If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0666060213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.678257,"lon":-118.783603,"icon":""}]} |
| Location: 00/13-02-066-06W6/0 | |
| Location Alias: 00/13-02-66-06 W6M | |
| Location Alias 2: 00/13-02-066-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 066 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 02 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: NUVISTA HZ BILBO 13-2-66-6 | |
| Operator Name: NuVista Energy Ltd. | |
| License Number: 0456974 | |
| License Date: 2013-05-15 | |
| License Status: Issued | |
| Spud Date: 2013-08-08 | |
| Final Drill Date: 2013-09-01 | |
| Well Total Depth: 4608.00 m | |
| Surface Hole Latitude: 54.678257 | |
| Surface Hole Longitude: -118.783603 |
| Date | Event |
|---|---|
| 2013-05-15 | Obtained License |
| 2013-08-10 | Surface Casing Operation Performed |
| 2013-08-16 | Intermediate Casing Operation Performed |
| 2013-08-18 | Direction Drilling Operation Performed - Deviate |
| 2013-08-22 | Direction Drilling Operation Performed - Horizontal |
| 2013-09-01 | Finished Drilling |
| 2013-09-01 | Well Log Performed |
| 2013-09-01 | Well Mode changed to Drilled and Cased |
| 2013-09-02 | Well Log Performed |
| 2013-09-04 | Liner Casing Operation Performed |
| 2013-09-05 | Rig Released |
| 2013-09-07 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-09-09 | Well Fluid changed to Gas |
| 2013-09-09 | Well Mode changed to Testing |
| 2013-09-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-09-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-10-10 | Well Began Production |
| 2013-10-10 | Well Fluid changed to Gas |
| 2013-10-10 | Well Mode changed to Flowing |
| 2017-06-01 | Well Fluid changed to Gas |
| 2017-06-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-08-08 | Trinidad Drilling Ltd. | 76 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-08-18 | 2780.00 | Deviate (5 - 79 degrees) |
| 2013-08-22 | 3110.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-09-07 | Open Hole/Barefoot Completion | 4603.00 | 4608.00 | 0 |
| 2013-09-16 | Multi-Stage Fracture | 3833.20 | 3833.30 | 0 |
| 2013-09-17 | Multi-Stage Fracture | 3743.70 | 3743.80 | 0 |
| 2013-09-17 | Multi-Stage Fracture | 3654.30 | 3654.40 | 0 |
| 2013-09-17 | Multi-Stage Fracture | 3551.50 | 3551.60 | 0 |
| 2013-09-17 | Multi-Stage Fracture | 3462.10 | 3462.20 | 0 |
| 2013-09-17 | Multi-Stage Fracture | 3372.60 | 3372.70 | 0 |
| 2013-09-17 | Multi-Stage Fracture | 3283.20 | 3283.30 | 0 |
| 2013-09-17 | Multi-Stage Fracture | 3220.60 | 3220.70 | 0 |
| 2013-09-16 | Multi-Stage Fracture | 4580.30 | 4580.40 | 0 |
| 2013-09-16 | Multi-Stage Fracture | 4499.30 | 4499.40 | 0 |
| 2013-09-16 | Multi-Stage Fracture | 4396.50 | 4396.60 | 0 |
| 2013-09-16 | Multi-Stage Fracture | 4307.00 | 4307.10 | 0 |
| 2013-09-16 | Multi-Stage Fracture | 4217.70 | 4217.80 | 0 |
| 2013-09-16 | Multi-Stage Fracture | 4114.90 | 4115.00 | 0 |
| 2013-09-16 | Multi-Stage Fracture | 4025.40 | 4025.50 | 0 |
| 2013-09-16 | Multi-Stage Fracture | 3936.00 | 3936.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-09-16 | 2013-09-17 | 3,013 | 12,251 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 88.9541 | N/A | |||
| PR-6000 (30/50) | Canyon | No specific ingredients | Not Available | 100 | 0.808 | N/A | ||
| Sand (30/50) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.3868 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 4.3868 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 4.3868 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 4.3868 | N/A | ||||
| Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 6.3493 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 6.3493 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 6.3493 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 6.3491 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0121 | N/A | |
| Water | 7732-18-5 | 100 | 0.0121 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0455 | N/A | |
| Water | 7732-18-5 | 100 | 0.0455 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon | Friction Reducer | No hazardous ingredients | Not Available | 100 | 0.0449 | N/A | |
| CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0781 | N/A | |
| Water | 7732-18-5 | 100 | 0.0781 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-09-12 | 2013-09-17 | Surface Water - Runoff | 2158 |
| 2013-09-16 | 2013-09-16 | Surface Water - Runoff | 4022 |
| 2013-09-13 | 2013-09-14 | Surface Water - Runoff | 6071 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 1562 | 0.0 | 0.0 | 0.0 |
| 2014 | 6462 | 0.0 | 0.0 | 0.0 |
| 2015 | 6796 | 0.0 | 0.0 | 0.0 |
| 2016 | 8382 | 0.0 | 0.0 | 0.0 |
| 2017 | 7316 | 0.0 | 0.0 | 0.0 |
| 2018 | 4751 | 0.0 | 0.0 | 0.0 |
| 2019 | 2780 | 0.0 | 0.0 | 0.0 |
| 2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-09-07 | No Incident Encountered | 0.00 | 0.00 |
| 2013-09-28 | No Incident Encountered | 0.00 | 0.00 |
| 2019-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]