If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0666050814020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.689867,"lon":-118.707755,"icon":""}]} |
Location: 02/14-08-066-05W6/0 | |
Location Alias: 02/14-08-66-05 W6M | |
Location Alias 2: 02/14-08-066-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 6 | |
Range: 05 | |
Section: 08 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA 102 HZ KARR 14-8-66-5 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0480916 | |
License Date: 2016-10-24 | |
License Status: Issued | |
Spud Date: 2016-12-17 | |
Final Drill Date: 2017-03-29 | |
Well Total Depth: 4569.00 m | |
Surface Hole Latitude: 54.689867 | |
Surface Hole Longitude: -118.707755 |
Date | Event |
---|---|
2016-10-24 | Obtained License |
2016-12-19 | Surface Casing Operation Performed |
2017-01-12 | Direction Drilling Operation Performed - Deviate |
2017-01-19 | Well Log Performed |
2017-01-21 | Direction Drilling Operation Performed - Horizontal |
2017-01-21 | Intermediate Casing Operation Performed |
2017-03-29 | Finished Drilling |
2017-03-29 | Well Mode changed to Drilled and Cased |
2017-03-30 | Well Log Performed |
2017-04-01 | Liner Casing Operation Performed |
2017-04-01 | Perforation Treatment Performed - Open-Hole Completion |
2017-04-01 | Rig Released |
2017-07-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-28 | Perforation Treatment Performed - Jet Perforation |
2017-08-01 | Perforation Treatment Performed - Jet Perforation |
2017-08-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-02 | Perforation Treatment Performed - Jet Perforation |
2017-08-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-03 | Perforation Treatment Performed - Jet Perforation |
2017-08-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-28 | Well Began Production |
2017-08-28 | Well Fluid changed to Gas |
2017-08-28 | Well Mode changed to Flowing |
2018-07-01 | Well Fluid changed to Gas |
2018-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-01-12 | Nabors Drilling Canada Limited | 97 | N/A | Resumption |
2016-12-17 | Nabors Drilling Canada Limited | 97 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-12 | 1118.70 | Deviate (5 - 79 degrees) |
2017-01-21 | 3031.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-04-01 | Open Hole/Barefoot Completion | 4557.00 | 4569.00 | 0 |
2017-07-26 | Multi-Stage Fracture | 4126.10 | 4126.20 | 0 |
2017-07-26 | Multi-Stage Fracture | 4074.00 | 4074.10 | 0 |
2017-07-26 | Multi-Stage Fracture | 4021.30 | 4021.40 | 0 |
2017-07-26 | Multi-Stage Fracture | 3968.80 | 3968.90 | 0 |
2017-07-26 | Multi-Stage Fracture | 3916.70 | 3916.80 | 0 |
2017-07-26 | Multi-Stage Fracture | 3864.00 | 3864.10 | 0 |
2017-07-27 | Multi-Stage Fracture | 3811.60 | 3811.70 | 0 |
2017-07-27 | Multi-Stage Fracture | 3759.10 | 3759.20 | 0 |
2017-07-27 | Multi-Stage Fracture | 3706.90 | 3707.00 | 0 |
2017-07-27 | Multi-Stage Fracture | 3655.40 | 3655.50 | 0 |
2017-07-23 | Multi-Stage Fracture | 4535.60 | 4539.20 | 0 |
2017-07-27 | Multi-Stage Fracture | 3614.80 | 3614.90 | 0 |
2017-07-27 | Multi-Stage Fracture | 3574.10 | 3574.20 | 0 |
2017-07-28 | Perforation | 3529.00 | 3529.50 | 12 |
2017-08-01 | Multi-Stage Fracture | 3529.00 | 3529.50 | 0 |
2017-08-01 | Perforation | 3477.00 | 3477.50 | 12 |
2017-08-01 | Multi-Stage Fracture | 3477.00 | 3477.50 | 0 |
2017-08-01 | Perforation | 3427.00 | 3427.50 | 12 |
2017-08-01 | Multi-Stage Fracture | 3427.00 | 3427.50 | 0 |
2017-08-01 | Perforation | 3375.00 | 3375.50 | 12 |
2017-08-02 | Multi-Stage Fracture | 3375.00 | 3375.50 | 0 |
2017-07-23 | Multi-Stage Fracture | 4492.50 | 4492.60 | 0 |
2017-08-02 | Perforation | 3323.00 | 3323.50 | 12 |
2017-08-02 | Multi-Stage Fracture | 3323.00 | 3323.50 | 0 |
2017-08-02 | Perforation | 3272.00 | 3272.50 | 12 |
2017-08-02 | Multi-Stage Fracture | 3272.00 | 3272.50 | 0 |
2017-08-02 | Perforation | 3221.00 | 3221.50 | 12 |
2017-08-02 | Multi-Stage Fracture | 3221.00 | 3221.50 | 0 |
2017-08-02 | Perforation | 3170.00 | 3170.50 | 12 |
2017-08-03 | Multi-Stage Fracture | 3170.00 | 3170.50 | 0 |
2017-08-03 | Perforation | 3118.00 | 3118.50 | 12 |
2017-08-03 | Multi-Stage Fracture | 3118.00 | 3118.50 | 0 |
2017-07-25 | Multi-Stage Fracture | 4440.10 | 4440.20 | 0 |
2017-07-25 | Multi-Stage Fracture | 4387.70 | 4387.80 | 0 |
2017-07-25 | Multi-Stage Fracture | 4335.40 | 4335.50 | 0 |
2017-07-25 | Multi-Stage Fracture | 4283.70 | 4283.80 | 0 |
2017-07-25 | Multi-Stage Fracture | 4231.00 | 4231.10 | 0 |
2017-07-26 | Multi-Stage Fracture | 4178.50 | 4178.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-07-23 | 2017-08-03 | 2,891 | 21,426 | N/A |
2 | 2017-07-27 | 2017-08-03 | 2,891 | 0 | N/A |
3 | 2017-07-23 | 2017-07-23 | 2,891 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 89.7114 | N/A | |||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 8.243 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 8.243 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.243 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.2431 | N/A | ||||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 2.3536 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 2.3536 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 2.3536 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 2.3536 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.0077 | N/A | |
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0506 | N/A | |
2 | CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0 | N/A |
Non-hazardous base ingredient(s) | Not Available | 100 | 0 | N/A | ||||
CAN-2200S Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Monoethanolamine | 141-43-5 | 100 | 0.0029 | N/A | |
Water | 7732-18-5 | 100 | 0.0029 | N/A | ||||
3 | CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0338 | N/A |
Potassium Chloride | 7447-40-7 | 100 | 0.0338 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0338 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-07-23 | 2017-08-03 | Surface Water - River | 21426 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2153 | 0.0 | 0.0 | 0.0 |
2018 | 8277 | 0.0 | 0.0 | 0.0 |
2019 | 8566 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-04-01 | No Incident Encountered | 0.00 | 0.00 |
2017-08-03 | No Incident Encountered | 0.00 | 0.00 |
2018-06-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]