If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686072705020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.879137,"lon":-118.938097,"icon":""}]} |
Location: 02/05-27-068-07W6/0 | |
Location Alias: 02/05-27-68-07 W6M | |
Location Alias 2: 02/05-27-068-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 07 | |
Section: 27 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: NUVISTA HZ ELM 5-27-68-7 | |
Operator Name: NuVista Energy Ltd. | |
License Number: 0484606 | |
License Date: 2017-07-19 | |
License Status: Amended | |
Spud Date: 2017-12-09 | |
Final Drill Date: 2018-01-30 | |
Well Total Depth: 7848.00 m | |
Surface Hole Latitude: 54.879137 | |
Surface Hole Longitude: -118.938097 |
Date | Event |
---|---|
2017-07-19 | Obtained License |
2017-12-11 | Surface Casing Operation Performed |
2018-01-13 | Direction Drilling Operation Performed - Deviate |
2018-01-15 | Direction Drilling Operation Performed - Horizontal |
2018-01-15 | Well Log Performed |
2018-01-16 | Intermediate Casing Operation Performed |
2018-01-30 | Finished Drilling |
2018-01-30 | Well Log Performed |
2018-01-30 | Well Mode changed to Drilled and Cased |
2018-02-04 | Liner Casing Operation Performed |
2018-02-07 | Rig Released |
2018-02-09 | Perforation Treatment Performed - Open-Hole Completion |
2018-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-25 | Perforation Treatment Performed - Jet Perforation |
2018-02-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-26 | Perforation Treatment Performed - Jet Perforation |
2018-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-27 | Perforation Treatment Performed - Jet Perforation |
2018-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-28 | Perforation Treatment Performed - Jet Perforation |
2018-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-01 | Perforation Treatment Performed - Jet Perforation |
2018-03-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-02 | Perforation Treatment Performed - Jet Perforation |
2018-03-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-03 | Perforation Treatment Performed - Jet Perforation |
2018-03-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-04 | Perforation Treatment Performed - Jet Perforation |
2018-03-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-05 | Perforation Treatment Performed - Jet Perforation |
2018-03-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-06 | Perforation Treatment Performed - Jet Perforation |
2018-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-07 | Perforation Treatment Performed - Jet Perforation |
2018-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-08 | Perforation Treatment Performed - Jet Perforation |
2018-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-09 | Perforation Treatment Performed - Jet Perforation |
2018-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-10 | Perforation Treatment Performed - Jet Perforation |
2018-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-11 | Perforation Treatment Performed - Jet Perforation |
2018-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-12 | Perforation Treatment Performed - Jet Perforation |
2018-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-13 | Perforation Treatment Performed - Jet Perforation |
2018-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-14 | Perforation Treatment Performed - Jet Perforation |
2018-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-01 | Well Began Production |
