X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665210411002

Well Details

Well ID: 0665210411002
Loading map...
Location: 00/11-04-066-21W5/2
Location Alias: 00/11-04-66-21 W5M
Location Alias 2: 00/11-04-066-21 W5/02
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 21
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: MDC GIROUXLK 11-4-66-21
Operator Name: Clampett Energy Ltd.
License Number: 0085236
License Date: 1980-08-26
License Status: Suspension
Spud Date: 1980-09-06
Final Drill Date: 1980-09-14
Well Total Depth: 1418.00 m
Surface Hole Latitude: 54.685789
Surface Hole Longitude: -117.118452

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-26 Obtained License
1980-09-14 Finished Drilling
1980-09-14 Well Mode changed to Drilled and Cased
1980-09-15 Drill Stem Test Performed
1980-09-17 Production Casing Operation Performed
1980-12-15 Perforation Treatment Performed - Jet Perforation
2002-05-17 Perforation Treatment Performed - Jet Perforation
2002-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-23 Plug Back Performed
2002-05-24 Perforation Treatment Performed - Jet Perforation
2002-06-06 Perforation Treatment Performed - Fractured
2002-07-01 Well Began Production
2002-07-01 Well Fluid changed to Gas
2002-07-01 Well Mode changed to Flowing
2011-03-01 Well Fluid changed to Gas
2011-03-01 Well Mode changed to Suspended
2017-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-23 Plug Back Performed
2017-03-23 Well Fluid changed to Gas
2017-03-23 Well Log Performed
2017-03-23 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-15 Perforation 1384.50 1386.50 13
2002-05-17 Perforation 1384.50 1386.50 17
2002-05-23 Packing Device Capped w/Cement 1368.00 1375.00 0
2002-05-24 Perforation 907.00 913.00 17
2002-05-24 Perforation 902.70 903.70 17
2002-06-06 Fracture 902.70 913.00 0
2017-03-23 Packing Device Capped w/Cement 887.00 895.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 3044 0.0 0.0 0.0
2003 4110 0.0 0.0 0.0
2004 225 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References