If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0666050814000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.689807,"lon":-118.70787,"icon":""}]} |
Location: 00/14-08-066-05W6/0 | |
Location Alias: 00/14-08-66-05 W6M | |
Location Alias 2: 00/14-08-066-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 6 | |
Range: 05 | |
Section: 08 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ KARR 14-8-66-5 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0480915 | |
License Date: 2016-10-24 | |
License Status: Issued | |
Spud Date: 2016-12-14 | |
Final Drill Date: 2017-03-17 | |
Well Total Depth: 4684.00 m | |
Surface Hole Latitude: 54.689807 | |
Surface Hole Longitude: -118.707870 |
Date | Event |
---|---|
2016-10-24 | Obtained License |
2016-12-14 | Lost Circulation Occurred |
2016-12-17 | Surface Casing Operation Performed |
2017-01-01 | Direction Drilling Operation Performed - Deviate |
2017-01-07 | Direction Drilling Operation Performed - Horizontal |
2017-01-08 | Well Log Performed |
2017-01-10 | Intermediate Casing Operation Performed |
2017-03-17 | Finished Drilling |
2017-03-17 | Well Log Performed |
2017-03-17 | Well Mode changed to Drilled and Cased |
2017-03-18 | Well Log Performed |
2017-03-20 | Liner Casing Operation Performed |
2017-03-21 | Perforation Treatment Performed - Open-Hole Completion |
2017-03-21 | Rig Released |
2017-07-23 | Perforation Treatment Performed - Jet Perforation |
2017-07-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-24 | Perforation Treatment Performed - Jet Perforation |
2017-07-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-25 | Perforation Treatment Performed - Jet Perforation |
2017-07-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-26 | Perforation Treatment Performed - Jet Perforation |
2017-07-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-27 | Perforation Treatment Performed - Jet Perforation |
2017-07-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-28 | Perforation Treatment Performed - Jet Perforation |
2017-07-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-29 | Perforation Treatment Performed - Jet Perforation |
2017-07-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-30 | Perforation Treatment Performed - Jet Perforation |
2017-07-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-31 | Perforation Treatment Performed - Jet Perforation |
2017-07-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-28 | Well Began Production |
2017-08-28 | Well Fluid changed to Gas |
2017-08-28 | Well Mode changed to Flowing |
2018-07-01 | Well Fluid changed to Gas |
2018-07-01 | Well Mode changed to Pumping |
2020-02-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-12-14 | Nabors Drilling Limited | 97 | N/A | Set Surface |
2016-12-31 | Nabors Drilling Canada Limited | 97 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-01 | 929.70 | Deviate (5 - 79 degrees) |
2017-01-07 | 3118.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-03-21 | Open Hole/Barefoot Completion | 4676.00 | 4684.00 | 0 |
2017-07-24 | Multi-Stage Fracture | 4457.00 | 4457.50 | 0 |
2017-07-24 | Perforation | 4410.00 | 4410.50 | 12 |
2017-07-24 | Multi-Stage Fracture | 4410.00 | 4410.50 | 0 |
2017-07-25 | Perforation | 4363.00 | 4363.50 | 12 |
2017-07-25 | Multi-Stage Fracture | 4363.00 | 4363.50 | 0 |
2017-07-25 | Perforation | 4316.00 | 4316.50 | 12 |
2017-07-25 | Multi-Stage Fracture | 4316.00 | 4316.50 | 0 |
2017-07-25 | Perforation | 4269.00 | 4269.50 | 12 |
2017-07-25 | Multi-Stage Fracture | 4269.00 | 4269.50 | 0 |
2017-07-25 | Perforation | 4222.00 | 4222.50 | 12 |
2017-07-23 | Multi-Stage Fracture | 4670.20 | 4670.30 | 0 |
2017-07-26 | Multi-Stage Fracture | 4222.00 | 4222.50 | 0 |
2017-07-26 | Perforation | 4175.00 | 4175.50 | 12 |
2017-07-26 | Multi-Stage Fracture | 4175.00 | 4175.50 | 0 |
2017-07-26 | Perforation | 4129.00 | 4129.50 | 12 |
2017-07-26 | Multi-Stage Fracture | 4129.00 | 4129.50 | 0 |
2017-07-26 | Perforation | 4082.00 | 4082.50 | 12 |
2017-07-26 | Multi-Stage Fracture | 4082.00 | 4082.50 | 0 |
2017-07-26 | Perforation | 4035.00 | 4035.50 | 12 |
2017-07-27 | Multi-Stage Fracture | 4035.00 | 4035.50 | 0 |
2017-07-27 | Perforation | 3987.00 | 3987.50 | 12 |
