If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0665250106000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.69143,"lon":-117.641068,"icon":""}]} |
| Location: 00/06-01-066-25W5/0 | |
| Location Alias: 00/06-01-66-25 W5M | |
| Location Alias 2: 00/06-01-066-25 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 5 | |
| Range: 25 | |
| Section: 01 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ARC HZ ANTE 6-1-66-25 | |
| Operator Name: ARC Resources Ltd. | |
| License Number: 0422773 | |
| License Date: 2010-08-18 | |
| License Status: Issued | |
| Spud Date: 2010-12-01 | |
| Final Drill Date: 2010-12-11 | |
| Well Total Depth: 3201.00 m | |
| Surface Hole Latitude: 54.691430 | |
| Surface Hole Longitude: -117.641068 |
| Date | Event |
|---|---|
| 2010-08-18 | Obtained License |
| 2010-12-01 | Well Log Performed |
| 2010-12-02 | Surface Casing Operation Performed |
| 2010-12-05 | Direction Drilling Operation Performed - Horizontal |
| 2010-12-05 | Well Log Performed |
| 2010-12-07 | Well Log Performed |
| 2010-12-08 | Intermediate Casing Operation Performed |
| 2010-12-09 | Well Log Performed |
| 2010-12-11 | Finished Drilling |
| 2010-12-11 | Well Mode changed to Drilled and Cased |
| 2010-12-12 | Liner Casing Operation Performed |
| 2010-12-13 | Rig Released |
| 2011-01-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-01-22 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-02-07 | Well Began Production |
| 2011-02-07 | Well Fluid changed to Crude Oil |
| 2011-02-07 | Well Mode changed to Pumping |
| 2011-08-29 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-12-05 | 1710.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-22 | Open Hole/Barefoot Completion | 2234.00 | 3201.00 | 0 |
| 2011-01-22 | Multi-Stage Fracture | 2234.00 | 2344.00 | 0 |
| 2011-01-22 | Multi-Stage Fracture | 2345.00 | 2466.00 | 0 |
| 2011-01-22 | Multi-Stage Fracture | 2467.00 | 2589.00 | 0 |
| 2011-01-22 | Multi-Stage Fracture | 2590.00 | 2711.00 | 0 |
| 2011-01-22 | Multi-Stage Fracture | 2712.00 | 2834.00 | 0 |
| 2011-01-22 | Multi-Stage Fracture | 2835.00 | 2956.00 | 0 |
| 2011-01-22 | Multi-Stage Fracture | 2954.00 | 3078.00 | 0 |
| 2011-01-22 | Multi-Stage Fracture | 3079.00 | 3201.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7103 | 0.0 | 0.0 | 0.0 |
| 2012 | 7734 | 0.0 | 0.0 | 0.0 |
| 2013 | 8618 | 0.0 | 0.0 | 0.0 |
| 2014 | 6615 | 0.0 | 0.0 | 0.0 |
| 2015 | 6288 | 0.0 | 0.0 | 0.0 |
| 2016 | 6952 | 0.0 | 0.0 | 0.0 |
| 2017 | 7205 | 0.0 | 0.0 | 0.0 |
| 2018 | 4314 | 0.0 | 0.0 | 0.0 |
| 2019 | 5892 | 0.0 | 0.0 | 0.0 |
| 2020 | 576 | 0.0 | 0.0 | 0.0 |
For data sources see[6]