X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666050716000

Well Details

Well ID: 0666050716000
Loading map...
Location: 00/16-07-066-05W6/0
Location Alias: 00/16-07-66-05 W6M
Location Alias 2: 00/16-07-066-05 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 05
Section: 07
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ KARR 16-7-66-5
Operator Name: NuVista Energy Ltd.
License Number: 0478483
License Date: 2015-12-15
License Status: Issued
Spud Date: 2016-01-16
Final Drill Date: 2016-02-04
Well Total Depth: 4798.00 m
Surface Hole Latitude: 54.687718
Surface Hole Longitude: -118.725218

For data sources see[1][2]

Well History

Date Event
2015-12-15 Obtained License
2016-01-18 Surface Casing Operation Performed
2016-01-23 Direction Drilling Operation Performed - Deviate
2016-01-26 Direction Drilling Operation Performed - Horizontal
2016-01-27 Intermediate Casing Operation Performed
2016-02-04 Finished Drilling
2016-02-04 Well Log Performed
2016-02-04 Well Mode changed to Drilled and Cased
2016-02-06 Liner Casing Operation Performed
2016-02-07 Perforation Treatment Performed - Open-Hole Completion
2016-02-07 Rig Released
2016-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-28 Well Began Production
2016-03-28 Well Fluid changed to Gas
2016-03-28 Well Mode changed to Flowing
2017-06-01 Well Fluid changed to Gas
2017-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-16 Nabors Drilling Limited 39 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-23 2736.60 Deviate (5 - 79 degrees)
2016-01-26 3084.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-02-07 Open Hole/Barefoot Completion 4793.00 4798.00 0
2016-03-24 Multi-Stage Fracture 4287.00 4287.10 0
2016-03-24 Multi-Stage Fracture 4225.80 4225.90 0
2016-03-24 Multi-Stage Fracture 4165.20 4165.30 0
2016-03-24 Multi-Stage Fracture 4103.90 4104.00 0
2016-03-24 Multi-Stage Fracture 4042.40 4042.50 0
2016-03-24 Multi-Stage Fracture 3981.00 3981.10 0
2016-03-25 Multi-Stage Fracture 3920.30 3920.40 0
2016-03-25 Multi-Stage Fracture 3859.40 3859.50 0
2016-03-25 Multi-Stage Fracture 3798.00 3798.10 0
2016-03-25 Multi-Stage Fracture 3737.80 3737.90 0
2016-03-23 Multi-Stage Fracture 4774.30 4774.40 0
2016-03-25 Multi-Stage Fracture 3676.30 3676.40 0
2016-03-25 Multi-Stage Fracture 3616.30 3616.40 0
2016-03-25 Multi-Stage Fracture 3555.90 3556.00 0
2016-03-25 Multi-Stage Fracture 3494.20 3494.30 0
2016-03-25 Multi-Stage Fracture 3434.40 3434.50 0
2016-03-25 Multi-Stage Fracture 3373.30 3373.40 0
2016-03-25 Multi-Stage Fracture 3326.40 3326.50 0
2016-03-23 Multi-Stage Fracture 4712.10 4712.20 0
2016-03-23 Multi-Stage Fracture 4651.10 4651.20 0
2016-03-23 Multi-Stage Fracture 4590.10 4590.20 0
2016-03-23 Multi-Stage Fracture 4529.90 4530.00 0
2016-03-24 Multi-Stage Fracture 4469.10 4469.20 0
2016-03-24 Multi-Stage Fracture 4407.40 4407.50 0
2016-03-24 Multi-Stage Fracture 4347.80 4347.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-23 2016-03-25 2,993 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Not Available 100 88.8509 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 5.6201 N/A
MC B-8510 Halliburton Bactericide/Biocide 2.2-Dibromo-3-dinitrilopropionamide 10222-01-2 100 0.0075 N/A
Dibromacetonitrile 3252-43-5 100 0.0074 N/A
Dibromacetonitrile Not Available 100 0.0078 N/A
Inert ingredient(s) Not Available 100 0.01 N/A
Proprietary ingredient(s) Trade Secret 100 0.0075 N/A
Sodium bromide 7647-15-6 100 0.0075 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0485 N/A
Ethoxylated alcohols 9068 100 0.0485 N/A
Fatty nitrogen derived amides 9068 100 0.0485 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0485 N/A
Inert ingredient(s) Not Available 100 0.0485 N/A
Proprietary ingredient(s) Trade Secret 100 0.0488 N/A
OilPerm A Halliburton Surfactant 1.2.4 Trimethylbenzene 95-63-6 100 0.0796 N/A
Ethanol 64-17-5 100 0.0797 N/A
Heavy aromatic petroleum 64742-94-5 100 0.0797 N/A
Naphthalene 91-20-3 100 0.0797 N/A
Poly(oxy-1.2-ethanediyl). 127087-87-0 100 0.0797 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-03-25 2015-03-25 Surface Water - Runoff 6109
2015-03-22 2015-03-25 Surface Water - River 12480

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 4643 0.0 0.0 0.0
2017 5619 0.0 0.0 0.0
2018 8368 0.0 0.0 0.0
2019 8716 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-02-07 No Incident Encountered 0.00 0.00
2016-03-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References