If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0676092706002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/06-27-067-09W6/2 | |
Location Alias: 00/06-27-67-09 W6M | |
Location Alias 2: 00/06-27-067-09 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 6 | |
Range: 09 | |
Section: 27 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: AMOCO ET AL STONY CREEK 6-27-67-9 | |
Operator Name: Plains Midstream Canada ULC | |
License Number: 0075909 | |
License Date: 1979-05-28 | |
License Status: Re-Entered | |
Spud Date: 1979-06-20 | |
Final Drill Date: 1979-09-02 | |
Well Total Depth: 2777.00 m | |
Surface Hole Latitude: 54.826056 | |
Surface Hole Longitude: -119.289764 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-05-28 | Obtained License |
1979-08-06 | Drill Stem Test Performed |
1979-08-18 | Drill Stem Test Performed |
1979-08-19 | Drill Stem Test Performed |
1979-09-02 | Finished Drilling |
1979-09-05 | Liner Casing Operation Performed |
1979-09-29 | Perforation Treatment Performed - Jet Perforation |
1979-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-11-10 | Perforation Treatment Performed - Jet Perforation |
1979-11-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-02-08 | Perforation Treatment Performed - Jet Perforation |
1980-02-10 | Perforation Treatment Performed - Fractured |
1980-02-15 | Perforation Treatment Performed - Jet Perforation |
1980-02-17 | Perforation Treatment Performed - Fractured |
1980-02-18 | Perforation Treatment Performed - Fractured |
1980-06-26 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
1980-06-27 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
1980-07-03 | Perforation Treatment Performed - Jet Perforation |
1980-07-04 | Perforation Treatment Performed - Fractured |
1980-10-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-10-20 | Perforation Treatment Performed - Jet Perforation |
1980-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-11-22 | Perforation Treatment Performed - Jet Perforation |
1980-11-23 | Perforation Treatment Performed - Fractured |
1982-10-12 | Perforation Treatment Performed - Cement Squeeze |
1982-10-14 | Perforation Treatment Performed - Jet Perforation |
1982-10-16 | Perforation Treatment Performed - Cement Squeeze |
1982-10-19 | Perforation Treatment Performed - Jet Perforation |
1982-10-25 | Perforation Treatment Performed - Fractured |
1982-11-25 | Perforation Treatment Performed - Jet Perforation |
1982-11-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-11-28 | Perforation Treatment Performed - Fractured |
1983-06-20 | Well Mode changed to Drilled and Cased |
1984-01-13 | Perforation Treatment Performed - Fractured |
1984-02-01 | Well Began Production |
1984-02-01 | Well Fluid changed to Gas |
1984-02-01 | Well Mode changed to Flowing |
1984-03-01 | Well Fluid changed to Gas |
1984-03-01 | Well Mode changed to Suspended |
1985-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-09-15 | Plug Back Performed |
1985-09-21 | Well Log Performed |
1985-09-25 | Well Log Performed |
1985-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-09-26 | Plug Back Performed |
1985-09-26 | Well Fluid changed to Gas |
1985-09-26 | Well Mode changed to Abandoned Zone |
1985-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-10-04 | Perforation Treatment Performed - Jet Perforation |