2017-07-23 | Perforation | 4599.00 | 4599.50 | 12 |
2017-07-27 | Multi-Stage Fracture | 3987.00 | 3987.50 | 0 |
2017-07-27 | Perforation | 3941.00 | 3941.50 | 12 |
2017-07-27 | Multi-Stage Fracture | 3941.00 | 3941.50 | 0 |
2017-07-27 | Perforation | 3893.00 | 3893.50 | 12 |
2017-07-27 | Multi-Stage Fracture | 3893.00 | 3893.50 | 0 |
2017-07-27 | Perforation | 3846.00 | 3846.50 | 12 |
2017-07-28 | Multi-Stage Fracture | 3846.00 | 3846.50 | 0 |
2017-07-28 | Perforation | 3799.00 | 3799.50 | 12 |
2017-07-28 | Multi-Stage Fracture | 3799.00 | 3799.50 | 0 |
2017-07-28 | Perforation | 3752.00 | 3752.50 | 12 |
2017-07-23 | Multi-Stage Fracture | 4599.00 | 4599.50 | 0 |
2017-07-28 | Multi-Stage Fracture | 3752.00 | 3752.50 | 0 |
2017-07-28 | Perforation | 3705.00 | 3705.50 | 12 |
2017-07-28 | Multi-Stage Fracture | 3705.00 | 3705.50 | 0 |
2017-07-28 | Perforation | 3658.00 | 3658.50 | 12 |
2017-07-29 | Multi-Stage Fracture | 3658.00 | 3658.50 | 0 |
2017-07-29 | Perforation | 3611.00 | 3611.50 | 12 |
2017-07-29 | Multi-Stage Fracture | 3611.00 | 3611.50 | 0 |
2017-07-29 | Perforation | 3564.00 | 3564.50 | 12 |
2017-07-30 | Multi-Stage Fracture | 3564.00 | 3564.50 | 0 |
2017-07-30 | Perforation | 3517.00 | 3517.50 | 12 |
2017-07-23 | Perforation | 4552.00 | 4552.50 | 12 |
2017-07-30 | Multi-Stage Fracture | 3517.00 | 3517.50 | 0 |
2017-07-30 | Perforation | 3470.00 | 3470.50 | 12 |
2017-07-30 | Multi-Stage Fracture | 3470.00 | 3470.50 | 0 |
2017-07-30 | Perforation | 3423.00 | 3423.50 | 12 |
2017-07-31 | Multi-Stage Fracture | 3423.00 | 3423.50 | 0 |
2017-07-31 | Perforation | 3375.00 | 3375.50 | 12 |
2017-07-31 | Multi-Stage Fracture | 3375.00 | 3375.50 | 0 |
2017-07-31 | Perforation | 3328.00 | 3328.50 | 12 |
2017-07-31 | Multi-Stage Fracture | 3328.00 | 3328.50 | 0 |
2017-07-31 | Perforation | 3281.00 | 3281.50 | 12 |
2017-07-23 | Multi-Stage Fracture | 4552.00 | 4552.50 | 0 |
2017-07-31 | Multi-Stage Fracture | 3281.00 | 3281.50 | 0 |
2017-07-31 | Perforation | 3234.00 | 3234.50 | 12 |
2017-08-01 | Multi-Stage Fracture | 3234.00 | 3234.50 | 0 |
2020-02-29 | Acid Treatment | 3234.00 | 4670.30 | 0 |
2017-07-24 | Perforation | 4504.00 | 4504.50 | 12 |
2017-07-24 | Multi-Stage Fracture | 4504.00 | 4504.50 | 0 |
2017-07-24 | Perforation | 4457.00 | 4457.50 | 12 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-07-23 | 2017-08-01 | 2,960 | 25,582 | N/A |
2 | 2017-07-23 | 2017-07-27 | 2,960 | 0 | N/A |
3 | 2017-07-23 | 2017-07-31 | 2,960 | 0 | N/A |
4 | 2017-07-23 | 2017-07-25 | 2,960 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 89.5329 | N/A | |||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 8.5561 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 8.5561 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.5561 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.5561 | N/A | ||||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 2.1791 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 2.1791 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 2.1791 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 2.179 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0597 | N/A | |
2 | CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0 | N/A |
Non-hazardous base ingredient(s) | Not Available | 100 | 0 | N/A | ||||
3 | CAN-2200S Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Monoethanolamine | 141-43-5 | 100 | 0.0032 | N/A |
Water | 7732-18-5 | 100 | 0.0032 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.0076 | N/A | |
4 | CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0268 | N/A |
Potassium Chloride | 7447-40-7 | 100 | 0.0269 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0268 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-07-23 | 2017-08-01 | Surface Water - River | 25582 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2187 | 0.0 | 0.0 | 0.0 |
2018 | 6788 | 0.0 | 0.0 | 0.0 |
2019 | 7761 | 0.0 | 0.0 | 0.0 |
2020 | 1969 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-14 | Lost Circulation | 90.00 | 100.00 |
2017-08-01 | No Incident Encountered | 0.00 | 0.00 |
2018-06-05 | No Incident Encountered | 0.00 | 0.00 |
2020-02-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]