If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686060609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.886079,"lon":-118.933487,"icon":""}]} |
Location: 00/09-06-068-06W6/0 | |
Location Alias: 00/09-06-68-06 W6M | |
Location Alias 2: 00/09-06-068-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 06 | |
Section: 06 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ ELM 9-6-68-6 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0480473 | |
License Date: 2016-09-27 | |
License Status: Amended | |
Spud Date: 2016-12-08 | |
Final Drill Date: 2017-02-04 | |
Well Total Depth: 6705.00 m | |
Surface Hole Latitude: 54.886079 | |
Surface Hole Longitude: -118.933487 |
Date | Event |
---|---|
2016-09-27 | Obtained License |
2016-12-11 | Surface Casing Operation Performed |
2017-01-12 | Direction Drilling Operation Performed - Deviate |
2017-01-15 | Direction Drilling Operation Performed - Horizontal |
2017-01-15 | Well Log Performed |
2017-01-16 | Intermediate Casing Operation Performed |
2017-02-04 | Finished Drilling |
2017-02-04 | Well Log Performed |
2017-02-04 | Well Mode changed to Drilled and Cased |
2017-02-06 | Liner Casing Operation Performed |
2017-02-10 | Perforation Treatment Performed - Open-Hole Completion |
2017-02-10 | Rig Released |
2017-06-10 | Perforation Treatment Performed - Jet Perforation |
2017-06-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-11 | Perforation Treatment Performed - Jet Perforation |
2017-06-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-12 | Perforation Treatment Performed - Jet Perforation |
2017-06-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-13 | Perforation Treatment Performed - Jet Perforation |
2017-06-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-14 | Perforation Treatment Performed - Jet Perforation |
2017-06-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-16 | Perforation Treatment Performed - Jet Perforation |
2017-06-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-17 | Perforation Treatment Performed - Jet Perforation |
2017-06-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-18 | Perforation Treatment Performed - Jet Perforation |
2017-06-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-19 | Perforation Treatment Performed - Jet Perforation |
2017-06-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-20 | Perforation Treatment Performed - Jet Perforation |
2017-06-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-21 | Perforation Treatment Performed - Jet Perforation |
2017-06-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-22 | Perforation Treatment Performed - Jet Perforation |
2017-06-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-23 | Perforation Treatment Performed - Jet Perforation |
2017-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-24 | Perforation Treatment Performed - Jet Perforation |
2017-06-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-25 | Perforation Treatment Performed - Jet Perforation |
2017-06-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-26 | Perforation Treatment Performed - Jet Perforation |
2017-06-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-17 | Well Began Production |
2017-07-17 | Well Fluid changed to Gas |
2017-07-17 | Well Mode changed to Flowing |
2019-05-19 | Well Fluid changed to Gas |
2019-05-19 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-12-08 | Precision Drilling Corporation | 630 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-12 | 2443.70 | Deviate (5 - 79 degrees) |
2017-01-15 | 2803.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-02-10 | Open Hole/Barefoot Completion | 6700.00 | 6705.00 | 0 |
