X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666060204000

Well Details

Well ID: 0666060204000
Loading map...
Location: 00/04-02-066-06W6/0
Location Alias: 00/04-02-66-06 W6M
Location Alias 2: 00/04-02-066-06 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 06
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ WAPITI 4-2-66-6
Operator Name: NuVista Energy Ltd.
License Number: 0465512
License Date: 2014-03-06
License Status: Issued
Spud Date: 2014-03-12
Final Drill Date: 2014-04-07
Well Total Depth: 5244.00 m
Surface Hole Latitude: 54.663271
Surface Hole Longitude: -118.778810

For data sources see[1][2]

Well History

Date Event
2014-03-06 Obtained License
2014-03-14 Surface Casing Operation Performed
2014-03-22 Direction Drilling Operation Performed - Deviate
2014-03-26 Direction Drilling Operation Performed - Horizontal
2014-03-27 Intermediate Casing Operation Performed
2014-03-28 Well Log Performed
2014-04-07 Finished Drilling
2014-04-07 Well Mode changed to Drilled and Cased
2014-04-09 Liner Casing Operation Performed
2014-04-11 Rig Released
2014-04-12 Perforation Treatment Performed - Open-Hole Completion
2014-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2014-09-05 Well Began Production
2014-09-05 Well Fluid changed to Gas
2014-09-05 Well Mode changed to Flowing
2016-11-01 Well Fluid changed to Gas
2016-11-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-12 Nabors Drilling Limited 80 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-03-22 2862.60 Deviate (5 - 79 degrees)
2014-03-26 3193.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-04-12 Open Hole/Barefoot Completion 5239.00 5244.00 0
2014-06-16 Multi-Stage Fracture 4390.20 4390.30 0
2014-06-16 Multi-Stage Fracture 4288.30 4288.40 0
2014-06-16 Multi-Stage Fracture 4185.30 4185.40 0
2014-06-16 Multi-Stage Fracture 4088.70 4088.80 0
2014-06-17 Multi-Stage Fracture 3994.10 3994.20 0
2014-06-17 Multi-Stage Fracture 3884.70 3884.80 0
2014-06-17 Multi-Stage Fracture 3789.00 3789.10 0
2014-06-17 Multi-Stage Fracture 3694.40 3694.50 0
2014-06-17 Multi-Stage Fracture 3587.50 3587.60 0
2014-06-17 Multi-Stage Fracture 3493.80 3493.90 0
2014-06-16 Multi-Stage Fracture 5192.90 5193.00 0
2014-06-17 Multi-Stage Fracture 3390.00 3390.10 0
2014-06-17 Multi-Stage Fracture 3295.80 3295.90 0
2014-06-16 Multi-Stage Fracture 5091.40 5091.50 0
2014-06-16 Multi-Stage Fracture 4988.40 4988.50 0
2014-06-16 Multi-Stage Fracture 4885.10 4885.20 0
2014-06-16 Multi-Stage Fracture 4789.70 4789.80 0
2014-06-16 Multi-Stage Fracture 4693.40 4693.50 0
2014-06-16 Multi-Stage Fracture 4587.90 4588.00 0
2014-06-16 Multi-Stage Fracture 4493.80 4493.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-16 2014-06-17 3,103 2,452 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 36.9195 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 21.9516 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 6.0204 N/A
PR6000 30/50 Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 2.1108 N/A
FP-13L Baker Hughes Defoamer Tributyl phosphate 126-73-8 100 0.0008 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 32.5139 N/A
FAC-1W Baker Hughes Gelling Agent Isopropanol 67-63-0 100 0.0531 N/A
N.N-Dimethyloctadecylamine 124-28-7 100 0.0531 N/A
N.N-Dimethyloctadecylamine hydrochloride 1613-17-8 100 0.0531 N/A
Trimethyloctadecylammonium chloride 112-03-8 100 0.0531 N/A
FAC-3W Baker Hughes Gelling Agent Isopropanol 67-63-0 100 0.4295 N/A
Sodium xylene sulphonate 1300-72-7 100 0.4295 N/A
Trimethyloctadecylammonium chloride 112-03-8 100 0.4295 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-06-20 2014-06-21 Surface Water - Runoff 2452

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2709 0.0 0.0 0.0
2015 7605 0.0 0.0 0.0
2016 7356 0.0 0.0 0.0
2017 7408 0.0 0.0 0.0
2018 8236 0.0 0.0 0.0
2019 8747 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-04-12 No Incident Encountered 0.00 0.00
2014-06-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References