If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686072513030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.907598,"lon":-118.914607,"icon":""}]} |
Location: 03/13-25-068-07W6/0 | |
Location Alias: 03/13-25-68-07 W6M | |
Location Alias 2: 03/13-25-068-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 07 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ ELM 13-25-68-7 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0457492 | |
License Date: 2013-06-12 | |
License Status: Issued | |
Spud Date: 2013-07-05 | |
Final Drill Date: 2013-07-31 | |
Well Total Depth: 4715.00 m | |
Surface Hole Latitude: 54.907598 | |
Surface Hole Longitude: -118.914607 |
Date | Event |
---|---|
2013-06-12 | Obtained License |
2013-07-08 | Surface Casing Operation Performed |
2013-07-14 | Direction Drilling Operation Performed - Deviate |
2013-07-18 | Direction Drilling Operation Performed - Horizontal |
2013-07-19 | Well Log Performed |
2013-07-20 | Intermediate Casing Operation Performed |
2013-07-31 | Finished Drilling |
2013-07-31 | Well Log Performed |
2013-07-31 | Well Mode changed to Drilled and Cased |
2013-08-03 | Liner Casing Operation Performed |
2013-08-04 | Rig Released |
2013-08-05 | Perforation Treatment Performed - Open-Hole Completion |
2013-08-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-16 | Well Fluid changed to Gas |
2013-08-16 | Well Mode changed to Testing |
2014-04-11 | Well Began Production |
2014-04-11 | Well Fluid changed to Gas |
2014-04-11 | Well Mode changed to Flowing |
2014-06-27 | Perforation Treatment Performed - Jet Perforation |
2014-06-28 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-07-05 | Trinidad Drilling Ltd. | 76 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-07-14 | 2356.70 | Deviate (5 - 79 degrees) |
2013-07-18 | 2719.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-08-05 | Open Hole/Barefoot Completion | 4710.00 | 4715.00 | 0 |
2013-08-14 | Multi-Stage Fracture | 3811.60 | 3811.70 | 0 |
2013-08-15 | Multi-Stage Fracture | 3689.50 | 3689.60 | 0 |
2013-08-15 | Multi-Stage Fracture | 3578.50 | 3578.60 | 0 |
2013-08-15 | Multi-Stage Fracture | 3467.20 | 3467.30 | 0 |
2013-08-15 | Multi-Stage Fracture | 3355.40 | 3355.50 | 0 |
2013-08-15 | Multi-Stage Fracture | 3243.90 | 3244.00 | 0 |
2013-08-15 | Multi-Stage Fracture | 3133.20 | 3133.30 | 0 |
2013-08-15 | Multi-Stage Fracture | 3021.30 | 3021.40 | 0 |
2013-08-15 | Multi-Stage Fracture | 2910.10 | 2910.20 | 0 |
2013-08-15 | Multi-Stage Fracture | 2823.70 | 2823.80 | 0 |
2013-08-14 | Multi-Stage Fracture | 4689.10 | 4689.20 | 0 |
2014-06-27 | Perforation | 4590.50 | 4591.00 | 20 |
2014-06-27 | Perforation | 4479.00 | 4480.00 | 13 |
2014-06-27 | Perforation | 4366.00 | 4367.00 | 13 |
2014-06-27 | Perforation | 4255.00 | 4256.00 | 13 |
2014-06-27 | Perforation | 4140.00 | 4140.50 | 20 |
2014-06-28 | Perforation | 4029.50 | 4030.00 | 20 |
2014-06-28 | Perforation | 3681.50 | 3682.00 | 20 |
2014-06-28 | Perforation | 3569.00 | 3570.00 | 13 |
2014-06-28 | Perforation | 3235.00 | 3236.00 | 13 |
2013-08-14 | Multi-Stage Fracture | 4599.60 | 4599.70 | 0 |
2013-08-14 | Multi-Stage Fracture | 4487.20 | 4487.30 | 0 |
2013-08-14 | Multi-Stage Fracture | 4374.30 | 4374.40 | 0 |
2013-08-14 | Multi-Stage Fracture | 4263.00 | 4263.10 | 0 |
2013-08-14 | Multi-Stage Fracture | 4148.40 | 4148.50 | 0 |
2013-08-14 | Multi-Stage Fracture | 4037.10 | 4037.20 | 0 |
2013-08-14 | Multi-Stage Fracture | 3923.90 | 3924.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-08-14 | 2013-08-15 | 2,601 | 13,790 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.268 | N/A | |||
Carbo-EconoProp (30/50) | Canyon | Mullite | 1302-93-8 | 100 | 0.4403 | N/A | ||
Silica Crystalline-Cristobalite | 14464-46-1 | 100 | 0.4403 | N/A | ||||
Silicon Dioxide (amorphous as glass) | 7631-86-9 | 100 | 0.4403 | N/A | ||||
Carbo-HydroProp (40/80) | Canyon | Mullite | 1302-93-8 | 100 | 0.6374 | N/A | ||
Silica Crystalline-Cristobalite | 14464-46-1 | 100 | 0.6374 | N/A | ||||
Silicon Dioxide (amorphous as glass) | 7631-86-9 | 100 | 0.6374 | N/A | ||||
PR-6000 (30/50) | Canyon | No specific ingredients | Not Available | 100 | 0.8073 | N/A | ||
Sand (30/50) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.1352 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.1352 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.1352 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.1353 | N/A | ||||
Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 5.9848 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.9848 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.9848 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.9848 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0249 | N/A | |
Water | 7732-18-5 | 100 | 0.0249 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.049 | N/A | |
Water | 7732-18-5 | 100 | 0.049 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Friction Reducer | No hazardous ingredients | Not Available | 100 | 0.0481 | N/A | |
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0834 | N/A | |
Water | 7732-18-5 | 100 | 0.0834 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-08-09 | 2013-08-10 | Surface Water - Runoff | 1511 |
2013-08-14 | 2013-08-14 | Surface Water - Runoff | 2967 |
2013-08-14 | 2013-08-15 | Surface Water - Runoff | 3314 |
2013-08-11 | 2013-08-13 | Municipal Water | 3525 |
2013-08-11 | 2013-08-12 | Surface Water - Runoff | 2473 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 360 | 0.0 | 0.0 | 0.0 |
2014 | 3746 | 0.0 | 0.0 | 0.0 |
2015 | 1056 | 0.0 | 0.0 | 0.0 |
2017 | 4889 | 0.0 | 0.0 | 0.0 |
2018 | 5801 | 0.0 | 0.0 | 0.0 |
2019 | 7079 | 0.0 | 0.0 | 0.0 |
2020 | 1488 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-05 | No Incident Encountered | 0.00 | 0.00 |
2013-09-05 | No Incident Encountered | 0.00 | 0.00 |
2014-07-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]