1985-10-05 | Perforation Treatment Performed - Fractured |
1985-11-15 | Well Log Performed |
1985-12-11 | Well Log Performed |
1990-12-10 | Well Log Performed |
1990-12-11 | Well Log Performed |
1990-12-12 | Perforation Treatment Performed - Jet Perforation |
1990-12-13 | Perforation Treatment Performed - Cement Squeeze |
1990-12-18 | Perforation Treatment Performed - Jet Perforation |
1991-02-24 | Perforation Treatment Performed - Fractured |
1991-03-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-03-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-03-24 | Well Abandoned |
1996-03-02 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-09-29 | Perforation | 2606.00 | 2635.00 | 13 |
1980-02-15 | Perforation | 1120.00 | 1130.00 | 13 |
1980-02-17 | Fracture | 1109.00 | 1130.00 | 0 |
1980-02-18 | Fracture | 1109.00 | 1130.00 | 0 |
1980-06-26 | Casing Patch | 1118.20 | 1131.90 | 0 |
1980-06-27 | Casing Patch | 1107.40 | 1113.60 | 0 |
1980-07-03 | Perforation | 2470.00 | 2477.00 | 13 |
1980-07-03 | Perforation | 2484.00 | 2499.00 | 13 |
1980-07-04 | Fracture | 2470.00 | 2499.00 | 0 |
1980-10-19 | Packing Device Capped w/Cement | 2460.00 | 2460.00 | 0 |
1980-10-20 | Perforation | 2163.50 | 2169.00 | 13 |
1979-11-08 | Packing Device Capped w/Cement | 2595.00 | 2595.00 | 0 |
1980-10-22 | Acid Treatment | 2163.50 | 2169.00 | 0 |
1980-11-22 | Packing Device Capped w/Cement | 2155.00 | 2155.00 | 0 |
1980-11-22 | Perforation | 2040.00 | 2049.00 | 0 |
1980-11-23 | Fracture | 2040.00 | 2049.00 | 0 |
1982-10-12 | Cement Squeeze | 2040.00 | 2049.00 | 0 |
1982-10-14 | Perforation | 2163.50 | 2169.00 | 13 |
1982-10-16 | Cement Squeeze | 2163.50 | 2169.00 | 0 |
1982-10-19 | Perforation | 2470.00 | 2477.00 | 13 |
1982-10-19 | Perforation | 2484.00 | 2499.00 | 13 |
1982-10-25 | Fracture | 2470.00 | 2499.00 | 0 |
1979-11-10 | Perforation | 2535.00 | 2544.00 | 13 |
1982-11-25 | Perforation | 2173.00 | 2177.00 | 13 |
1982-11-25 | Perforation | 2163.50 | 2169.00 | 13 |
1982-11-26 | Acid Treatment | 2163.50 | 2177.00 | 0 |
1982-11-28 | Fracture | 2163.50 | 2177.00 | 0 |
1984-01-13 | Fracture | 2163.50 | 2177.00 | 0 |
1985-09-15 | Packing Device Capped w/Cement | 2427.00 | 2435.00 | 0 |
1985-09-26 | Packing Device Capped w/Cement | 2149.00 | 2157.00 | 0 |
1985-09-28 | Packing Device Capped w/Cement | 1106.00 | 1200.00 | 0 |
1985-10-04 | Perforation | 2104.00 | 2117.00 | 0 |
1985-10-05 | Fracture | 2104.00 | 2117.00 | 0 |
1979-11-11 | Acid Treatment | 2535.00 | 2544.00 | 0 |
1990-12-12 | Perforation | 2125.50 | 2126.50 | 20 |
1990-12-13 | Cement Squeeze | 2104.00 | 2126.50 | 0 |
1990-12-18 | Perforation | 2104.00 | 2117.00 | 39 |
1991-02-24 | Fracture | 2104.00 | 2117.00 | 0 |
1991-03-23 | Packing Device Capped w/Cement | 2087.00 | 2095.00 | 0 |
1991-03-24 | Packing Device Capped w/Cement | 2022.00 | 2030.00 | 0 |
1991-03-24 | Packing Device Capped w/Cement | 1091.00 | 1099.00 | 0 |
1980-02-08 | Packing Device Capped w/Cement | 2531.00 | 2531.00 | 0 |
1980-02-08 | Perforation | 1109.00 | 1112.00 | 13 |
1980-02-08 | Perforation | 1120.00 | 1130.00 | 0 |
1980-02-10 | Fracture | 1109.00 | 1130.00 | 0 |
1980-02-15 | Perforation | 1109.00 | 1112.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 1426 | 0.0 | 0.0 | 0.0 |
For data sources see[5]