X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0674263311000

Well Details

Well ID: 0674263311000
Loading map...
Location: 00/11-33-067-26W4/0
Location Alias: 00/11-33-67-26 W4M
Location Alias 2: 00/11-33-067-26 W4/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 4
Range: 26
Section: 33
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CNRL BIG BEND 11-33-67-26
Operator Name: Canadian Natural Resources Limited
License Number: 0138832
License Date: 1989-02-16
License Status: Abandoned
Spud Date: 1989-02-26
Final Drill Date: 1989-03-02
Well Total Depth: 825.00 m
Surface Hole Latitude: 54.845340
Surface Hole Longitude: -113.911985

For data sources see[1][2]

Well History

Date Event
1989-02-16 Obtained License
1989-02-27 Surface Casing Operation Performed
1989-03-02 Finished Drilling
1989-03-02 Well Log Performed
1989-03-03 Drill Stem Test Performed
1989-03-04 Production Casing Operation Performed
1989-03-04 Rig Released
1989-03-11 Perforation Treatment Performed - Jet Perforation
1989-03-11 Well Log Performed
1989-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-13 Perforation Treatment Performed - Fractured
1989-03-16 Perforation Treatment Performed - Jet Perforation
1989-03-16 Well Log Performed
1989-04-01 Well Mode changed to Drilled and Cased
1990-01-01 Well Began Production
1990-01-01 Well Fluid changed to Gas
1990-01-01 Well Mode changed to Flowing
1993-01-01 Well Fluid changed to Gas
1993-01-01 Well Mode changed to Suspended
2000-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-19 Plug Back Performed
2000-12-19 Well Fluid changed to Gas
2000-12-19 Well Mode changed to Abandoned Zone
2000-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-20 Plug Back Performed
2000-12-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-11 Perforation 593.00 594.50 13
1989-03-13 Fracture 593.00 594.50 0
1989-03-13 Acid Treatment 593.00 594.50 0
1989-03-16 Perforation 790.00 792.00 13
2000-12-19 Packing Device Capped w/Cement 777.00 785.00 0
2000-12-20 Packing Device Capped w/Cement 577.00 585.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3791 0.0 0.0 0.0
1991 672 0.0 0.0 0.0

For data sources see[5]

References