If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686072704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.879094,"lon":-118.93796,"icon":""}]} |
Location: 00/04-27-068-07W6/0 | |
Location Alias: 00/04-27-68-07 W6M | |
Location Alias 2: 00/04-27-068-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 07 | |
Section: 27 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ ELM 4-27-68-7 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0484605 | |
License Date: 2017-07-19 | |
License Status: Amended | |
Spud Date: 2017-12-11 | |
Final Drill Date: 2018-01-02 | |
Well Total Depth: 7356.00 m | |
Surface Hole Latitude: 54.879094 | |
Surface Hole Longitude: -118.937960 |
Date | Event |
---|---|
2017-07-19 | Obtained License |
2017-12-12 | Surface Casing Operation Performed |
2017-12-17 | Direction Drilling Operation Performed - Deviate |
2017-12-19 | Direction Drilling Operation Performed - Horizontal |
2017-12-20 | Intermediate Casing Operation Performed |
2017-12-21 | Well Log Performed |
2018-01-02 | Finished Drilling |
2018-01-02 | Well Mode changed to Drilled and Cased |
2018-01-07 | Liner Casing Operation Performed |
2018-01-08 | Perforation Treatment Performed - Open-Hole Completion |
2018-01-08 | Rig Released |
2018-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-25 | Perforation Treatment Performed - Jet Perforation |
2018-02-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-26 | Perforation Treatment Performed - Jet Perforation |
2018-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-27 | Perforation Treatment Performed - Jet Perforation |
2018-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-28 | Perforation Treatment Performed - Jet Perforation |
2018-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-01 | Perforation Treatment Performed - Jet Perforation |
2018-03-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-02 | Perforation Treatment Performed - Jet Perforation |
2018-03-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-03 | Perforation Treatment Performed - Jet Perforation |
2018-03-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-04 | Perforation Treatment Performed - Jet Perforation |
2018-03-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-05 | Perforation Treatment Performed - Jet Perforation |
2018-03-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-06 | Perforation Treatment Performed - Jet Perforation |
2018-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-07 | Perforation Treatment Performed - Jet Perforation |
2018-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-08 | Perforation Treatment Performed - Jet Perforation |
2018-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-09 | Perforation Treatment Performed - Jet Perforation |
2018-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-10 | Perforation Treatment Performed - Jet Perforation |
2018-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-11 | Perforation Treatment Performed - Jet Perforation |
2018-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-12 | Perforation Treatment Performed - Jet Perforation |
2018-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-13 | Perforation Treatment Performed - Jet Perforation |
2018-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-14 | Perforation Treatment Performed - Jet Perforation |
2018-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-12 | Well Began Production |
2018-04-12 | Well Fluid changed to Gas |
