 387 0.0 0.0 0.0
1970 1594 0.0 0.0 0.0
1971 6565 0.0 0.0 0.0
1972 7791 0.0 0.0 0.0
1973 5442 0.0 0.0 0.0
1974 7102 0.0 0.0 0.0
1975 2186 0.0 0.0 0.0
1976 3497 0.0 0.0 0.0
1977 3400 0.0 0.0 0.0
1978 1870 0.0 0.0 0.0
1979 2091 0.0 0.0 0.0
1980 3536 0.0 0.0 0.0
1981 1317 0.0 0.0 0.0
1982 2829 0.0 0.0 0.0
1983 6103 0.0 0.0 0.0
1984 6953 0.0 0.0 0.0
1985 5184 0.0 0.0 0.0
1986 4417 0.0 0.0 0.0
1987 6293 0.0 0.0 0.0
1988 8077 0.0 0.0 0.0
1989 6882 0.0 0.0 0.0
1990 7578 0.0 0.0 0.0
1991 6893 0.0 0.0 0.0
1992 7429 0.0 0.0 0.0
1993 6413 0.0 0.0 0.0

For data sources see[5]

References