X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685082002002

Well Details

Well ID: 0685082002002
Loading map...
Location: 00/02-20-068-08W5/2
Location Alias: 00/02-20-68-08 W5M
Location Alias 2: 00/02-20-068-08 W5/02
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 08
Section: 20
County/Municipality: Big Lakes County
Well Name: ASPENLEAF 16-17 DR SWANH 2-20-68-8
Operator Name: Aspenleaf Energy Limited
License Number: 0359780
License Date: 2006-07-05
License Status: Amended
Spud Date: 2006-07-18
Final Drill Date: 2006-08-03
Well Total Depth: 2616.00 m
Surface Hole Latitude: 54.893484
Surface Hole Longitude: -115.175485

For data sources see[1][2]

Well History

Date Event
2006-07-05 Obtained License
2006-07-20 Lost Circulation Occurred
2006-07-20 Surface Casing Operation Performed
2006-07-23 Direction Drilling Operation Performed - Deviate
2006-08-03 Finished Drilling
2006-08-03 Well Log Performed
2006-08-03 Well Mode changed to Drilled and Cased
2006-08-04 Well Log Performed
2006-08-05 Production Casing Operation Performed
2006-08-05 Rig Released
2006-10-03 Perforation Treatment Performed - Jet Perforation
2006-10-05 Perforation Treatment Performed - Fractured
2012-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-29 Perforation Treatment Performed - Jet Perforation
2012-01-29 Plug Back Performed
2012-02-06 Perforation Treatment Performed - Fractured
2012-02-06 Well Began Production
2012-02-06 Well Fluid changed to Water
2012-02-06 Well Type changed to Source

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-07-23 1195.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-03 Perforation 2565.00 2587.00 20
2006-10-05 Fracture 2565.00 2587.00 0
2012-01-29 Packing Device Capped w/Cement 2544.00 2552.00 0
2012-01-29 Perforation 1379.00 1385.00 17
2012-02-06 Fracture 1379.00 1385.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3329 0.0 0.0 0.0
2013 8042 0.0 0.0 0.0
2014 8326 0.0 0.0 0.0
2015 4928 0.0 0.0 0.0
2016 7059 0.0 0.0 0.0
2017 8256 0.0 0.0 0.0
2018 8578 0.0 0.0 0.0
2019 8434 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-07-20 Lost Circulation 150.00 150.00

For data sources see[7]

References