If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0685090204030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.852489,"lon":-115.254441,"icon":""}]} |
Location: 03/04-02-068-09W5/0 | |
Location Alias: 03/04-02-68-09 W5M | |
Location Alias 2: 03/04-02-068-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 5 | |
Range: 09 | |
Section: 02 | |
County/Municipality: Big Lakes County | |
Well Name: ASPENLEAF 2-2 HZ SWANH 4-2-68-9 | |
Operator Name: Aspenleaf Energy Limited | |
License Number: 0424192 | |
License Date: 2010-10-05 | |
License Status: Issued | |
Spud Date: 2010-10-08 | |
Final Drill Date: 2010-10-30 | |
Well Total Depth: 3064.00 m | |
Surface Hole Latitude: 54.852489 | |
Surface Hole Longitude: -115.254441 |
Date | Event |
---|---|
2010-10-05 | Obtained License |
2010-10-09 | Surface Casing Operation Performed |
2010-10-17 | Direction Drilling Operation Performed - Horizontal |
2010-10-21 | Well Log Performed |
2010-10-24 | Intermediate Casing Operation Performed |
2010-10-30 | Finished Drilling |
2010-10-30 | Well Mode changed to Drilled and Cased |
2010-11-04 | Well Log Performed |
2010-11-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-06 | Perforation Treatment Performed - Open-Hole Completion |
2010-11-08 | Rig Released |
2010-12-01 | Well Began Production |
2010-12-01 | Well Fluid changed to Crude Oil |
2010-12-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-17 | 2100.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-06 | Open Hole/Barefoot Completion | 2527.00 | 3064.00 | 0 |
2010-11-06 | Multi-Stage Fracture | 2527.00 | 3064.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 264 | 0.0 | 0.0 | 0.0 |
2011 | 7103 | 0.0 | 0.0 | 0.0 |
2012 | 7259 | 0.0 | 0.0 | 0.0 |
2013 | 2104 | 0.0 | 0.0 | 0.0 |
2014 | 7580 | 0.0 | 0.0 | 0.0 |
2015 | 8439 | 0.0 | 0.0 | 0.0 |
2016 | 8343 | 0.0 | 0.0 | 0.0 |
2017 | 7599 | 0.0 | 0.0 | 0.0 |
2018 | 7554 | 0.0 | 0.0 | 0.0 |
2019 | 6922 | 0.0 | 0.0 | 0.0 |
2020 | 1994 | 0.0 | 0.0 | 0.0 |
For data sources see[6]