If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0675083211000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.836459,"lon":-115.161974,"icon":""}]} |
Location: 00/11-32-067-08W5/0 | |
Location Alias: 00/11-32-67-08 W5M | |
Location Alias 2: 00/11-32-067-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 5 | |
Range: 08 | |
Section: 32 | |
County/Municipality: Big Lakes County | |
Well Name: ASPENLEAF 3-33 HZ SWANH 11-32-67-8 | |
Operator Name: Aspenleaf Energy Limited | |
License Number: 0437489 | |
License Date: 2011-10-06 | |
License Status: Amended | |
Spud Date: 2012-02-01 | |
Final Drill Date: 2012-02-22 | |
Well Total Depth: 4161.00 m | |
Surface Hole Latitude: 54.836459 | |
Surface Hole Longitude: -115.161974 |
Date | Event |
---|---|
2011-10-06 | Obtained License |
2012-02-04 | Surface Casing Operation Performed |
2012-02-09 | Direction Drilling Operation Performed - Horizontal |
2012-02-09 | Well Log Performed |
2012-02-13 | Well Log Performed |
2012-02-14 | Intermediate Casing Operation Performed |
2012-02-22 | Finished Drilling |
2012-02-22 | Well Log Performed |
2012-02-22 | Well Mode changed to Drilled and Cased |
2012-02-24 | Liner Casing Operation Performed |
2012-02-24 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-24 | Well Log Performed |
2012-02-25 | Rig Released |
2012-03-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-21 | Well Began Production |
2012-03-21 | Well Fluid changed to Crude Oil |
2012-03-21 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-02 | Savanna Drilling Corp. | 603 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-09 | 2050.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-24 | Open Hole/Barefoot Completion | 4157.00 | 4161.00 | 0 |
2012-03-20 | Multi-Stage Fracture | 3567.60 | 3568.10 | 0 |
2012-03-20 | Multi-Stage Fracture | 3495.20 | 3495.70 | 0 |
2012-03-20 | Multi-Stage Fracture | 3420.60 | 3421.10 | 0 |
2012-03-20 | Multi-Stage Fracture | 3347.10 | 3347.60 | 0 |
2012-03-20 | Multi-Stage Fracture | 3274.10 | 3274.50 | 0 |
2012-03-20 | Multi-Stage Fracture | 3200.80 | 3201.30 | 0 |
2012-03-20 | Multi-Stage Fracture | 3126.30 | 3126.70 | 0 |
2012-03-20 | Multi-Stage Fracture | 3053.20 | 3053.70 | 0 |
2012-03-20 | Multi-Stage Fracture | 2980.00 | 2980.40 | 0 |
2012-03-20 | Multi-Stage Fracture | 2906.90 | 2907.40 | 0 |
2012-03-20 | Multi-Stage Fracture | 4139.30 | 4139.70 | 0 |
2012-03-20 | Multi-Stage Fracture | 2822.40 | 2822.90 | 0 |
2012-03-20 | Multi-Stage Fracture | 2749.60 | 2750.00 | 0 |
2012-03-20 | Multi-Stage Fracture | 2677.30 | 2677.80 | 0 |
2012-03-20 | Multi-Stage Fracture | 2603.70 | 2604.20 | 0 |
2012-03-20 | Multi-Stage Fracture | 2529.60 | 2530.10 | 0 |
2012-03-20 | Multi-Stage Fracture | 2456.40 | 2456.90 | 0 |
2012-03-20 | Multi-Stage Fracture | 4083.10 | 4083.50 | 0 |
2012-03-20 | Multi-Stage Fracture | 4010.40 | 4010.90 | 0 |
2012-03-20 | Multi-Stage Fracture | 3937.10 | 3937.60 | 0 |
2012-03-20 | Multi-Stage Fracture | 3863.70 | 3864.10 | 0 |
2012-03-20 | Multi-Stage Fracture | 3790.30 | 3790.80 | 0 |
2012-03-20 | Multi-Stage Fracture | 3715.20 | 3715.70 | 0 |
2012-03-20 | Multi-Stage Fracture | 3641.60 | 3642.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5576 | 0.0 | 0.0 | 0.0 |
2013 | 8518 | 0.0 | 0.0 | 0.0 |
2014 | 8179 | 0.0 | 0.0 | 0.0 |
2015 | 7657 | 0.0 | 0.0 | 0.0 |
2016 | 8646 | 0.0 | 0.0 | 0.0 |
2017 | 8634 | 0.0 | 0.0 | 0.0 |
2018 | 8171 | 0.0 | 0.0 | 0.0 |
2019 | 7975 | 0.0 | 0.0 | 0.0 |
2020 | 1854 | 0.0 | 0.0 | 0.0 |
For data sources see[7]