2018-04-01 | Well Fluid changed to Gas |
2018-04-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-13 | 2438.10 | Deviate (5 - 79 degrees) |
2018-01-15 | 2804.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-09 | Open Hole/Barefoot Completion | 7843.00 | 7848.00 | 0 |
2018-02-21 | Multi-Stage Fracture | 7343.80 | 7343.90 | 0 |
2018-03-08 | Perforation | 4508.00 | 4509.00 | 12 |
2018-03-08 | Multi-Stage Fracture | 4508.00 | 4509.00 | 0 |
2018-03-08 | Perforation | 4453.00 | 4454.00 | 12 |
2018-03-08 | Multi-Stage Fracture | 4453.00 | 4454.00 | 0 |
2018-03-08 | Perforation | 4400.50 | 4401.50 | 12 |
2018-03-09 | Multi-Stage Fracture | 4400.50 | 4401.50 | 0 |
2018-03-09 | Perforation | 4340.50 | 4341.50 | 12 |
2018-03-09 | Multi-Stage Fracture | 4340.50 | 4341.50 | 0 |
2018-03-09 | Perforation | 4286.00 | 4287.00 | 12 |
2018-03-09 | Multi-Stage Fracture | 4286.00 | 4287.00 | 0 |
2018-02-22 | Multi-Stage Fracture | 7284.20 | 7284.30 | 0 |
2018-03-09 | Perforation | 4236.00 | 4237.00 | 12 |
2018-03-09 | Multi-Stage Fracture | 4236.00 | 4237.00 | 0 |
2018-03-09 | Perforation | 4178.00 | 4179.00 | 12 |
2018-03-10 | Multi-Stage Fracture | 4178.00 | 4179.00 | 0 |
2018-03-10 | Perforation | 4123.00 | 4124.00 | 12 |
2018-03-10 | Multi-Stage Fracture | 4123.00 | 4124.00 | 0 |
2018-03-10 | Perforation | 4079.00 | 4080.00 | 12 |
2018-03-10 | Multi-Stage Fracture | 4079.00 | 4080.00 | 0 |
2018-03-10 | Perforation | 4031.00 | 4032.00 | 12 |
2018-03-10 | Multi-Stage Fracture | 4031.00 | 4032.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 7225.80 | 7225.90 | 0 |
2018-03-10 | Perforation | 3977.00 | 3978.00 | 12 |
2018-03-10 | Multi-Stage Fracture | 3977.00 | 3978.00 | 0 |
2018-03-11 | Perforation | 3931.00 | 3932.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3931.00 | 3932.00 | 0 |
2018-03-11 | Perforation | 3881.00 | 3882.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3881.00 | 3882.00 | 0 |
2018-03-11 | Perforation | 3828.00 | 3829.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3828.00 | 3829.00 | 0 |
2018-03-11 | Perforation | 3784.00 | 3785.00 | 12 |
2018-03-11 | Multi-Stage Fracture | 3784.00 | 3785.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 7166.90 | 7167.00 | 0 |
2018-03-11 | Perforation | 3733.50 | 3734.50 | 12 |
2018-03-11 | Multi-Stage Fracture | 3733.50 | 3734.50 | 0 |
2018-03-11 | Perforation | 3678.00 | 3679.00 | 12 |
2018-03-12 | Multi-Stage Fracture | 3678.00 | 3679.00 | 0 |
2018-03-12 | Perforation | 3633.00 | 3634.00 | 12 |
2018-03-12 | Multi-Stage Fracture | 3633.00 | 3634.00 | 0 |
2018-03-12 | Perforation | 3584.50 | 3585.50 | 12 |
2018-03-12 | Multi-Stage Fracture | 3584.50 | 3585.50 | 0 |
2018-03-12 | Perforation | 3530.00 | 3531.00 | 12 |
2018-03-12 | Multi-Stage Fracture | 3530.00 | 3531.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 7106.20 | 7106.30 | 0 |
2018-03-12 | Perforation | 3481.00 | 3482.00 | 12 |
2018-03-13 | Multi-Stage Fracture | 3481.00 | 3482.00 | 0 |
2018-03-13 | Perforation | 3428.00 | 3429.00 | 12 |
2018-03-13 | Multi-Stage Fracture | 3428.00 | 3429.00 | 0 |
2018-03-13 | Perforation | 3381.00 | 3382.00 | 12 |
2018-03-13 | Multi-Stage Fracture | 3381.00 | 3382.00 | 0 |
2018-03-13 | Perforation | 3327.50 | 3328.50 | 12 |
2018-03-13 | Multi-Stage Fracture | 3327.50 | 3328.50 | 0 |
2018-03-13 | Perforation | 3278.50 | 3279.50 | 12 |
2018-03-13 | Multi-Stage Fracture | 3278.50 | 3279.50 | 0 |