2017-06-11 | Multi-Stage Fracture | 6464.00 | 6465.00 | 0 |
2017-06-23 | Multi-Stage Fracture | 3785.00 | 3786.00 | 0 |
2017-06-24 | Perforation | 3741.00 | 3742.00 | 13 |
2017-06-24 | Multi-Stage Fracture | 3741.00 | 3742.00 | 0 |
2017-06-24 | Perforation | 3698.00 | 3699.00 | 13 |
2017-06-24 | Multi-Stage Fracture | 3698.00 | 3699.00 | 0 |
2017-06-24 | Perforation | 3655.00 | 3656.00 | 13 |
2017-06-24 | Multi-Stage Fracture | 3655.00 | 3656.00 | 0 |
2017-06-24 | Perforation | 3611.00 | 3612.00 | 13 |
2017-06-24 | Multi-Stage Fracture | 3611.00 | 3612.00 | 0 |
2017-06-24 | Perforation | 3568.00 | 3569.00 | 13 |
2017-06-11 | Perforation | 6409.00 | 6410.00 | 13 |
2017-06-24 | Multi-Stage Fracture | 3568.00 | 3569.00 | 0 |
2017-06-24 | Perforation | 3525.00 | 3526.00 | 13 |
2017-06-24 | Multi-Stage Fracture | 3525.00 | 3526.00 | 0 |
2017-06-24 | Perforation | 3482.00 | 3483.00 | 13 |
2017-06-24 | Multi-Stage Fracture | 3482.00 | 3483.00 | 0 |
2017-06-24 | Perforation | 3439.00 | 3440.00 | 13 |
2017-06-24 | Multi-Stage Fracture | 3439.00 | 3440.00 | 0 |
2017-06-25 | Perforation | 3396.00 | 3397.00 | 13 |
2017-06-25 | Multi-Stage Fracture | 3396.00 | 3397.00 | 0 |
2017-06-25 | Perforation | 3354.00 | 3355.00 | 13 |
2017-06-11 | Multi-Stage Fracture | 6409.00 | 6410.00 | 0 |
2017-06-25 | Multi-Stage Fracture | 3354.00 | 3355.00 | 0 |
2017-06-25 | Perforation | 3311.00 | 3312.00 | 13 |
2017-06-25 | Multi-Stage Fracture | 3311.00 | 3312.00 | 0 |
2017-06-25 | Perforation | 3268.00 | 3269.00 | 13 |
2017-06-25 | Multi-Stage Fracture | 3268.00 | 3269.00 | 0 |
2017-06-25 | Perforation | 3225.00 | 3226.00 | 13 |
2017-06-25 | Multi-Stage Fracture | 3225.00 | 3226.00 | 0 |
2017-06-25 | Perforation | 3182.00 | 3183.00 | 13 |
2017-06-25 | Multi-Stage Fracture | 3182.00 | 3183.00 | 0 |
2017-06-25 | Perforation | 3139.00 | 3140.00 | 13 |
2017-06-12 | Perforation | 6354.00 | 6355.00 | 13 |
2017-06-25 | Multi-Stage Fracture | 3139.00 | 3140.00 | 0 |
2017-06-25 | Perforation | 3096.00 | 3097.00 | 13 |
2017-06-25 | Multi-Stage Fracture | 3096.00 | 3097.00 | 0 |
2017-06-26 | Perforation | 3054.00 | 3055.00 | 13 |
2017-06-26 | Multi-Stage Fracture | 3054.00 | 3055.00 | 0 |
2017-06-26 | Perforation | 3011.00 | 3012.00 | 13 |
2017-06-26 | Multi-Stage Fracture | 3011.00 | 3012.00 | 0 |
2017-06-26 | Perforation | 2970.00 | 2971.00 | 13 |
2017-06-26 | Multi-Stage Fracture | 2970.00 | 2971.00 | 0 |
2017-06-26 | Perforation | 2928.00 | 2929.00 | 13 |
2017-06-12 | Multi-Stage Fracture | 6354.00 | 6355.00 | 0 |
2017-06-26 | Multi-Stage Fracture | 2928.00 | 2929.00 | 0 |
2017-06-26 | Perforation | 2887.00 | 2888.00 | 13 |
2017-06-26 | Multi-Stage Fracture | 2887.00 | 2888.00 | 0 |
2017-06-12 | Perforation | 6292.00 | 6293.00 | 13 |
2017-06-12 | Multi-Stage Fracture | 6292.00 | 6293.00 | 0 |
2017-06-13 | Perforation | 6242.00 | 6243.00 | 13 |
2017-06-13 | Multi-Stage Fracture | 6242.00 | 6243.00 | 0 |
2017-06-13 | Perforation | 6187.00 | 6188.00 | 13 |
2017-06-10 | Multi-Stage Fracture | 6682.70 | 6682.80 | 0 |
2017-06-13 | Multi-Stage Fracture | 6187.00 | 6188.00 | 0 |
2017-06-13 | Perforation | 6128.00 | 6129.00 | 13 |
2017-06-13 | Multi-Stage Fracture | 6128.00 | 6129.00 | 0 |
2017-06-14 | Perforation | 6072.00 | 6073.00 | 13 |
2017-06-14 | Multi-Stage Fracture | 6072.00 | 6073.00 | 0 |
2017-06-16 | Perforation | 6021.00 | 6022.00 | 13 |
2017-06-16 | Multi-Stage Fracture | 6021.00 | 6022.00 | 0 |
2017-06-16 | Perforation | 5968.00 | 5969.00 | 13 |
2017-06-16 | Multi-Stage Fracture | 5968.00 | 5969.00 | 0 |
2017-06-16 | Perforation | 5913.00 | 5914.00 | 13 |
2017-06-10 | Perforation | 6623.00 | 6624.00 | 13 |
2017-06-16 | Multi-Stage Fracture | 5913.00 | 5914.00 | 0 |
2017-06-16 | Perforation | 5857.00 | 5858.00 | 13 |
