If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686072216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.886256,"lon":-118.933541,"icon":""}]} |
Location: 00/16-22-068-07W6/0 | |
Location Alias: 00/16-22-68-07 W6M | |
Location Alias 2: 00/16-22-068-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 07 | |
Section: 22 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ WAPITI 16-22-68-7 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0480478 | |
License Date: 2016-09-27 | |
License Status: Amended | |
Spud Date: 2016-12-14 | |
Final Drill Date: 2017-03-09 | |
Well Total Depth: 5730.00 m | |
Surface Hole Latitude: 54.886256 | |
Surface Hole Longitude: -118.933541 |
Date | Event |
---|---|
2016-09-27 | Obtained License |
2016-12-15 | Well Log Performed |
2016-12-16 | Surface Casing Operation Performed |
2016-12-23 | Direction Drilling Operation Performed - Deviate |
2016-12-25 | Direction Drilling Operation Performed - Horizontal |
2016-12-26 | Well Log Performed |
2016-12-27 | Intermediate Casing Operation Performed |
2017-03-09 | Finished Drilling |
2017-03-09 | Well Log Performed |
2017-03-09 | Well Mode changed to Drilled and Cased |
2017-03-13 | Liner Casing Operation Performed |
2017-03-13 | Rig Released |
2017-03-18 | Perforation Treatment Performed - Open-Hole Completion |
2017-06-10 | Perforation Treatment Performed - Jet Perforation |
2017-06-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-11 | Perforation Treatment Performed - Jet Perforation |
2017-06-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-12 | Perforation Treatment Performed - Jet Perforation |
2017-06-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-13 | Perforation Treatment Performed - Jet Perforation |
2017-06-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-14 | Perforation Treatment Performed - Jet Perforation |
2017-06-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-15 | Perforation Treatment Performed - Jet Perforation |
2017-06-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-16 | Perforation Treatment Performed - Jet Perforation |
2017-06-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-17 | Perforation Treatment Performed - Jet Perforation |
2017-06-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-18 | Perforation Treatment Performed - Jet Perforation |
2017-06-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-19 | Perforation Treatment Performed - Jet Perforation |
2017-06-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-20 | Perforation Treatment Performed - Jet Perforation |
2017-06-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-23 | Perforation Treatment Performed - Jet Perforation |
2017-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-07-25 | Well Began Production |
2017-07-25 | Well Fluid changed to Gas |
2017-07-25 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2016-12-23 | 2434.20 | Deviate (5 - 79 degrees) |
2016-12-25 | 2775.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-03-18 | Open Hole/Barefoot Completion | 5725.00 | 5730.00 | 0 |
2017-06-12 | Multi-Stage Fracture | 5321.00 | 5322.00 | 0 |
2017-06-12 | Perforation | 5230.00 | 5231.00 | 13 |
2017-06-12 | Multi-Stage Fracture | 5230.00 | 5231.00 | 0 |
2017-06-12 | Perforation | 5140.00 | 5141.00 | 13 |
2017-06-12 | Multi-Stage Fracture | 5140.00 | 5141.00 | 0 |
2017-06-12 | Perforation | 5049.00 | 5050.00 | 13 |
2017-06-12 | Multi-Stage Fracture | 5049.00 | 5050.00 | 0 |
2017-06-13 | Perforation | 4959.00 | 4960.00 | 13 |
2017-06-13 | Multi-Stage Fracture | 4959.00 | 4960.00 | 0 |
2017-06-13 | Perforation | 4868.00 | 4869.00 | 13 |
2017-06-10 | Multi-Stage Fracture | 5719.20 | 5719.30 | 0 |
2017-06-13 | Multi-Stage Fracture | 4868.00 | 4869.00 | 0 |
2017-06-13 | Perforation | 4778.00 | 4779.00 | 13 |
2017-06-13 | Multi-Stage Fracture | 4778.00 | 4779.00 | 0 |
2017-06-13 | Perforation | 4687.00 | 4688.00 | 13 |
2017-06-13 | Multi-Stage Fracture | 4687.00 | 4688.00 | 0 |
2017-06-14 | Perforation | 4597.00 | 4598.00 | 13 |
2017-06-14 | Multi-Stage Fracture | 4597.00 | 4598.00 | 0 |
2017-06-14 | Perforation | 4507.00 | 4508.00 | 13 |
2017-06-14 | Multi-Stage Fracture | 4507.00 | 4508.00 | 0 |
2017-06-14 | Perforation | 4417.00 | 4418.00 | 13 |