2018-02-23 | Multi-Stage Fracture | 7047.10 | 7047.20 | 0 |
2018-03-13 | Perforation | 3226.00 | 3227.00 | 12 |
2018-03-13 | Multi-Stage Fracture | 3226.00 | 3227.00 | 0 |
2018-03-14 | Perforation | 3175.00 | 3176.00 | 12 |
2018-03-14 | Multi-Stage Fracture | 3175.00 | 3176.00 | 0 |
2018-03-14 | Perforation | 3120.00 | 3121.00 | 12 |
2018-03-14 | Multi-Stage Fracture | 3120.00 | 3121.00 | 0 |
2018-03-14 | Perforation | 3075.00 | 3076.00 | 12 |
2018-03-14 | Multi-Stage Fracture | 3075.00 | 3076.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 6986.60 | 6986.70 | 0 |
2018-02-24 | Multi-Stage Fracture | 6926.20 | 6926.30 | 0 |
2018-02-24 | Multi-Stage Fracture | 6866.40 | 6866.50 | 0 |
2018-02-24 | Multi-Stage Fracture | 6806.60 | 6806.70 | 0 |
2018-02-20 | Multi-Stage Fracture | 7819.70 | 7823.30 | 0 |
2018-02-24 | Multi-Stage Fracture | 6735.20 | 6735.30 | 0 |
2018-02-24 | Multi-Stage Fracture | 6661.90 | 6662.00 | 0 |
2018-02-24 | Multi-Stage Fracture | 6589.60 | 6589.70 | 0 |
2018-02-24 | Multi-Stage Fracture | 6518.80 | 6518.90 | 0 |
2018-02-25 | Perforation | 6443.50 | 6444.50 | 12 |
2018-02-25 | Multi-Stage Fracture | 6443.50 | 6444.50 | 0 |
2018-02-26 | Perforation | 6388.00 | 6389.00 | 12 |
2018-02-26 | Multi-Stage Fracture | 6388.00 | 6389.00 | 0 |
2018-02-26 | Perforation | 6336.00 | 6337.00 | 12 |
2018-02-26 | Multi-Stage Fracture | 6336.00 | 6337.00 | 0 |
2018-02-20 | Multi-Stage Fracture | 7757.00 | 7757.10 | 0 |
2018-02-26 | Perforation | 6285.00 | 6286.00 | 12 |
2018-02-26 | Multi-Stage Fracture | 6285.00 | 6286.00 | 0 |
2018-02-27 | Perforation | 6227.00 | 6228.00 | 12 |
2018-02-27 | Multi-Stage Fracture | 6227.00 | 6228.00 | 0 |
2018-02-27 | Perforation | 6174.00 | 6175.00 | 12 |
2018-02-27 | Multi-Stage Fracture | 6174.00 | 6175.00 | 0 |
2018-02-27 | Perforation | 6124.50 | 6125.50 | 12 |
2018-02-27 | Multi-Stage Fracture | 6124.50 | 6125.50 | 0 |
2018-02-28 | Perforation | 6066.00 | 6067.00 | 12 |
2018-02-28 | Multi-Stage Fracture | 6066.00 | 6067.00 | 0 |
2018-02-21 | Multi-Stage Fracture | 7698.40 | 7698.50 | 0 |
2018-02-28 | Perforation | 6012.00 | 6013.00 | 12 |
2018-02-28 | Multi-Stage Fracture | 6012.00 | 6013.00 | 0 |
2018-02-28 | Perforation | 5967.50 | 5968.50 | 12 |
2018-02-28 | Multi-Stage Fracture | 5967.50 | 5968.50 | 0 |
2018-02-28 | Perforation | 5918.00 | 5919.00 | 12 |
2018-02-28 | Multi-Stage Fracture | 5918.00 | 5919.00 | 0 |
2018-03-01 | Perforation | 5866.00 | 5867.00 | 12 |
2018-03-01 | Multi-Stage Fracture | 5866.00 | 5867.00 | 0 |
2018-03-01 | Perforation | 5823.00 | 5824.00 | 12 |
2018-03-01 | Multi-Stage Fracture | 5823.00 | 5824.00 | 0 |
2018-02-21 | Multi-Stage Fracture | 7639.40 | 7639.50 | 0 |
2018-03-01 | Perforation | 5774.00 | 5775.00 | 12 |
2018-03-01 | Multi-Stage Fracture | 5774.00 | 5775.00 | 0 |
2018-03-01 | Perforation | 5719.00 | 5720.00 | 12 |
2018-03-01 | Multi-Stage Fracture | 5719.00 | 5720.00 | 0 |
2018-03-02 | Perforation | 5673.00 | 5674.00 | 12 |
2018-03-02 | Multi-Stage Fracture | 5673.00 | 5674.00 | 0 |
2018-03-02 | Perforation | 5622.00 | 5623.00 | 12 |
2018-03-02 | Multi-Stage Fracture | 5622.00 | 5623.00 | 0 |
2018-03-02 | Perforation | 5568.00 | 5569.00 | 12 |
2018-03-02 | Multi-Stage Fracture | 5568.00 | 5569.00 | 0 |
2018-02-21 | Multi-Stage Fracture | 7582.80 | 7582.90 | 0 |
2018-03-02 | Perforation | 5523.00 | 5524.00 | 12 |
2018-03-02 | Multi-Stage Fracture | 5523.00 | 5524.00 | 0 |
2018-03-03 | Perforation | 5473.00 | 5474.00 | 12 |
