X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665212102000

Well Details

Well ID: 0665212102000
Loading map...
Location: 00/02-21-066-21W5/0
Location Alias: 00/02-21-66-21 W5M
Location Alias 2: 00/02-21-066-21 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 21
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: KRANG GIROUXLK 2-21-66-21
Operator Name: Harvest Operations Corp.
License Number: 0193327
License Date: 1996-11-08
License Status: Suspension
Spud Date: 1996-11-25
Final Drill Date: 1996-12-02
Well Total Depth: 1375.00 m
Surface Hole Latitude: 54.723224
Surface Hole Longitude: -117.108105

For data sources see[1][2]

Well History

Date Event
1996-11-08 Obtained License
1996-11-26 Surface Casing Operation Performed
1996-12-02 Finished Drilling
1996-12-02 Well Log Performed
1996-12-02 Well Mode changed to Drilled and Cased
1996-12-03 Drill Stem Test Performed
1996-12-04 Production Casing Operation Performed
1996-12-05 Rig Released
1996-12-12 Well Log Performed
1996-12-13 Perforation Treatment Performed - Jet Perforation
1996-12-13 Well Log Performed
1996-12-18 Well Log Performed
1996-12-19 Perforation Treatment Performed - Jet Perforation
1996-12-25 Well Began Production
1996-12-25 Well Fluid changed to Crude Oil
1996-12-25 Well Mode changed to Flowing
1997-01-23 Well Log Performed
1997-01-25 Perforation Treatment Performed - Cement Squeeze
1997-01-25 Plug Back Performed
1997-01-29 Perforation Treatment Performed - Jet Perforation
1997-01-29 Well Log Performed
1999-04-27 Well Log Performed
1999-04-28 Perforation Treatment Performed - Selective Jet Perforations
1999-04-30 Perforation Treatment Performed - Selective Jet Perforations
2000-10-24 Well Fluid changed to Crude Oil
2000-10-24 Well Mode changed to Pumping
2003-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-12-07 Perforation Treatment Performed - Jet Perforation
2003-12-07 Well Log Performed
2012-04-01 Well Fluid changed to Crude Oil
2012-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-13 Perforation 1342.00 1343.20 18
2003-12-07 Perforation 1335.20 1337.10 17
2003-12-07 Perforation 1335.20 1337.00 17
1996-12-19 Perforation 1337.30 1339.70 18
1997-01-25 Cement Squeeze 1342.00 1343.20 0
1997-01-29 Perforation 1337.30 1339.20 18
1999-04-28 Selective Jet Perforations 1338.80 1338.80 1
1999-04-30 Selective Jet Perforations 1338.00 1338.00 1
1999-04-30 Selective Jet Perforations 1338.30 1338.30 1
1999-04-30 Selective Jet Perforations 1338.50 1338.50 1
2003-12-05 Acid Treatment 1337.30 1339.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 155 0.0 0.0 0.0
1997 1874 0.0 0.0 0.0
1998 7245 0.0 0.0 0.0
1999 8225 0.0 0.0 0.0
2000 8740 0.0 0.0 0.0
2001 8174 0.0 0.0 0.0
2002 8611 0.0 0.0 0.0
2003 7075 0.0 0.0 0.0
2004 8689 0.0 0.0 0.0
2005 8297 0.0 0.0 0.0
2006 8352 0.0 0.0 0.0
2007 24 0.0 0.0 0.0
2008 1442 0.0 0.0 0.0
2009 7671 0.0 0.0 0.0
2010 5538 0.0 0.0 0.0

For data sources see[5]

References