2017-06-10 | Perforation | 5592.00 | 5593.00 | 13 |
2017-06-14 | Multi-Stage Fracture | 4417.00 | 4418.00 | 0 |
2017-06-15 | Perforation | 4326.00 | 4327.00 | 13 |
2017-06-15 | Multi-Stage Fracture | 4326.00 | 4327.00 | 0 |
2017-06-15 | Perforation | 4236.00 | 4237.00 | 13 |
2017-06-15 | Multi-Stage Fracture | 4236.00 | 4237.00 | 0 |
2017-06-15 | Perforation | 4145.00 | 4146.00 | 13 |
2017-06-15 | Multi-Stage Fracture | 4145.00 | 4146.00 | 0 |
2017-06-15 | Perforation | 4055.00 | 4056.00 | 13 |
2017-06-15 | Multi-Stage Fracture | 4055.00 | 4056.00 | 0 |
2017-06-15 | Perforation | 3964.00 | 3965.00 | 13 |
2017-06-10 | Multi-Stage Fracture | 5592.00 | 5593.00 | 0 |
2017-06-15 | Multi-Stage Fracture | 3964.00 | 3965.00 | 0 |
2017-06-16 | Perforation | 3874.00 | 3875.00 | 13 |
2017-06-16 | Multi-Stage Fracture | 3874.00 | 3875.00 | 0 |
2017-06-16 | Perforation | 3783.00 | 3784.00 | 13 |
2017-06-16 | Multi-Stage Fracture | 3783.00 | 3784.00 | 0 |
2017-06-17 | Perforation | 3692.00 | 3693.00 | 13 |
2017-06-17 | Multi-Stage Fracture | 3692.00 | 3693.00 | 0 |
2017-06-18 | Perforation | 3602.00 | 3603.00 | 13 |
2017-06-18 | Multi-Stage Fracture | 3602.00 | 3603.00 | 0 |
2017-06-18 | Perforation | 3512.00 | 3513.00 | 13 |
2017-06-11 | Perforation | 5502.00 | 5503.00 | 13 |
2017-06-18 | Multi-Stage Fracture | 3512.00 | 3513.00 | 0 |
2017-06-19 | Perforation | 3421.00 | 3422.00 | 13 |
2017-06-19 | Multi-Stage Fracture | 3421.00 | 3422.00 | 0 |
2017-06-19 | Perforation | 3331.00 | 3332.00 | 13 |
2017-06-20 | Multi-Stage Fracture | 3331.00 | 3332.00 | 0 |
2017-06-20 | Perforation | 3240.00 | 3241.00 | 13 |
2017-06-20 | Multi-Stage Fracture | 3240.00 | 3241.00 | 0 |
2017-06-23 | Perforation | 3150.00 | 3151.00 | 13 |
2017-06-23 | Multi-Stage Fracture | 3150.00 | 3151.00 | 0 |
2017-06-23 | Perforation | 3060.00 | 3061.00 | 13 |
2017-06-11 | Multi-Stage Fracture | 5502.00 | 5503.00 | 0 |
2017-06-23 | Multi-Stage Fracture | 3060.00 | 3061.00 | 0 |
2017-06-23 | Perforation | 2967.00 | 2968.00 | 13 |
2017-06-23 | Multi-Stage Fracture | 2967.00 | 2968.00 | 0 |
2017-06-23 | Perforation | 2862.00 | 2863.00 | 13 |
2017-06-23 | Multi-Stage Fracture | 2862.00 | 2863.00 | 0 |
2017-06-11 | Perforation | 5411.00 | 5412.00 | 13 |
2017-06-11 | Multi-Stage Fracture | 5411.00 | 5412.00 | 0 |
2017-06-12 | Perforation | 5321.00 | 5322.00 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-06-10 | 2017-06-23 | 2,689 | 26,428 | N/A |
2 | 2017-06-10 | 2017-06-12 | 2,689 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 89.0647 | N/A | |||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 8.6683 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 8.6683 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.6683 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.6684 | N/A | ||||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 2.167 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 2.167 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 2.167 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 2.1671 | N/A | ||||
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0 | N/A | ||||
CAN-1636 pH Buffer (LpH) | Canyon Technical Services | Buffer | Acetic Acid | 64-19-7 | 100 | 0.0005 | N/A | |
Water | 7732-18-5 | 100 | 0.0005 | N/A | ||||
CAN-2200S Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Monoethanolamine | 141-43-5 | 100 | 0.0027 | N/A | |
Water | 7732-18-5 | 100 | 0.0027 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.007 | N/A | |
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0516 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0296 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.0296 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0296 | N/A | ||||
2 | CAN-2300 Breaker (Enzyme HpH) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0524 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-06-10 | 2017-06-26 | Surface Water - Runoff | 26427 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 3144 | 0.0 | 0.0 | 0.0 |
2018 | 7560 | 0.0 | 0.0 | 0.0 |
2019 | 8375 | 0.0 | 0.0 | 0.0 |
2020 | 1920 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-18 | No Incident Encountered | 0.00 | 0.00 |
2017-06-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]