2018-03-03 | Multi-Stage Fracture | 5473.00 | 5474.00 | 0 |
2018-03-03 | Perforation | 5420.00 | 5421.00 | 12 |
2018-03-03 | Multi-Stage Fracture | 5420.00 | 5421.00 | 0 |
2018-03-03 | Perforation | 5736.00 | 5737.00 | 12 |
2018-03-03 | Multi-Stage Fracture | 5736.00 | 5737.00 | 0 |
2018-03-03 | Perforation | 5325.50 | 5326.50 | 12 |
2018-03-04 | Multi-Stage Fracture | 5325.50 | 5326.50 | 0 |
2018-02-21 | Multi-Stage Fracture | 7522.80 | 7522.90 | 0 |
2018-03-04 | Perforation | 5271.00 | 5272.00 | 12 |
2018-03-04 | Multi-Stage Fracture | 5271.00 | 5272.00 | 0 |
2018-03-04 | Perforation | 5227.00 | 5228.00 | 12 |
2018-03-04 | Multi-Stage Fracture | 5227.00 | 5228.00 | 0 |
2018-03-04 | Perforation | 5177.50 | 5178.50 | 12 |
2018-03-05 | Multi-Stage Fracture | 5177.50 | 5178.50 | 0 |
2018-03-05 | Perforation | 5124.00 | 5125.00 | 12 |
2018-03-05 | Multi-Stage Fracture | 5124.00 | 5125.00 | 0 |
2018-03-05 | Perforation | 5079.00 | 5080.00 | 12 |
2018-03-05 | Multi-Stage Fracture | 5079.00 | 5080.00 | 0 |
2018-02-21 | Multi-Stage Fracture | 7463.30 | 7463.40 | 0 |
2018-03-05 | Perforation | 5027.00 | 5028.00 | 12 |
2018-03-05 | Multi-Stage Fracture | 5027.00 | 5028.00 | 0 |
2018-03-05 | Perforation | 4972.00 | 4973.00 | 12 |
2018-03-06 | Multi-Stage Fracture | 4972.00 | 4973.00 | 0 |
2018-03-06 | Perforation | 4926.00 | 4927.00 | 12 |
2018-03-06 | Multi-Stage Fracture | 4926.00 | 4927.00 | 0 |
2018-03-06 | Perforation | 4874.50 | 4875.50 | 12 |
2018-03-06 | Multi-Stage Fracture | 4874.50 | 4875.50 | 0 |
2018-03-06 | Perforation | 4819.00 | 4820.00 | 12 |
2018-03-06 | Multi-Stage Fracture | 4819.00 | 4820.00 | 0 |
2018-02-21 | Multi-Stage Fracture | 7403.90 | 7404.00 | 0 |
2018-03-06 | Perforation | 4773.00 | 4774.00 | 12 |
2018-03-06 | Multi-Stage Fracture | 4773.00 | 4774.00 | 0 |
2018-03-07 | Perforation | 4722.00 | 4723.00 | 12 |
2018-03-07 | Multi-Stage Fracture | 4722.00 | 4723.00 | 0 |
2018-03-07 | Perforation | 4666.00 | 4667.00 | 12 |
2018-03-07 | Multi-Stage Fracture | 4666.00 | 4667.00 | 0 |
2018-03-07 | Perforation | 4620.00 | 4621.00 | 12 |
2018-03-07 | Multi-Stage Fracture | 4620.00 | 4621.00 | 0 |
2018-03-07 | Perforation | 4568.50 | 4569.50 | 12 |
2018-03-08 | Multi-Stage Fracture | 4568.50 | 4569.50 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-20 | 2018-03-14 | 2,699 | 77,840 | N/A |
2 | 2018-02-24 | 2018-03-14 | 2,699 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 89.7692 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 8.2154 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 2.0369 | N/A | ||
SFR-302 (Friction Reducer) | Step Energy Services | Friction Reducer | Proprietary | Trade Secret | 100 | 0.0279 | N/A | |
Sodium Chloride | 7647-14-5 | 100 | 0.0279 | N/A | ||||
SSI-1 (Scale Inhibitor) | Step Energy Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0356 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0356 | N/A | ||||
2 | SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0002 | N/A |
Cured Acrylic Resin | Not Available | 100 | 0.0002 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0002 | N/A | ||||
SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0091 | N/A | |
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0091 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5400 | 0.0 | 0.0 | 0.0 |
2019 | 8207 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-09 | No Incident Encountered | 0.00 | 0.00 |
2018-03-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]