X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674133410000

Well Details

Well ID: 0674133410000
Loading map...
Location: 00/10-34-067-13W4/0
Location Alias: 00/10-34-67-13 W4M
Location Alias 2: 00/10-34-067-13 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 13
Section: 34
County/Municipality: Lac La Biche County
Well Name: ICG ET AL TWEEDIE 10-34-67-13
Operator Name: Inter-City Manufacturing Ltd
License Number: 0059714
License Date: 1976-08-12
License Status: RecCertified
Spud Date: 1976-09-03
Final Drill Date: 1976-09-05
Well Total Depth: 470.00 m
Surface Hole Latitude: 54.845612
Surface Hole Longitude: -111.893715

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-12 Obtained License
1976-09-05 Finished Drilling
1976-09-05 Well Log Performed
1976-09-06 Production Casing Operation Performed
1976-09-16 Perforation Treatment Performed - Open-Hole Completion
1976-09-17 Perforation Treatment Performed - Jet Perforation
1976-09-17 Well Mode changed to Drilled and Cased
1977-10-28 Well Began Production
1977-10-28 Well Fluid changed to Gas
1977-10-28 Well Mode changed to Flowing
1978-12-03 Well Log Performed
1978-12-09 Perforation Treatment Performed - Casing Patch (Over Perfs)
1978-12-14 Well Log Performed
1978-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-12-16 Perforation Treatment Performed - Jet Perforation
1978-12-16 Well Fluid changed to Gas
1978-12-16 Well Mode changed to Abandoned Zone
1979-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-02-09 Perforation Treatment Performed - Selective Jet Perforations
1980-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-16 Open Hole/Barefoot Completion 463.00 470.00 0
1979-02-09 Selective Jet Perforations 252.10 252.10 1
1979-02-09 Selective Jet Perforations 252.40 252.40 1
1980-11-24 Packing Device Capped w/Cement 241.00 251.00 0
1980-11-24 Packing Device Capped w/Cement 178.00 186.00 0
1976-09-17 Perforation 294.40 295.00 7
1978-12-09 Casing Patch 294.40 295.00 0
1978-12-16 Packing Device Capped w/Cement 457.50 462.00 0
1978-12-16 Perforation 445.00 446.50 3
1978-12-16 Perforation 450.50 450.80 3
1978-12-16 Perforation 455.40 456.60 3
1979-02-08 Packing Device Capped w/Cement 434.00 442.00 0
1979-02-09 Selective Jet Perforations 251.80 251.80 1

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 264 0.0 0.0 0.0

For data sources see[5]

References