2018-04-12 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2017-12-17 | 2418.60 | Deviate (5 - 79 degrees) |
2017-12-19 | 2804.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-01-08 | Open Hole/Barefoot Completion | 7351.00 | 7356.00 | 0 |
2018-02-22 | Multi-Stage Fracture | 6934.50 | 6935.50 | 0 |
2018-03-08 | Perforation | 4329.00 | 4330.00 | 12 |
2018-03-08 | Multi-Stage Fracture | 4329.00 | 4330.00 | 0 |
2018-03-08 | Perforation | 4277.50 | 4278.50 | 12 |
2018-03-08 | Multi-Stage Fracture | 4277.50 | 4278.50 | 0 |
2018-03-08 | Perforation | 4224.00 | 4225.00 | 12 |
2018-03-09 | Multi-Stage Fracture | 4224.00 | 4225.00 | 0 |
2018-03-09 | Perforation | 4173.00 | 4174.00 | 12 |
2018-03-09 | Multi-Stage Fracture | 4173.00 | 4174.00 | 0 |
2018-03-09 | Perforation | 4118.00 | 4119.00 | 12 |
2018-03-09 | Multi-Stage Fracture | 4118.00 | 4119.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 6891.90 | 6892.90 | 0 |
2018-03-09 | Perforation | 4068.00 | 4069.00 | 12 |
2018-03-09 | Multi-Stage Fracture | 4068.00 | 4069.00 | 0 |
2018-03-09 | Perforation | 4013.00 | 4014.00 | 12 |
2018-03-10 | Multi-Stage Fracture | 4013.00 | 4014.00 | 0 |
2018-03-10 | Perforation | 3962.00 | 3963.00 | 12 |
2018-03-10 | Multi-Stage Fracture | 3962.00 | 3963.00 | 0 |
2018-03-10 | Perforation | 3908.00 | 3909.00 | 12 |
2018-03-10 | Multi-Stage Fracture | 3908.00 | 3909.00 | 0 |
2018-03-10 | Perforation | 3856.50 | 3857.50 | 12 |
2018-03-10 | Multi-Stage Fracture | 3856.50 | 3857.50 | 0 |
2018-02-23 | Multi-Stage Fracture | 6836.80 | 6837.80 | 0 |
2018-03-10 | Perforation | 3803.00 | 3804.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3803.00 | 3804.00 | 0 |
2018-03-11 | Perforation | 3752.00 | 3753.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3752.00 | 3753.00 | 0 |
2018-03-11 | Perforation | 3698.00 | 3699.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3698.00 | 3699.00 | 0 |
2018-03-11 | Perforation | 3644.00 | 3645.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3644.00 | 3645.00 | 0 |
2018-03-11 | Perforation | 3595.00 | 3596.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3595.00 | 3596.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 6794.40 | 6795.40 | 0 |
2018-03-11 | Perforation | 3544.00 | 3545.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3544.00 | 3545.00 | 0 |
2018-03-11 | Perforation | 3494.00 | 3495.00 | 12 |
2018-03-12 | Multi-Stage Fracture | 3494.00 | 3495.00 | 0 |
2018-03-12 | Perforation | 3444.00 | 3445.00 | 12 |
2018-03-12 | Multi-Stage Fracture | 3444.00 | 3445.00 | 0 |
2018-03-12 | Perforation | 3390.00 | 3391.00 | 12 |
2018-03-12 | Multi-Stage Fracture | 3390.00 | 3391.00 | 0 |
2018-03-12 | Perforation | 3339.50 | 3340.50 | 12 |
2018-03-12 | Multi-Stage Fracture | 3339.50 | 3340.50 | 0 |
2018-02-23 | Multi-Stage Fracture | 6738.80 | 6739.80 | 0 |
2018-03-12 | Perforation | 3286.00 | 3287.00 | 12 |
2018-03-13 | Multi-Stage Fracture | 3286.00 | 3287.00 | 0 |
2018-03-13 | Perforation | 3231.50 | 3232.50 | 12 |
2018-03-13 | Multi-Stage Fracture | 3231.50 | 3232.50 | 0 |
2018-03-13 | Perforation | 3182.00 | 3183.00 | 12 |
2018-03-13 | Multi-Stage Fracture | 3182.00 | 3183.00 | 0 |
2018-03-13 | Perforation | 3132.00 | 3133.00 | 12 |
2018-03-13 | Multi-Stage Fracture | 3132.00 | 3133.00 | 0 |
2018-03-13 | Perforation | 3078.00 | 3079.00 | 12 |
2018-03-13 | Multi-Stage Fracture | 3078.00 | 3079.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 6696.40 | 6697.40 | 0 |
2018-03-14 | Perforation | 3027.00 | 3028.00 | 12 |
