X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685223513000

Well Details

Well ID: 0685223513000
Loading map...
Location: 00/13-35-068-22W5/0
Location Alias: 00/13-35-68-22 W5M
Location Alias 2: 00/13-35-068-22 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 22
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: PEMBINA ET AL STURLS 13-35-68-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0023697
License Date: 1963-01-23
License Status: RecCertified
Spud Date: 1963-01-30
Final Drill Date: 1963-03-10
Well Total Depth: 2601.80 m
Surface Hole Latitude: 54.935834
Surface Hole Longitude: -117.252135

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-23 Obtained License
1963-03-10 Finished Drilling
1963-03-10 Well Mode changed to Drilled and Cased
1963-03-12 Production Casing Operation Performed
1963-03-17 Perforation Treatment Performed - Jet Perforation
1963-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-19 Well Began Production
1963-03-19 Well Fluid changed to Crude Oil
1963-03-19 Well Mode changed to Flowing
1972-05-07 Well Fluid changed to Crude Oil
1972-05-07 Well Mode changed to Pumping
1978-01-01 Well Fluid changed to Crude Oil
1978-01-01 Well Mode changed to Suspended
1978-06-07 Perforation Treatment Performed - Cement Squeeze
1978-06-08 Perforation Treatment Performed - Jet Perforation
1978-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-11 Perforation Treatment Performed - Jet Perforation
1978-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-27 Well Log Performed
1992-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-29 Perforation Treatment Performed - Jet Perforation
1992-05-29 Plug Back Performed
1992-05-30 Perforation Treatment Performed - Remedial Casing
1992-05-30 Well Abandoned
1992-05-30 Well Fluid changed to Crude Oil
1992-05-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-03-17 Perforation 2597.50 2599.90 13
1992-05-30 Remedial Casing Cementing 453.00 454.00 0
1963-03-18 Acid Treatment 2597.50 2599.90 0
1978-06-07 Cement Squeeze 2597.50 2599.90 0
1978-06-08 Perforation 2594.60 2596.10 13
1978-06-09 Acid Treatment 2594.60 2596.10 0
1978-06-11 Perforation 2595.80 2597.00 13
1978-06-12 Acid Treatment 2594.60 2597.00 0
1992-05-29 Packing Device Capped w/Cement 2571.50 2579.50 0
1992-05-29 Perforation 453.00 454.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7717 0.0 0.0 0.0
1968 7251 0.0 0.0 0.0
1969 7135 0.0 0.0 0.0
1970 8096 0.0 0.0 0.0
1971 7985 0.0 0.0 0.0
1972 7647 0.0 0.0 0.0
1973 8409 0.0 0.0 0.0
1974 8132 0.0 0.0 0.0
1975 8212 0.0 0.0 0.0
1976 7825 0.0 0.0 0.0
1977 4952 0.0 0.0 0.0

For data sources see[5]

References