X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686060616030

Well Details

Well ID: 0686060616030
Loading map...
Location: 03/16-06-068-06W6/0
Location Alias: 03/16-06-68-06 W6M
Location Alias 2: 03/16-06-068-06 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 06
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA 103 HZ ELM 16-6-68-6
Operator Name: NuVista Energy Ltd.
License Number: 0480504
License Date: 2016-09-28
License Status: Issued
Spud Date: 2016-12-12
Final Drill Date: 2017-02-22
Well Total Depth: 6206.00 m
Surface Hole Latitude: 54.886168
Surface Hole Longitude: -118.933515

For data sources see[1][2]

Well History

Date Event
2016-09-28 Obtained License
2016-12-14 Surface Casing Operation Performed
2017-01-02 Direction Drilling Operation Performed - Deviate
2017-01-04 Direction Drilling Operation Performed - Horizontal
2017-01-05 Well Log Performed
2017-01-06 Intermediate Casing Operation Performed
2017-02-22 Finished Drilling
2017-02-22 Well Log Performed
2017-02-22 Well Mode changed to Drilled and Cased
2017-02-25 Liner Casing Operation Performed
2017-02-27 Perforation Treatment Performed - Open-Hole Completion
2017-02-27 Rig Released
2017-06-10 Perforation Treatment Performed - Jet Perforation
2017-06-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-11 Perforation Treatment Performed - Jet Perforation
2017-06-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-12 Perforation Treatment Performed - Jet Perforation
2017-06-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-13 Perforation Treatment Performed - Jet Perforation
2017-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-14 Perforation Treatment Performed - Jet Perforation
2017-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-15 Perforation Treatment Performed - Jet Perforation
2017-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-16 Perforation Treatment Performed - Jet Perforation
2017-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-17 Perforation Treatment Performed - Jet Perforation
2017-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-18 Perforation Treatment Performed - Jet Perforation
2017-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-19 Perforation Treatment Performed - Jet Perforation
2017-06-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-20 Perforation Treatment Performed - Jet Perforation
2017-06-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-21 Perforation Treatment Performed - Jet Perforation
2017-06-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-22 Perforation Treatment Performed - Jet Perforation
2017-06-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-23 Perforation Treatment Performed - Jet Perforation
2017-06-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-24 Perforation Treatment Performed - Jet Perforation
2017-06-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-17 Well Began Production
2017-07-17 Well Fluid changed to Gas
2017-07-17 Well Mode changed to Flowing
2019-05-19 Well Fluid changed to Gas
2019-05-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-12 Precision Drilling Corporation 630 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-02 2433.90 Deviate (5 - 79 degrees)
2017-01-04 2793.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-27 Open Hole/Barefoot Completion 6200.00 6206.00 0
2017-06-11 Multi-Stage Fracture 5940.00 5941.00 0
2017-06-22 Multi-Stage Fracture 3493.00 3494.00 0
2017-06-22 Perforation 3443.00 3444.00 13
2017-06-22 Multi-Stage Fracture 3443.00 3444.00 0
2017-06-22 Perforation 3384.00 3385.00 13
2017-06-22 Multi-Stage Fracture 3384.00 3385.00 0
2017-06-22 Perforation 3335.00 3336.00 13
2017-06-22 Multi-Stage Fracture 3335.00 3336.00 0
2017-06-22 Perforation 3275.00 3276.00 13
2017-06-22 Multi-Stage Fracture 3275.00 3276.00 0
2017-06-23 Perforation 3214.00 3215.00 13
2017-06-12 Perforation 5878.00 5879.00 13
2017-06-23 Multi-Stage Fracture 3214.00 3215.00 0
2017-06-23 Perforation 3156.00 3157.00 13
2017-06-23 Multi-Stage Fracture 3156.00 3157.00 0
2017-06-23 Perforation 3100.00 3101.00 13
2017-06-23 Multi-Stage Fracture 3100.00 3101.00 0
2017-06-23 Perforation 3045.00 3046.00 13
2017-06-23 Multi-Stage Fracture 3045.00 3046.00 0
2017-06-23 Perforation 2990.00 2991.00 13
2017-06-23 Multi-Stage Fracture 2990.00 2991.00 0
2017-06-24 Perforation 2935.00 2936.00 13
2017-06-12 Multi-Stage Fracture 5878.00 5879.00 0
2017-06-24 Multi-Stage Fracture 2935.00 2936.00 0