2018-03-14 | Multi-Stage Fracture | 3027.00 | 3028.00 | 0 |
2018-03-14 | Perforation | 2973.00 | 2974.00 | 12 |
2018-03-14 | Multi-Stage Fracture | 2973.00 | 2974.00 | 0 |
2018-03-14 | Perforation | 2928.00 | 2929.00 | 12 |
2018-03-14 | Multi-Stage Fracture | 2928.00 | 2929.00 | 0 |
2018-03-14 | Perforation | 2882.00 | 2883.00 | 12 |
2018-03-14 | Multi-Stage Fracture | 2882.00 | 2883.00 | 0 |
2018-02-24 | Multi-Stage Fracture | 6641.50 | 6642.50 | 0 |
2018-02-24 | Multi-Stage Fracture | 6599.00 | 6600.00 | 0 |
2018-02-24 | Multi-Stage Fracture | 6543.40 | 6544.40 | 0 |
2018-02-25 | Multi-Stage Fracture | 6500.90 | 6501.90 | 0 |
2018-02-21 | Multi-Stage Fracture | 7329.00 | 7332.70 | 0 |
2018-02-25 | Multi-Stage Fracture | 6445.50 | 6446.50 | 0 |
2018-02-25 | Multi-Stage Fracture | 6403.00 | 6404.00 | 0 |
2018-02-25 | Multi-Stage Fracture | 6348.60 | 6349.60 | 0 |
2018-02-25 | Multi-Stage Fracture | 6306.30 | 6307.30 | 0 |
2018-02-25 | Perforation | 6258.00 | 6259.00 | 12 |
2018-02-26 | Multi-Stage Fracture | 6258.00 | 6259.00 | 0 |
2018-02-26 | Perforation | 6212.00 | 6213.00 | 12 |
2018-02-26 | Multi-Stage Fracture | 6212.00 | 6213.00 | 0 |
2018-02-26 | Perforation | 6161.00 | 6162.00 | 12 |
2018-02-26 | Multi-Stage Fracture | 6161.00 | 6162.00 | 0 |
2018-02-21 | Multi-Stage Fracture | 7283.90 | 7284.90 | 0 |
2018-02-26 | Perforation | 6111.00 | 6112.00 | 12 |
2018-02-26 | Multi-Stage Fracture | 6111.00 | 6112.00 | 0 |
2018-02-27 | Perforation | 6058.00 | 6059.00 | 12 |
2018-02-27 | Multi-Stage Fracture | 6058.00 | 6059.00 | 0 |
2018-02-27 | Perforation | 6007.00 | 6008.00 | 12 |
2018-02-27 | Multi-Stage Fracture | 6007.00 | 6008.00 | 0 |
2018-02-27 | Perforation | 5953.00 | 5954.00 | 12 |
2018-02-28 | Multi-Stage Fracture | 5953.00 | 5954.00 | 0 |
2018-02-28 | Perforation | 5904.00 | 5905.00 | 12 |
2018-02-28 | Multi-Stage Fracture | 5904.00 | 5905.00 | 0 |
2018-02-21 | Multi-Stage Fracture | 7228.50 | 7229.50 | 0 |
2018-02-28 | Perforation | 5850.00 | 5851.00 | 12 |
2018-02-28 | Multi-Stage Fracture | 5850.00 | 5851.00 | 0 |
2018-02-28 | Perforation | 5799.00 | 5800.00 | 12 |
2018-02-28 | Multi-Stage Fracture | 5799.00 | 5800.00 | 0 |
2018-02-28 | Perforation | 5746.00 | 5747.00 | 12 |
2018-03-01 | Multi-Stage Fracture | 5746.00 | 5747.00 | 0 |
2018-03-01 | Perforation | 5692.00 | 5693.00 | 12 |
2018-03-01 | Multi-Stage Fracture | 5692.00 | 5693.00 | 0 |
2018-03-01 | Perforation | 5643.00 | 5644.00 | 12 |
2018-03-01 | Multi-Stage Fracture | 5643.00 | 5644.00 | 0 |
2018-02-22 | Multi-Stage Fracture | 7185.70 | 7186.70 | 0 |
2018-03-01 | Perforation | 5593.00 | 5594.00 | 12 |
2018-03-01 | Multi-Stage Fracture | 5593.00 | 5594.00 | 0 |
2018-03-01 | Perforation | 5542.00 | 5543.00 | 12 |
2018-03-02 | Multi-Stage Fracture | 5542.00 | 5543.00 | 0 |
2018-03-02 | Perforation | 5495.50 | 5496.50 | 12 |
2018-03-02 | Multi-Stage Fracture | 5495.50 | 5496.50 | 0 |
2018-03-02 | Perforation | 5445.00 | 5446.00 | 12 |
2018-03-02 | Multi-Stage Fracture | 5445.00 | 5446.00 | 0 |
2018-03-02 | Perforation | 5399.00 | 5400.00 | 12 |
2018-03-02 | Multi-Stage Fracture | 5399.00 | 5400.00 | 0 |
2018-02-22 | Multi-Stage Fracture | 7130.30 | 7131.30 | 0 |
2018-03-02 | Perforation | 5349.00 | 5350.00 | 12 |
2018-03-03 | Multi-Stage Fracture | 5349.00 | 5350.00 | 0 |
2018-03-03 | Perforation | 5302.50 | 5303.50 | 12 |
2018-03-03 | Multi-Stage Fracture | 5302.50 | 5303.50 | 0 |
2018-03-03 | Perforation | 5252.00 | 5253.00 | 12 |
