X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685252801000

Well Details

Well ID: 0685252801000
Loading map...
Location: 00/01-28-068-25W5/0
Location Alias: 00/01-28-68-25 W5M
Location Alias 2: 00/01-28-068-25 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 25
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: NAL HZ ANTEN 1-28-68-25
Operator Name: NAL Resources Limited
License Number: 0491089
License Date: 2018-09-24
License Status: Amended
Spud Date: 2018-10-24
Final Drill Date: 2018-11-06
Well Total Depth: 4881.00 m
Surface Hole Latitude: 54.938948
Surface Hole Longitude: -117.742737

For data sources see[1][2]

Well History

Date Event
2018-09-24 Obtained License
2018-10-25 Surface Casing Operation Performed
2018-10-27 Direction Drilling Operation Performed - Deviate
2018-10-30 Intermediate Casing Operation Performed
2018-11-01 Direction Drilling Operation Performed - Horizontal
2018-11-06 Finished Drilling
2018-11-06 Well Mode changed to Drilled and Cased
2018-11-07 Liner Casing Operation Performed
2018-11-07 Well Log Performed
2018-11-08 Rig Released
2018-12-01 Well Began Production
2018-12-01 Well Fluid changed to Crude Oil
2018-12-01 Well Mode changed to Flowing
2018-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-09 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-10-27 705.00 Deviate (5 - 79 degrees)
2018-11-01 1931.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-12-05 Multi-Stage Fracture 4848.90 4849.60 0
2018-12-05 Multi-Stage Fracture 4155.10 4155.70 0
2018-12-05 Multi-Stage Fracture 4071.70 4072.30 0
2018-12-05 Multi-Stage Fracture 3988.30 3988.90 0
2018-12-05 Multi-Stage Fracture 3904.90 3905.50 0
2018-12-05 Multi-Stage Fracture 3821.60 3822.20 0
2018-12-05 Multi-Stage Fracture 3738.40 3739.00 0
2018-12-05 Multi-Stage Fracture 3655.00 3656.20 0
2018-12-05 Multi-Stage Fracture 3571.80 3573.00 0
2018-12-09 Multi-Stage Fracture 3488.50 3489.80 0
2018-12-09 Multi-Stage Fracture 3405.50 3406.70 0
2018-12-05 Multi-Stage Fracture 4798.60 4799.30 0
2018-12-09 Multi-Stage Fracture 3322.50 3323.70 0
2018-12-09 Multi-Stage Fracture 3239.10 3240.30 0
2018-12-09 Multi-Stage Fracture 3155.60 3156.90 0
2018-12-09 Multi-Stage Fracture 3072.30 3073.60 0
2018-12-09 Multi-Stage Fracture 2989.00 2990.20 0
2018-12-09 Multi-Stage Fracture 2905.60 2906.90 0
2018-12-09 Multi-Stage Fracture 2822.20 2823.50 0
2018-12-09 Multi-Stage Fracture 2739.20 2740.40 0
2018-12-09 Multi-Stage Fracture 2656.00 2657.20 0
2018-12-09 Multi-Stage Fracture 2572.70 2573.90 0
2018-12-05 Multi-Stage Fracture 4726.90 4727.50 0
2018-12-09 Multi-Stage Fracture 2489.30 2490.60 0
2018-12-09 Multi-Stage Fracture 2406.10 2407.30 0
2018-12-09 Multi-Stage Fracture 2322.80 2324.00 0
2018-12-09 Multi-Stage Fracture 2240.00 2241.20 0
2018-12-09 Multi-Stage Fracture 2156.90 2158.10 0
2018-12-09 Multi-Stage Fracture 2073.40 2074.60 0
2018-12-09 Multi-Stage Fracture 1990.20 1991.40 0
2018-12-05 Multi-Stage Fracture 4655.20 4655.80 0
2018-12-05 Multi-Stage Fracture 4571.80 4572.40 0
2018-12-05 Multi-Stage Fracture 4488.50 4489.10 0
2018-12-05 Multi-Stage Fracture 4405.10 4405.80 0
2018-12-05 Multi-Stage Fracture 4321.90 4322.50 0
2018-12-05 Multi-Stage Fracture 4238.50 4239.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-12-05 2018-12-09 1,823 7,883 N/A
2 2018-12-05 2018-12-05 1,823 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.6138 N/A
water Not Available 100 77.8734 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 18.6298 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.7451 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0092 N/A
dibromoacetonitrile 3252-43-5 100 0.0092 N/A
non-hazardous ingredients Not Available 100 0.0092 N/A
polyethylene glycol 25322-68-3 100 0.0092 N/A
sodium bromide 7647-15-6 100 0.0092 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0385 N/A
FR-24 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0409 N/A
non-hazardous ingredients Not Available 100 0.0409 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0379 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0379 N/A
methanol 67-56-1 100 0.0379 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0379 N/A
non-hazardous ingredients Not Available 100 0.0379 N/A
2 HVFR-2 Trican Friction Reducer alcohols C12-C15. ethoxylated propoxylated 68551-13-3 100 0.3942 N/A
distillates (petroleum). hydrotreated heavy naphthenic 64742-52-5 100 0.3941 N/A
naphtha (petroleum). hydrotreated heavy 64742-48-9 100 0.3942 N/A
non-hazardous ingredients Not Available 100 0.3941 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-11-29 2018-12-02 Recycled Fracturing Water (treated at well site) 7707

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 744 0.0 0.0 0.0
2019 6082 0.0 0.0 0.0
2020 1528 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-04 No Incident Encountered 0.00 0.00

For data sources see[9]

References