2017-06-24 Perforation 2880.00 2881.00 13
2017-06-24 Multi-Stage Fracture 2880.00 2881.00 0
2017-06-12 Perforation 5830.00 5831.00 13
2017-06-12 Multi-Stage Fracture 5830.00 5831.00 0
2017-06-12 Perforation 5782.00 5783.00 13
2017-06-12 Multi-Stage Fracture 5782.00 5783.00 0
2017-06-12 Perforation 5725.00 5726.00 13
2017-06-12 Multi-Stage Fracture 5725.00 5726.00 0
2017-06-13 Perforation 5665.00 5666.00 13
2017-06-10 Multi-Stage Fracture 6194.20 6194.30 0
2017-06-13 Multi-Stage Fracture 5665.00 5666.00 0
2017-06-13 Perforation 5616.00 5617.00 13
2017-06-13 Multi-Stage Fracture 5616.00 5617.00 0
2017-06-13 Perforation 5557.00 5558.00 13
2017-06-13 Multi-Stage Fracture 5557.00 5558.00 0
2017-06-14 Perforation 5508.00 5509.00 13
2017-06-14 Multi-Stage Fracture 5508.00 5509.00 0
2017-06-14 Perforation 5448.00 5449.00 13
2017-06-14 Multi-Stage Fracture 5448.00 5449.00 0
2017-06-14 Perforation 5399.00 5400.00 13
2017-06-10 Perforation 6125.00 6126.00 13
2017-06-14 Multi-Stage Fracture 5399.00 5400.00 0
2017-06-14 Perforation 5339.00 5340.00 13
2017-06-14 Multi-Stage Fracture 5339.00 5340.00 0
2017-06-15 Perforation 5290.00 5291.00 13
2017-06-15 Multi-Stage Fracture 5290.00 5291.00 0
2017-06-15 Perforation 5230.00 5231.00 13
2017-06-15 Multi-Stage Fracture 5230.00 5231.00 0
2017-06-15 Perforation 5181.00 5182.00 13
2017-06-15 Multi-Stage Fracture 5181.00 5182.00 0
2017-06-15 Perforation 5121.00 5122.00 13
2017-06-10 Multi-Stage Fracture 6125.00 6126.00 0
2017-06-15 Multi-Stage Fracture 5121.00 5122.00 0
2017-06-15 Perforation 5072.00 5073.00 13
2017-06-15 Multi-Stage Fracture 5072.00 5073.00 0
2017-06-16 Perforation 5012.00 5013.00 13
2017-06-16 Multi-Stage Fracture 5012.00 5013.00 0
2017-06-16 Perforation 4963.00 4964.00 13
2017-06-16 Multi-Stage Fracture 4963.00 4964.00 0
2017-06-16 Perforation 4904.00 4905.00 13
2017-06-16 Multi-Stage Fracture 4904.00 4905.00 0
2017-06-16 Perforation 4855.00 4856.00 13
2017-06-11 Perforation 6063.00 6064.00 13
2017-06-16 Multi-Stage Fracture 4855.00 4856.00 0
2017-06-17 Perforation 4795.00 4796.00 13
2017-06-17 Multi-Stage Fracture 4795.00 4796.00 0
2017-06-17 Perforation 4746.00 4747.00 13
2017-06-17 Multi-Stage Fracture 4746.00 4747.00 0
2017-06-17 Perforation 4687.00 4688.00 13
2017-06-17 Multi-Stage Fracture 4687.00 4688.00 0
2017-06-17 Perforation 4637.00 4638.00 13
2017-06-17 Multi-Stage Fracture 4637.00 4638.00 0
2017-06-18 Perforation 4578.00 4579.00 13
2017-06-11 Multi-Stage Fracture 6063.00 6064.00 0
2017-06-18 Multi-Stage Fracture 4578.00 4579.00 0
2017-06-18 Perforation 4529.00 4530.00 13
2017-06-18 Multi-Stage Fracture 4529.00 4530.00 0
2017-06-18 Perforation 4470.00 4471.00 13
2017-06-18 Multi-Stage Fracture 4470.00 4471.00 0
2017-06-18 Perforation 4420.00 4421.00 13
2017-06-18 Multi-Stage Fracture 4420.00 4421.00 0
2017-06-18 Perforation 4362.00 4363.00 13
2017-06-18 Multi-Stage Fracture 4362.00 4363.00 0
2017-06-19 Perforation 4313.00 4314.00 13
2017-06-11 Perforation 6002.00 6003.00 13
2017-06-19 Multi-Stage Fracture 4313.00 4314.00 0
2017-06-19 Perforation 4253.00 4254.00 13
2017-06-19 Multi-Stage Fracture 4253.00 4254.00 0
2017-06-19 Perforation 4204.00 4205.00 13
2017-06-19 Multi-Stage Fracture 4204.00 4205.00 0
2017-06-19 Perforation 4145.00 4146.00 13
2017-06-19 Multi-Stage Fracture 4145.00 4146.00 0
2017-06-19 Perforation 4095.00 4096.00 13
2017-06-19 Multi-Stage Fracture 4095.00 4096.00 0
2017-06-20 Perforation 4035.00 4036.00 13
2017-06-11 Multi-Stage Fracture 6002.00 6003.00 0
2017-06-20 Multi-Stage Fracture 4035.00 4036.00 0
2017-06-20 Perforation 3986.00 3987.00 13
2017-06-20 Multi-Stage Fracture 3986.00 3987.00 0
2017-06-20 Perforation 3927.00 3928.00 13
2017-06-20 Multi-Stage Fracture 3927.00 3928.00 0
2017-06-20 Perforation 3877.00 3878.00 13
2017-06-20 Multi-Stage Fracture 3877.00 3878.00 0
2017-06-21 Perforation 3817.00 3818.00 13
2017-06-21 Multi-Stage Fracture 3817.00 3818.00 0
2017-06-21 Perforation 3768.00 3769.00 13
2017-06-11 Perforation 5940.00 5941.00 13
2017-06-21 Multi-Stage Fracture 3768.00 3769.00 0
2017-06-21 Perforation 3709.00 3710.00 13
2017-06-21 Multi-Stage Fracture 3709.00 3710.00 0
2017-06-21 Perforation 3659.00 3660.00 13
2017-06-21 Multi-Stage Fracture 3659.00 3660.00 0
2017-06-21 Perforation 3600.00 3601.00 13
2017-06-21 Multi-Stage Fracture 3600.00 3601.00 0
2017-06-21 Perforation 3552.00 3553.00 13
2017-06-21 Multi-Stage Fracture 3552.00 3553.00 0
2017-06-22 Perforation 3493.00 3494.00 13