2018-03-03 | Multi-Stage Fracture | 5252.00 | 5253.00 | 0 |
2018-03-03 | Perforation | 5205.00 | 5206.00 | 12 |
2018-03-03 | Multi-Stage Fracture | 5205.00 | 5206.00 | 0 |
2018-03-04 | Perforation | 5155.00 | 5156.00 | 12 |
2018-03-04 | Multi-Stage Fracture | 5155.00 | 5156.00 | 0 |
2018-02-22 | Multi-Stage Fracture | 7087.80 | 7088.80 | 0 |
2018-03-04 | Perforation | 5108.50 | 5109.50 | 12 |
2018-03-04 | Multi-Stage Fracture | 5108.50 | 5109.50 | 0 |
2018-03-04 | Perforation | 5058.00 | 5059.00 | 12 |
2018-03-04 | Multi-Stage Fracture | 5058.00 | 5059.00 | 0 |
2018-03-04 | Perforation | 5005.00 | 5006.00 | 12 |
2018-03-05 | Multi-Stage Fracture | 5005.00 | 5006.00 | 0 |
2018-03-05 | Perforation | 4956.00 | 4957.00 | 12 |
2018-03-05 | Multi-Stage Fracture | 4956.00 | 4957.00 | 0 |
2018-03-05 | Perforation | 4906.00 | 4907.00 | 12 |
2018-03-05 | Multi-Stage Fracture | 4906.00 | 4907.00 | 0 |
2018-02-22 | Multi-Stage Fracture | 7032.40 | 7033.40 | 0 |
2018-03-05 | Perforation | 4851.00 | 4852.00 | 12 |
2018-03-05 | Multi-Stage Fracture | 4851.00 | 4852.00 | 0 |
2018-03-06 | Perforation | 4795.00 | 4796.00 | 12 |
2018-03-06 | Multi-Stage Fracture | 4795.00 | 4796.00 | 0 |
2018-03-06 | Perforation | 4746.00 | 4747.00 | 12 |
2018-03-06 | Multi-Stage Fracture | 4746.00 | 4747.00 | 0 |
2018-03-06 | Perforation | 4697.50 | 4698.50 | 12 |
2018-03-06 | Multi-Stage Fracture | 4697.50 | 4698.50 | 0 |
2018-03-06 | Perforation | 4643.00 | 4644.00 | 12 |
2018-03-06 | Multi-Stage Fracture | 4643.00 | 4644.00 | 0 |
2018-02-22 | Multi-Stage Fracture | 6989.60 | 6990.60 | 0 |
2018-03-06 | Perforation | 4593.00 | 4594.00 | 12 |
2018-03-07 | Multi-Stage Fracture | 4593.00 | 4594.00 | 0 |
2018-03-07 | Perforation | 4538.00 | 4539.00 | 12 |
2018-03-07 | Multi-Stage Fracture | 4538.00 | 4539.00 | 0 |
2018-03-07 | Perforation | 4487.00 | 4488.00 | 12 |
2018-03-07 | Multi-Stage Fracture | 4487.00 | 4488.00 | 0 |
2018-03-07 | Perforation | 4433.00 | 4434.00 | 12 |
2018-03-08 | Multi-Stage Fracture | 4433.00 | 4434.00 | 0 |
2018-03-08 | Perforation | 4382.50 | 4383.50 | 12 |
2018-03-08 | Multi-Stage Fracture | 4382.50 | 4383.50 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-21 | 2018-03-14 | 2,700 | 71,455 | N/A |
2 | 2018-02-25 | 2018-03-14 | 2,700 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 89.0772 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 8.7792 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 2.2018 | N/A | ||
SFR-302 (Friction Reducer) | Step Energy Services | Friction Reducer | Proprietary | Trade Secret | 100 | 0.0232 | N/A | |
Sodium Chloride | 7647-14-5 | 100 | 0.0232 | N/A | ||||
SSI-1 (Scale Inhibitor) | Step Energy Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0358 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0358 | N/A | ||||
2 | SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0002 | N/A |
Cured Acrylic Resin | Not Available | 100 | 0.0002 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0002 | N/A | ||||
SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0099 | N/A | |
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0099 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-01-15 | 2018-03-13 | Groundwater - Non-saline less than or equal to 150m deep | 71940 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5592 | 0.0 | 0.0 | 0.0 |
2019 | 8471 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-08 | No Incident Encountered | 0.00 | 0.00 |
2018-03-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]