X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666060102000

Well Details

Well ID: 0666060102000
Loading map...
Location: 00/02-01-066-06W6/0
Location Alias: 00/02-01-66-06 W6M
Location Alias 2: 00/02-01-066-06 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 06
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA BILBO 2-1-66-6
Operator Name: NuVista Energy Ltd.
License Number: 0435419
License Date: 2011-07-23
License Status: Issued
Spud Date: 2011-09-02
Final Drill Date: 2011-10-30
Well Total Depth: 4570.00 m
Surface Hole Latitude: 54.690978
Surface Hole Longitude: -118.779822

For data sources see[1][2]

Well History

Date Event
2011-06-26 Well Log Performed
2011-07-23 Obtained License
2011-09-05 Surface Casing Operation Performed
2011-09-14 Direction Drilling Operation Performed - Horizontal
2011-09-26 Well Log Performed
2011-09-27 Intermediate Casing Operation Performed
2011-10-30 Finished Drilling
2011-10-30 Well Mode changed to Drilled and Cased
2011-10-31 Well Log Performed
2011-11-03 Liner Casing Operation Performed
2011-11-04 Rig Released
2011-11-16 Well Log Performed
2011-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-07 Well Fluid changed to Gas
2011-12-07 Well Mode changed to Testing
2012-05-08 Well Began Production
2012-05-08 Well Fluid changed to Gas
2012-05-08 Well Mode changed to Flowing
2017-06-01 Well Fluid changed to Gas
2017-06-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-14 2683.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-29 Multi-Stage Fracture 4502.60 4502.70 0
2011-12-01 Multi-Stage Fracture 3595.80 3595.90 0
2011-12-01 Multi-Stage Fracture 3527.30 3527.40 0
2011-12-01 Multi-Stage Fracture 3377.60 3377.70 0
2011-12-01 Multi-Stage Fracture 3293.80 3293.90 0
2011-12-01 Multi-Stage Fracture 3131.10 3131.20 0
2011-11-29 Multi-Stage Fracture 4398.10 4398.20 0
2011-11-29 Multi-Stage Fracture 4300.60 4300.70 0
2011-11-29 Multi-Stage Fracture 4215.90 4216.00 0
2011-11-30 Multi-Stage Fracture 4066.40 4066.50 0
2011-11-30 Multi-Stage Fracture 3955.80 3955.90 0
2011-11-30 Multi-Stage Fracture 3872.50 3872.60 0
2011-11-30 Multi-Stage Fracture 3789.30 3789.40 0
2011-12-01 Multi-Stage Fracture 3666.60 3666.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 576 0.0 0.0 0.0
2012 3627 0.0 0.0 0.0
2013 7802 0.0 0.0 0.0
2014 5737 0.0 0.0 0.0
2015 7252 0.0 0.0 0.0
2016 8312 0.0 0.0 0.0
2017 7965 0.0 0.0 0.0
2018 5999 0.0 0.0 0.0
2019 48 0.0 0.0 0.0

For data sources see[6]

References