If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0666050713000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.689371,"lon":-118.734827,"icon":""}]} |
Location: 00/13-07-066-05W6/0 | |
Location Alias: 00/13-07-66-05 W6M | |
Location Alias 2: 00/13-07-066-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 6 | |
Range: 05 | |
Section: 07 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ KARR 13-7-66-5 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0459016 | |
License Date: 2013-09-03 | |
License Status: Issued | |
Spud Date: 2013-09-11 | |
Final Drill Date: 2013-10-17 | |
Well Total Depth: 4959.00 m | |
Surface Hole Latitude: 54.689371 | |
Surface Hole Longitude: -118.734827 |
Date | Event |
---|---|
2013-09-03 | Obtained License |
2013-09-13 | Surface Casing Operation Performed |
2013-09-22 | Direction Drilling Operation Performed - Deviate |
2013-09-26 | Direction Drilling Operation Performed - Horizontal |
2013-09-30 | Intermediate Casing Operation Performed |
2013-10-02 | Well Log Performed |
2013-10-17 | Finished Drilling |
2013-10-17 | Well Log Performed |
2013-10-17 | Well Mode changed to Drilled and Cased |
2013-10-19 | Well Log Performed |
2013-10-20 | Liner Casing Operation Performed |
2013-10-22 | Rig Released |
2013-10-23 | Perforation Treatment Performed - Open-Hole Completion |
2013-10-26 | Well Log Performed |
2013-11-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-06 | Well Fluid changed to Gas |
2013-11-06 | Well Mode changed to Testing |
2013-11-11 | Well Began Production |
2013-11-11 | Well Fluid changed to Gas |
2013-11-11 | Well Mode changed to Flowing |
2014-02-28 | Perforation Treatment Performed - Jet Perforation |
2014-03-01 | Perforation Treatment Performed - Jet Perforation |
2016-11-01 | Well Fluid changed to Gas |
2016-11-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-09-11 | Nabors Drilling Limited | 80 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-09-22 | 2742.80 | Deviate (5 - 79 degrees) |
2013-09-26 | 3115.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-10-23 | Open Hole/Barefoot Completion | 4954.00 | 4959.00 | 0 |
2013-11-04 | Multi-Stage Fracture | 4137.20 | 4137.30 | 0 |
2013-11-04 | Multi-Stage Fracture | 4033.60 | 4033.70 | 0 |
2013-11-04 | Multi-Stage Fracture | 3929.80 | 3929.90 | 0 |
2013-11-04 | Multi-Stage Fracture | 3826.10 | 3826.20 | 0 |
2013-11-04 | Multi-Stage Fracture | 3736.00 | 3736.10 | 0 |
2013-11-04 | Multi-Stage Fracture | 3632.30 | 3632.40 | 0 |
2013-11-05 | Multi-Stage Fracture | 3528.60 | 3528.70 | 0 |
2013-11-05 | Multi-Stage Fracture | 3424.90 | 3425.00 | 0 |
2013-11-05 | Multi-Stage Fracture | 3321.10 | 3321.20 | 0 |
2013-11-05 | Multi-Stage Fracture | 3244.40 | 3244.50 | 0 |
2013-11-03 | Multi-Stage Fracture | 4931.20 | 4931.30 | 0 |
2014-02-28 | Perforation | 4841.00 | 4842.00 | 13 |
2014-02-28 | Perforation | 4738.00 | 4739.00 | 13 |
2014-02-28 | Perforation | 4634.00 | 4635.00 | 13 |
2014-02-28 | Perforation | 4530.00 | 4531.00 | 13 |
2014-03-01 | Perforation | 3818.00 | 3819.00 | 13 |
2014-03-01 | Perforation | 3728.00 | 3729.00 | 13 |
2014-03-01 | Perforation | 3520.00 | 3521.00 | 13 |
2014-03-01 | Perforation | 3236.00 | 3237.00 | 13 |
2013-11-03 | Multi-Stage Fracture | 4849.60 | 4849.70 | 0 |
2013-11-03 | Multi-Stage Fracture | 4746.00 | 4746.10 | 0 |
2013-11-03 | Multi-Stage Fracture | 4642.20 | 4642.30 | 0 |
2013-11-03 | Multi-Stage Fracture | 4538.50 | 4538.60 | 0 |
2013-11-03 | Multi-Stage Fracture | 4434.90 | 4435.00 | 0 |
2013-11-03 | Multi-Stage Fracture | 4331.20 | 4331.30 | 0 |
2013-11-04 | Multi-Stage Fracture | 4240.90 | 4241.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-11-03 | 2013-11-05 | 2,984 | 13,224 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 87.7226 | N/A | |||
PR-6000 (30/50) | Canyon | No specific ingredients | Not Available | 100 | 0.8409 | N/A | ||
Sand (30/50) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.5652 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.5652 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.5652 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.5652 | N/A | ||||
Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 6.6076 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 6.6076 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 6.6076 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 6.6078 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0198 | N/A | |
Water | 7732-18-5 | 100 | 0.0198 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.1024 | N/A | |
Water | 7732-18-5 | 100 | 0.1024 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Friction Reducer | No hazardous ingredients | Not Available | 100 | 0.0522 | N/A | |
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0888 | N/A | |
Water | 7732-18-5 | 100 | 0.0888 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-11-02 | 2013-11-03 | Surface Water - Runoff | 2784 |
2013-11-01 | 2013-11-05 | Surface Water - Runoff | 10440 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 1162 | 0.0 | 0.0 | 0.0 |
2014 | 3772 | 0.0 | 0.0 | 0.0 |
2015 | 6669 | 0.0 | 0.0 | 0.0 |
2016 | 6807 | 0.0 | 0.0 | 0.0 |
2017 | 4438 | 0.0 | 0.0 | 0.0 |
2018 | 4111 | 0.0 | 0.0 | 0.0 |
2019 | 8630 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-10-23 | No Incident Encountered | 0.00 | 0.00 |
2013-11-25 | No Incident Encountered | 0.00 | 0.00 |
2014-03-13 | No Incident Encountered | 0.00 | 0.00 |
2018-06-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]