X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0666060504000

Well Details

Well ID: 0666060504000
Loading map...
Location: 00/04-05-066-06W6/0
Location Alias: 00/04-05-66-06 W6M
Location Alias 2: 00/04-05-066-06 W6/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 6
Range: 06
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ WAPITI 4-5-66-6
Operator Name: NuVista Energy Ltd.
License Number: 0461507
License Date: 2013-11-27
License Status: Issued
Spud Date: 2013-12-12
Final Drill Date: 2014-01-16
Well Total Depth: 5815.00 m
Surface Hole Latitude: 54.662216
Surface Hole Longitude: -118.848172

For data sources see[1][2]

Well History

Date Event
2013-11-27 Obtained License
2013-12-14 Surface Casing Operation Performed
2013-12-25 Direction Drilling Operation Performed - Deviate
2013-12-29 Direction Drilling Operation Performed - Horizontal
2013-12-31 Intermediate Casing Operation Performed
2014-01-16 Finished Drilling
2014-01-16 Well Log Performed
2014-01-16 Well Mode changed to Drilled and Cased
2014-01-18 Liner Casing Operation Performed
2014-01-20 Rig Released
2014-01-21 Perforation Treatment Performed - Open-Hole Completion
2014-02-27 Well Log Performed
2014-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-08 Well Fluid changed to Gas
2014-05-08 Well Mode changed to Testing
2014-06-09 Well Began Production
2014-06-09 Well Fluid changed to Gas
2014-06-09 Well Mode changed to Flowing
2017-06-01 Well Fluid changed to Gas
2017-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-12-12 Nabors Drilling Limited 80 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-12-25 2953.40 Deviate (5 - 79 degrees)
2013-12-29 3296.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-01-21 Open Hole/Barefoot Completion 5810.00 5815.00 0
2014-03-22 Multi-Stage Fracture 4547.90 4548.00 0
2014-03-22 Multi-Stage Fracture 4435.60 4435.70 0
2014-03-23 Multi-Stage Fracture 4323.10 4323.20 0
2014-03-23 Multi-Stage Fracture 4210.70 4210.80 0
2014-03-23 Multi-Stage Fracture 4098.10 4098.20 0
2014-03-23 Multi-Stage Fracture 3998.90 3999.00 0
2014-03-23 Multi-Stage Fracture 3887.00 3887.10 0
2014-03-23 Multi-Stage Fracture 3774.60 3774.70 0
2014-03-23 Multi-Stage Fracture 3662.30 3662.40 0
2014-03-24 Multi-Stage Fracture 3549.80 3549.90 0
2014-03-21 Multi-Stage Fracture 5787.40 5787.50 0
2014-03-24 Multi-Stage Fracture 3437.30 3437.40 0
2014-03-24 Multi-Stage Fracture 3364.90 3365.00 0
2014-03-21 Multi-Stage Fracture 5654.70 5654.80 0
2014-03-21 Multi-Stage Fracture 5475.80 5475.90 0
2014-03-22 Multi-Stage Fracture 5283.60 5283.70 0
2014-03-22 Multi-Stage Fracture 5104.30 5104.40 0
2014-03-22 Multi-Stage Fracture 4911.50 4911.60 0
2014-03-22 Multi-Stage Fracture 4772.70 4772.80 0
2014-03-22 Multi-Stage Fracture 4660.40 4660.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-21 2014-03-24 3,199 16,259 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.746 N/A
PR-6000 (30/50) Canyon No specific ingredients Not Available 100 0.774 N/A
Sand (30/50) Ottawa Canyon Aluminum Oxide 1344-28-1 100 4.2018 N/A
Crystalline silica. quartz 14808-60-7 100 4.2018 N/A
Iron Oxide 1309-37-1 100 4.2018 N/A
Titanium Oxide 13463-67-7 100 4.2018 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 6.0816 N/A
Crystalline silica. quartz 14808-60-7 100 6.0816 N/A
Iron Oxide 1309-37-1 100 6.0816 N/A
Titanium Oxide 13463-67-7 100 6.0816 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0131 N/A
Water 7732-18-5 100 0.0131 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.05 N/A
CAN-2057 Friction Reducer Canyon Friction Reducer No hazardous ingredients Not Available 100 0.049 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.084 N/A
Water 7732-18-5 100 0.084 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-16 2014-03-17 Recycled Fracturing Water (treated at well site) 1370
2014-03-21 2014-03-23 Central Water Distribution Facility 6566
2014-02-15 2014-02-19 Surface Water - River 8323

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3663 0.0 0.0 0.0
2015 7445 0.0 0.0 0.0
2016 8085 0.0 0.0 0.0
2017 5802 0.0 0.0 0.0
2018 3864 0.0 0.0 0.0
2019 8716 0.0 0.0 0.0
2020 2182 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-20 No Incident Encountered 0.00 0.00
2014-03-30 No Incident Encountered 0.00 0.00
2018-06-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References