If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0674133410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.845612,"lon":-111.893715,"icon":""}]} |
Location: 00/10-34-067-13W4/0 | |
Location Alias: 00/10-34-67-13 W4M | |
Location Alias 2: 00/10-34-067-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 4 | |
Range: 13 | |
Section: 34 | |
County/Municipality: Lac La Biche County | |
Well Name: ICG ET AL TWEEDIE 10-34-67-13 | |
Operator Name: Inter-City Manufacturing Ltd | |
License Number: 0059714 | |
License Date: 1976-08-12 | |
License Status: RecCertified | |
Spud Date: 1976-09-03 | |
Final Drill Date: 1976-09-05 | |
Well Total Depth: 470.00 m | |
Surface Hole Latitude: 54.845612 | |
Surface Hole Longitude: -111.893715 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-08-12 | Obtained License |
1976-09-05 | Finished Drilling |
1976-09-05 | Well Log Performed |
1976-09-06 | Production Casing Operation Performed |
1976-09-16 | Perforation Treatment Performed - Open-Hole Completion |
1976-09-17 | Perforation Treatment Performed - Jet Perforation |
1976-09-17 | Well Mode changed to Drilled and Cased |
1977-10-28 | Well Began Production |
1977-10-28 | Well Fluid changed to Gas |
1977-10-28 | Well Mode changed to Flowing |
1978-12-03 | Well Log Performed |
1978-12-09 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
1978-12-14 | Well Log Performed |
1978-12-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-12-16 | Perforation Treatment Performed - Jet Perforation |
1978-12-16 | Well Fluid changed to Gas |
1978-12-16 | Well Mode changed to Abandoned Zone |
1979-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-02-09 | Perforation Treatment Performed - Selective Jet Perforations |
1980-11-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-11-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-09-16 | Open Hole/Barefoot Completion | 463.00 | 470.00 | 0 |
1979-02-09 | Selective Jet Perforations | 252.10 | 252.10 | 1 |
1979-02-09 | Selective Jet Perforations | 252.40 | 252.40 | 1 |
1980-11-24 | Packing Device Capped w/Cement | 241.00 | 251.00 | 0 |
1980-11-24 | Packing Device Capped w/Cement | 178.00 | 186.00 | 0 |
1976-09-17 | Perforation | 294.40 | 295.00 | 7 |
1978-12-09 | Casing Patch | 294.40 | 295.00 | 0 |
1978-12-16 | Packing Device Capped w/Cement | 457.50 | 462.00 | 0 |
1978-12-16 | Perforation | 445.00 | 446.50 | 3 |
1978-12-16 | Perforation | 450.50 | 450.80 | 3 |
1978-12-16 | Perforation | 455.40 | 456.60 | 3 |
1979-02-08 | Packing Device Capped w/Cement | 434.00 | 442.00 | 0 |
1979-02-09 | Selective Jet Perforations | 251.80 | 251.80 | 1 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 264 | 0.0 | 0.0 | 0.0 |
For data sources see[5]