If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0666050608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.692849,"lon":-118.754266,"icon":""}]} |
| Location: 00/08-06-066-05W6/0 | |
| Location Alias: 00/08-06-66-05 W6M | |
| Location Alias 2: 00/08-06-066-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 06 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: NUVISTA KARR 8-6-66-5 | |
| Operator Name: NuVista Energy Ltd. | |
| License Number: 0459489 | |
| License Date: 2013-09-19 | |
| License Status: Issued | |
| Spud Date: 2013-12-10 | |
| Final Drill Date: 2014-01-07 | |
| Well Total Depth: 4722.00 m | |
| Surface Hole Latitude: 54.692849 | |
| Surface Hole Longitude: -118.754266 |
| Date | Event |
|---|---|
| 2013-09-19 | Obtained License |
| 2013-12-12 | Surface Casing Operation Performed |
| 2013-12-20 | Direction Drilling Operation Performed - Deviate |
| 2013-12-25 | Direction Drilling Operation Performed - Horizontal |
| 2013-12-27 | Intermediate Casing Operation Performed |
| 2014-01-07 | Finished Drilling |
| 2014-01-07 | Well Mode changed to Drilled and Cased |
| 2014-01-08 | Well Log Performed |
| 2014-01-09 | Liner Casing Operation Performed |
| 2014-01-11 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-01-11 | Rig Released |
| 2014-02-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-02-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-02-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-03-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-04-22 | Well Fluid changed to Gas |
| 2014-04-22 | Well Mode changed to Testing |
| 2014-05-02 | Well Began Production |
| 2014-05-02 | Well Fluid changed to Gas |
| 2014-05-02 | Well Mode changed to Flowing |
| 2014-11-25 | Perforation Treatment Performed - Jet Perforation |
| 2014-11-26 | Perforation Treatment Performed - Jet Perforation |
| 2016-11-01 | Well Fluid changed to Gas |
| 2016-11-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-12-10 | Trinidad Drilling Ltd. | 76 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-12-20 | 2738.60 | Deviate (5 - 79 degrees) |
| 2013-12-25 | 3050.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-01-11 | Open Hole/Barefoot Completion | 4717.00 | 4722.00 | 0 |
| 2014-03-01 | Multi-Stage Fracture | 3897.60 | 3897.70 | 0 |
| 2014-03-01 | Multi-Stage Fracture | 3798.50 | 3798.60 | 0 |
| 2014-03-01 | Multi-Stage Fracture | 3699.30 | 3699.40 | 0 |
| 2014-03-01 | Multi-Stage Fracture | 3600.10 | 3600.20 | 0 |
| 2014-03-01 | Multi-Stage Fracture | 3500.80 | 3500.90 | 0 |
| 2014-03-01 | Multi-Stage Fracture | 3401.60 | 3401.70 | 0 |
| 2014-03-01 | Multi-Stage Fracture | 3289.70 | 3289.80 | 0 |
| 2014-03-01 | Multi-Stage Fracture | 3217.90 | 3218.00 | 0 |
| 2014-11-25 | Perforation | 4606.10 | 4607.10 | 14 |
| 2014-11-25 | Perforation | 4504.90 | 4505.90 | 14 |
| 2014-02-01 | Multi-Stage Fracture | 4695.50 | 4695.60 | 0 |
| 2014-11-25 | Perforation | 4403.70 | 4404.70 | 14 |
| 2014-11-25 | Perforation | 4301.80 | 4302.80 | 14 |
| 2014-11-25 | Perforation | 4200.70 | 4201.70 | 14 |
| 2014-11-26 | Perforation | 4101.00 | 4102.00 | 14 |
| 2014-11-26 | Perforation | 3989.00 | 3990.00 | 14 |
| 2014-11-26 | Perforation | 3890.00 | 3891.00 | 14 |
| 2014-11-26 | Perforation | 3791.00 | 3792.00 | 14 |
| 2014-11-26 | Perforation | 3692.00 | 3693.00 | 14 |
| 2014-11-26 | Perforation | 3592.50 | 3593.50 | 14 |
| 2014-11-26 | Perforation | 3493.50 | 3494.50 | 14 |
| 2014-02-02 | Multi-Stage Fracture | 4603.50 | 4603.60 | 0 |
| 2014-11-26 | Perforation | 3394.00 | 3395.00 | 14 |
| 2014-11-26 | Perforation | 3282.50 | 3283.50 | 14 |
| 2014-11-26 | Perforation | 3223.50 | 3224.50 | 14 |
| 2014-02-02 | Multi-Stage Fracture | 4504.30 | 4504.40 | 0 |
| 2014-02-02 | Multi-Stage Fracture | 4405.20 | 4405.30 | 0 |
| 2014-02-02 | Multi-Stage Fracture | 4305.90 | 4306.00 | 0 |
| 2014-02-03 | Multi-Stage Fracture | 4206.80 | 4206.90 | 0 |
| 2014-02-03 | Multi-Stage Fracture | 4108.30 | 4108.40 | 0 |
| 2014-03-01 | Multi-Stage Fracture | 3996.70 | 3996.80 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-02-01 | 2014-03-01 | 2,981 | 12,118 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 89.3339 | N/A | |||
| PR-6000 (30/50) | Canyon | No specific ingredients | Not Available | 100 | 0.83 | N/A | ||
| Sand (30/50) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.2193 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 4.2193 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 4.2193 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 4.2194 | N/A | ||||
| Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 6.1069 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 6.1069 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 6.1069 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 6.1069 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0187 | N/A | |
| Water | 7732-18-5 | 100 | 0.0187 | N/A | ||||
| CAN-1912 Clay Stabilizer (HT) | Canyon | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0504 | N/A | |
| CAN-2057 Friction Reducer | Canyon | Friction Reducer | No hazardous ingredients | Not Available | 100 | 0.0538 | N/A | |
| CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0839 | N/A | |
| Water | 7732-18-5 | 100 | 0.0839 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-01-15 | 2014-01-23 | Surface Water - River | 12236 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 3658 | 0.0 | 0.0 | 0.0 |
| 2015 | 7008 | 0.0 | 0.0 | 0.0 |
| 2016 | 5254 | 0.0 | 0.0 | 0.0 |
| 2017 | 7632 | 0.0 | 0.0 | 0.0 |
| 2018 | 7798 | 0.0 | 0.0 | 0.0 |
| 2019 | 8280 | 0.0 | 0.0 | 0.0 |
| 2020 | 2174 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-01-11 | No Incident Encountered | 0.00 | 0.00 |
| 2014-03-07 | No Incident Encountered | 0.00 | 0.00 |
| 2014-11-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]