If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0666050815020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.690048,"lon":-118.707409,"icon":""}]} |
Location: 02/15-08-066-05W6/0 | |
Location Alias: 02/15-08-66-05 W6M | |
Location Alias 2: 02/15-08-066-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 6 | |
Range: 05 | |
Section: 08 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ KARR 15-8-66-5 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0480918 | |
License Date: 2016-10-24 | |
License Status: Issued | |
Spud Date: 2016-12-25 | |
Final Drill Date: 2017-05-02 | |
Well Total Depth: 4509.00 m | |
Surface Hole Latitude: 54.690048 | |
Surface Hole Longitude: -118.707409 |
Date | Event |
---|---|
2016-10-24 | Obtained License |
2016-12-26 | Surface Casing Operation Performed |
2017-02-17 | Direction Drilling Operation Performed - Deviate |
2017-02-20 | Direction Drilling Operation Performed - Horizontal |
2017-02-21 | Well Log Performed |
2017-02-22 | Intermediate Casing Operation Performed |
2017-02-22 | Well Log Performed |
2017-05-02 | Finished Drilling |
2017-05-02 | Well Log Performed |
2017-05-02 | Well Mode changed to Drilled and Cased |
2017-05-05 | Liner Casing Operation Performed |
2017-05-06 | Perforation Treatment Performed - Open-Hole Completion |
2017-05-06 | Rig Released |
2017-07-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-03 | Perforation Treatment Performed - Jet Perforation |
2017-08-04 | Perforation Treatment Performed - Jet Perforation |
2017-08-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-05 | Perforation Treatment Performed - Jet Perforation |
2017-08-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-18 | Well Began Production |
2017-08-18 | Well Fluid changed to Gas |
2017-08-18 | Well Mode changed to Flowing |
2018-07-01 | Well Fluid changed to Gas |
2018-07-01 | Well Mode changed to Pumping |
2020-04-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-02-11 | Nabors Drilling Canada Limited | 97 | N/A | Resumption |
2016-12-25 | Nabors Drilling Canada Limited | 97 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-02-17 | 2742.30 | Deviate (5 - 79 degrees) |
2017-02-20 | 3041.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-05-06 | Open Hole/Barefoot Completion | 4501.00 | 4509.00 | 0 |
2017-07-31 | Multi-Stage Fracture | 4146.40 | 4146.50 | 0 |
2017-07-31 | Multi-Stage Fracture | 4103.50 | 4103.60 | 0 |
2017-07-31 | Multi-Stage Fracture | 4060.60 | 4060.70 | 0 |
2017-07-31 | Multi-Stage Fracture | 4018.00 | 4018.10 | 0 |
2017-07-31 | Multi-Stage Fracture | 3949.80 | 3949.90 | 0 |
2017-07-31 | Multi-Stage Fracture | 3894.30 | 3894.40 | 0 |
2017-07-31 | Multi-Stage Fracture | 3838.80 | 3838.90 | 0 |
2017-07-31 | Multi-Stage Fracture | 3783.20 | 3783.30 | 0 |
2017-08-01 | Multi-Stage Fracture | 3727.70 | 3727.80 | 0 |
2017-08-01 | Multi-Stage Fracture | 3672.30 | 3672.40 | 0 |
2017-07-24 | Multi-Stage Fracture | 4479.20 | 4482.60 | 0 |
2017-08-01 | Multi-Stage Fracture | 3616.70 | 3616.80 | 0 |
2017-08-01 | Multi-Stage Fracture | 3561.30 | 3561.40 | 0 |
2017-08-03 | Perforation | 3464.00 | 3464.50 | 12 |
2017-08-04 | Multi-Stage Fracture | 3464.00 | 3464.50 | 0 |
2017-08-04 | Perforation | 3382.00 | 3382.50 | 12 |
2017-08-04 | Multi-Stage Fracture | 3382.00 | 3382.50 | 0 |
2017-08-04 | Perforation | 3302.00 | 3302.50 | 12 |
2017-08-04 | Multi-Stage Fracture | 3302.00 | 3302.50 | 0 |
2017-08-04 | Perforation | 3223.00 | 3223.50 | 12 |
2017-08-04 | Multi-Stage Fracture | 3223.00 | 3223.50 | 0 |
2017-07-24 | Multi-Stage Fracture | 4446.60 | 4446.70 | 0 |
2017-08-04 | Perforation | 3168.00 | 3168.50 | 12 |
2017-08-05 | Multi-Stage Fracture | 3168.00 | 3168.50 | 0 |
2017-08-05 | Perforation | 3125.00 | 3125.50 | 12 |
2017-08-05 | Multi-Stage Fracture | 3125.00 | 3125.50 | 0 |
2017-07-30 | Multi-Stage Fracture | 4403.70 | 4403.80 | 0 |
2017-07-30 | Multi-Stage Fracture | 4360.80 | 4360.90 | 0 |
2017-07-30 | Multi-Stage Fracture | 4318.10 | 4318.20 | 0 |
2017-07-30 | Multi-Stage Fracture | 4262.30 | 4262.40 | 0 |
2017-07-30 | Multi-Stage Fracture | 4232.20 | 4232.30 | 0 |
2017-07-30 | Multi-Stage Fracture | 4189.30 | 4189.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-07-24 | 2017-08-05 | 2,956 | 19,876 | N/A |
2 | 2017-08-04 | 2017-08-04 | 2,956 | 0 | N/A |
3 | 2017-08-01 | 2017-08-05 | 2,956 | 0 | N/A |
4 | 2017-08-01 | 2017-08-04 | 2,956 | 0 | N/A |
5 | 2017-07-24 | 2017-07-24 | 2,956 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.3736 | N/A | |||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 9.2547 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 9.2547 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 9.2547 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 9.2547 | N/A | ||||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 2.3136 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 2.3136 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 2.3136 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 2.3136 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.053 | N/A | |
2 | CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0 | N/A |
Non-hazardous base ingredient(s) | Not Available | 100 | 0 | N/A | ||||
3 | CAN-2200S Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Monoethanolamine | 141-43-5 | 100 | 0.003 | N/A |
Water | 7732-18-5 | 100 | 0.003 | N/A | ||||
4 | CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.0083 | N/A |
5 | CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0314 | N/A |
Potassium Chloride | 7447-40-7 | 100 | 0.0314 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0314 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-07-30 | 2017-08-05 | Surface Water - River | 19880 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1868 | 0.0 | 0.0 | 0.0 |
2018 | 6812 | 0.0 | 0.0 | 0.0 |
2019 | 8308 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-05-06 | No Incident Encountered | 0.00 | 0.00 |
2017-08-06 | No Incident Encountered | 0.00 | 0.00 |
2018-06-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]