2017-06-16 | Multi-Stage Fracture | 5857.00 | 5858.00 | 0 |
2017-06-16 | Perforation | 5802.00 | 5803.00 | 13 |
2017-06-16 | Multi-Stage Fracture | 5802.00 | 5803.00 | 0 |
2017-06-16 | Perforation | 5746.00 | 5747.00 | 13 |
2017-06-16 | Multi-Stage Fracture | 5746.00 | 5747.00 | 0 |
2017-06-17 | Perforation | 5691.00 | 5692.00 | 13 |
2017-06-17 | Multi-Stage Fracture | 5691.00 | 5692.00 | 0 |
2017-06-17 | Perforation | 5636.00 | 5637.00 | 13 |
2017-06-10 | Multi-Stage Fracture | 6623.00 | 6624.00 | 0 |
2017-06-17 | Multi-Stage Fracture | 5636.00 | 5637.00 | 0 |
2017-06-17 | Perforation | 5580.00 | 5581.00 | 13 |
2017-06-17 | Multi-Stage Fracture | 5580.00 | 5581.00 | 0 |
2017-06-17 | Perforation | 5525.00 | 5526.00 | 13 |
2017-06-17 | Multi-Stage Fracture | 5525.00 | 5526.00 | 0 |
2017-06-18 | Perforation | 5470.00 | 5471.00 | 13 |
2017-06-18 | Multi-Stage Fracture | 5470.00 | 5471.00 | 0 |
2017-06-18 | Perforation | 5415.00 | 5416.00 | 13 |
2017-06-18 | Multi-Stage Fracture | 5415.00 | 5416.00 | 0 |
2017-06-18 | Perforation | 5360.00 | 5361.00 | 13 |
2017-06-11 | Perforation | 6569.00 | 6570.00 | 13 |
2017-06-18 | Multi-Stage Fracture | 5360.00 | 5361.00 | 0 |
2017-06-19 | Perforation | 5305.00 | 5306.00 | 13 |
2017-06-19 | Multi-Stage Fracture | 5305.00 | 5306.00 | 0 |
2017-06-19 | Perforation | 5250.00 | 5251.00 | 13 |
2017-06-19 | Multi-Stage Fracture | 5250.00 | 5251.00 | 0 |
2017-06-19 | Perforation | 5194.00 | 5195.00 | 13 |
2017-06-19 | Multi-Stage Fracture | 5194.00 | 5195.00 | 0 |
2017-06-19 | Perforation | 5139.00 | 5140.00 | 13 |
2017-06-19 | Multi-Stage Fracture | 5139.00 | 5140.00 | 0 |
2017-06-19 | Perforation | 5084.00 | 5085.00 | 13 |
2017-06-11 | Multi-Stage Fracture | 6569.00 | 6570.00 | 0 |
2017-06-19 | Multi-Stage Fracture | 5084.00 | 5085.00 | 0 |
2017-06-20 | Perforation | 5024.00 | 5025.00 | 13 |
2017-06-20 | Multi-Stage Fracture | 5024.00 | 5025.00 | 0 |
2017-06-20 | Perforation | 4968.00 | 4969.00 | 13 |
2017-06-20 | Multi-Stage Fracture | 4968.00 | 4969.00 | 0 |
2017-06-20 | Perforation | 4916.00 | 4917.00 | 13 |
2017-06-20 | Multi-Stage Fracture | 4916.00 | 4917.00 | 0 |
2017-06-20 | Perforation | 4861.00 | 4862.00 | 13 |
2017-06-20 | Multi-Stage Fracture | 4861.00 | 4862.00 | 0 |
2017-06-20 | Perforation | 4802.00 | 4803.00 | 13 |
2017-06-11 | Perforation | 6515.00 | 6516.00 | 13 |
2017-06-20 | Multi-Stage Fracture | 4802.00 | 4803.00 | 0 |
2017-06-21 | Perforation | 4745.00 | 4746.00 | 13 |
2017-06-21 | Multi-Stage Fracture | 4745.00 | 4746.00 | 0 |
2017-06-21 | Perforation | 4695.00 | 4696.00 | 13 |
2017-06-21 | Multi-Stage Fracture | 4695.00 | 4696.00 | 0 |
2017-06-21 | Perforation | 4644.00 | 4645.00 | 13 |
2017-06-21 | Multi-Stage Fracture | 4644.00 | 4645.00 | 0 |
2017-06-21 | Perforation | 4602.00 | 4603.00 | 13 |
2017-06-21 | Multi-Stage Fracture | 4602.00 | 4603.00 | 0 |
2017-06-21 | Perforation | 4559.00 | 4560.00 | 13 |
2017-06-11 | Multi-Stage Fracture | 6515.00 | 6516.00 | 0 |
2017-06-21 | Multi-Stage Fracture | 4559.00 | 4560.00 | 0 |
2017-06-22 | Perforation | 4516.00 | 4517.00 | 13 |
2017-06-22 | Multi-Stage Fracture | 4516.00 | 4517.00 | 0 |
2017-06-22 | Perforation | 4474.00 | 4475.00 | 13 |
2017-06-22 | Multi-Stage Fracture | 4474.00 | 4475.00 | 0 |
2017-06-22 | Perforation | 4432.00 | 4433.00 | 13 |
2017-06-22 | Multi-Stage Fracture | 4432.00 | 4433.00 | 0 |
2017-06-22 | Perforation | 4390.00 | 4391.00 | 13 |
2017-06-22 | Multi-Stage Fracture | 4390.00 | 4391.00 | 0 |
2017-06-22 | Perforation | 3999.00 | 4000.00 | 13 |
2017-06-11 | Perforation | 6464.00 | 6465.00 | 13 |
2017-06-22 | Multi-Stage Fracture | 3999.00 | 4000.00 | 0 |
2017-06-22 | Perforation | 3956.00 | 3957.00 | 13 |