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-10 2017-06-24 2,683 46,129 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.6427 N/A
Sand (30/50) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 8.9814 N/A
Crystalline silica. quartz 14808-60-7 100 8.9814 N/A
Iron Oxide 1309-37-1 100 8.9814 N/A
Titanium Oxide 13463-67-7 100 8.9813 N/A
Sand (40/70) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 2.2794 N/A
Crystalline silica. quartz 14808-60-7 100 2.2794 N/A
Iron Oxide 1309-37-1 100 2.2794 N/A
Titanium Oxide 13463-67-7 100 2.2794 N/A
CAN-2301 Breaker (Oxidizer) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0 N/A
Non-hazardous base ingredient(s) Not Available 100 0 N/A
CAN-1636 pH Buffer (LpH) Canyon Technical Services Buffer Acetic Acid 64-19-7 100 0.0001 N/A
Water 7732-18-5 100 0.0001 N/A
CAN-2200S Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Monoethanolamine 141-43-5 100 0.0032 N/A
Water 7732-18-5 100 0.0032 N/A
CAN-2000 Gellant (Guar) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.008 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0566 N/A
CAN-1402 Scale Inhibitor Canyon Technical Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0281 N/A
Potassium Chloride 7447-40-7 100 0.0281 N/A
Water 7732-18-5 100 0.0281 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-20 2017-06-20 Groundwater - Non-saline greater than 150m deep 2905
2017-06-18 2017-06-20 Surface Water - Runoff 4060
2017-06-18 2017-06-20 Surface Water - Runoff 5224
2017-06-14 2017-06-16 Surface Water - Runoff 12110
2017-06-10 2017-06-19 Surface Water - Runoff 21830

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 3050 0.0 0.0 0.0
2018 4703 0.0 0.0 0.0
2019 5352 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-27 No Incident Encountered 0.00 0.00
2017-06-26 No Incident Encountered 0.00 0.00
2019-05-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References