X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685083009000

Well Details

Well ID: 0685083009000
Loading map...
Location: 00/09-30-068-08W5/0
Location Alias: 00/09-30-68-08 W5M
Location Alias 2: 00/09-30-068-08 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 08
Section: 30
County/Municipality: Big Lakes County
Well Name: ASPENLEAF 15-29 HZ SWANH 9-30-68-8
Operator Name: Aspenleaf Energy Limited
License Number: 0419357
License Date: 2010-03-22
License Status: Amended
Spud Date: 2010-04-26
Final Drill Date: 2010-05-18
Well Total Depth: 3490.00 m
Surface Hole Latitude: 54.922615
Surface Hole Longitude: -115.183395

For data sources see[1][2]

Well History

Date Event
2010-03-22 Obtained License
2010-04-28 Surface Casing Operation Performed
2010-05-05 Direction Drilling Operation Performed - Horizontal
2010-05-07 Well Log Performed
2010-05-10 Intermediate Casing Operation Performed
2010-05-18 Finished Drilling
2010-05-18 Well Log Performed
2010-05-18 Well Mode changed to Drilled and Cased
2010-05-28 Liner Casing Operation Performed
2010-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2010-05-28 Perforation Treatment Performed - Open-Hole Completion
2010-05-30 Rig Released
2010-06-25 Well Log Performed
2010-07-04 Well Began Production
2010-07-04 Well Fluid changed to Crude Oil
2010-07-04 Well Mode changed to Pumping
2012-01-31 Well Log Performed
2012-02-04 Well Log Performed
2012-03-31 Well Began Injection
2012-03-31 Well Fluid changed to Water
2012-03-31 Well Type changed to Injection
2014-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-05-05 2100.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-05-28 Open Hole/Barefoot Completion 2515.00 3465.90 0
2010-05-28 Multi-Stage Fracture 2515.00 3465.90 0
2014-11-20 Acid Treatment 2515.00 3465.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3583 0.0 0.0 0.0
2011 6852 0.0 0.0 0.0
2012 288 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-18 No Incident Encountered 0.00 0.00
2014-11-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References