2017-06-22 | Multi-Stage Fracture | 3956.00 | 3957.00 | 0 |
2017-06-23 | Perforation | 3914.00 | 3915.00 | 13 |
2017-06-23 | Multi-Stage Fracture | 3914.00 | 3915.00 | 0 |
2017-06-23 | Perforation | 3871.00 | 3872.00 | 13 |
2017-06-23 | Multi-Stage Fracture | 3871.00 | 3872.00 | 0 |
2017-06-23 | Perforation | 3828.00 | 3829.00 | 13 |
2017-06-23 | Multi-Stage Fracture | 3828.00 | 3829.00 | 0 |
2017-06-23 | Perforation | 3785.00 | 3786.00 | 13 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-06-10 | 2017-06-26 | 2,693 | 56,864 | N/A |
2 | 2017-06-16 | 2017-06-16 | 2,693 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.6804 | N/A | |||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 9.1033 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 9.1033 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 9.1033 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 9.1033 | N/A | ||||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 2.2031 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 2.2031 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 2.2031 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 2.203 | N/A | ||||
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0001 | N/A | ||||
CAN-1636 pH Buffer (LpH) | Canyon Technical Services | Buffer | Acetic Acid | 64-19-7 | 100 | 0.0002 | N/A | |
Water | 7732-18-5 | 100 | 0.0002 | N/A | ||||
CAN-2200S Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Monoethanolamine | 141-43-5 | 100 | 0.0031 | N/A | |
Water | 7732-18-5 | 100 | 0.0031 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.0079 | N/A | |
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0605 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0274 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.0274 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0274 | N/A | ||||
2 | HCL 15% | Canyon Technical Services | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 0.4736 | N/A |
Water | 7732-18-5 | 100 | 0.4736 | N/A | ||||
CAN-1004 Corrosion Inhibitor | Canyon Technical Services | Corrosion Inhibitor | Alcohols. C12-15. ethoxylated | 68131-39-5 | 100 | 0.0013 | N/A | |
Alcohols. C14-15. ethoxylated | 68951-67-7 | 100 | 0.0013 | N/A | ||||
Formic Acid | 64-18-6 | 100 | 0.0013 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0013 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0013 | N/A | ||||
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0013 | N/A | ||||
CAN-1203 Anti-Sludge Agent / Non-Emulsifier | Canyon Technical Services | Demulsifier | Refer to MSDS | 8253 | 100 | 0.0007 | N/A | |
CAN-1101 Iron Control Reduction | Canyon Technical Services | Iron Control | 2-Mercaptoethanol | 60-24-2 | 100 | 0.0037 | N/A | |
Cupric Chloride | 7447-39-4 | 100 | 0.0037 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0037 | N/A | ||||
CAN-1202 Acid Wetting Agent | Canyon Technical Services | Surfactant | 1-Methoxy-2-Propanol | 107-98-2 | 100 | 0.0017 | N/A | |
Water | 7732-18-5 | 100 | 0.0017 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-05-15 | 2017-06-26 | Groundwater - Non-saline less than or equal to 150m deep | 14587 |
2017-06-01 | 2017-06-26 | Groundwater - Non-saline less than or equal to 150m deep | 3827 |
2017-06-11 | 2017-06-25 | Surface Water - Runoff | 17931 |
2017-06-12 | 2017-06-20 | Groundwater - Non-saline greater than 150m deep | 20519 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 3264 | 0.0 | 0.0 | 0.0 |
2018 | 8447 | 0.0 | 0.0 | 0.0 |
2019 | 7344 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-10 | No Incident Encountered | 0.00 | 0.00 |
2017-06-26 | No Incident Encountered | 0.00 | 0.00 |
2019-05-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]