X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686080616000

Well Details

Well ID: 0686080616000
Loading map...
Location: 00/16-06-068-08W6/0
Location Alias: 00/16-06-68-08 W6M
Location Alias 2: 00/16-06-068-08 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 08
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA HZ WAPITI 16-6-68-8
Operator Name: NuVista Energy Ltd.
License Number: 0470775
License Date: 2014-10-21
License Status: Issued
Spud Date: 2015-02-23
Final Drill Date: 2015-03-22
Well Total Depth: 5142.00 m
Surface Hole Latitude: 54.851279
Surface Hole Longitude: -119.173395

For data sources see[1][2]

Well History

Date Event
2014-10-21 Obtained License
2015-02-25 Surface Casing Operation Performed
2015-03-04 Direction Drilling Operation Performed - Deviate
2015-03-09 Direction Drilling Operation Performed - Horizontal
2015-03-10 Intermediate Casing Operation Performed
2015-03-11 Well Log Performed
2015-03-22 Finished Drilling
2015-03-22 Well Log Performed
2015-03-22 Well Mode changed to Drilled and Cased
2015-03-26 Liner Casing Operation Performed
2015-03-27 Rig Released
2015-03-29 Perforation Treatment Performed - Open-Hole Completion
2015-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-02 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-03 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-07 Perforation Treatment Performed - Jet Perforation
2015-06-08 Perforation Treatment Performed - Jet Perforation
2015-06-10 Well Began Production
2015-06-10 Well Fluid changed to Gas
2015-06-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-23 Horizon Drilling Inc. 11 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-03-04 2762.50 Deviate (5 - 79 degrees)
2015-03-09 3100.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-29 Open Hole/Barefoot Completion 5137.00 5142.00 0
2015-06-02 Multi-Stage Fracture 4484.30 4484.40 0
2015-06-02 Multi-Stage Fracture 4401.70 4401.80 0
2015-06-02 Multi-Stage Fracture 4314.90 4315.00 0
2015-06-02 Multi-Stage Fracture 4229.50 4229.60 0
2015-06-02 Multi-Stage Fracture 4143.70 4143.80 0
2015-06-02 Multi-Stage Fracture 4059.60 4059.70 0
2015-06-02 Multi-Stage Fracture 3976.00 3976.10 0
2015-06-02 Multi-Stage Fracture 3890.20 3890.30 0
2015-06-02 Multi-Stage Fracture 3803.30 3803.40 0
2015-06-03 Multi-Stage Fracture 3716.70 3716.80 0
2015-06-01 Multi-Stage Fracture 5114.20 5114.30 0
2015-06-03 Multi-Stage Fracture 3629.70 3629.80 0
2015-06-03 Multi-Stage Fracture 3543.00 3543.10 0
2015-06-03 Multi-Stage Fracture 3456.20 3456.30 0
2015-06-03 Multi-Stage Fracture 3370.50 3370.60 0
2015-06-03 Multi-Stage Fracture 3283.90 3284.00 0
2015-06-03 Multi-Stage Fracture 3194.00 3194.10 0
2015-06-07 Perforation 5106.70 5107.20 22
2015-06-07 Perforation 5040.60 5041.10 22
2015-06-08 Perforation 4981.10 4981.60 22
2015-06-08 Perforation 4908.30 4908.80 22
2015-06-01 Multi-Stage Fracture 5048.90 5049.00 0
2015-06-08 Perforation 4821.80 4822.30 22
2015-06-08 Perforation 4735.10 4735.60 22
2015-06-08 Perforation 4648.20 4648.70 22
2015-06-08 Perforation 4561.40 4561.90 22
2015-06-08 Perforation 4476.90 4477.40 22
2015-06-08 Perforation 4394.20 4394.70 22
2015-06-08 Perforation 4307.40 4307.90 22
2015-06-08 Perforation 4222.00 4222.50 22
2015-06-08 Perforation 4136.30 4136.80 22
2015-06-08 Perforation 4052.10 4052.60 22
2015-06-01 Multi-Stage Fracture 4988.60 4988.70 0
2015-06-08 Perforation 3968.50 3969.00 22
2015-06-08 Perforation 3882.70 3883.20 22
2015-06-08 Perforation 3795.80 3796.30 22
2015-06-08 Perforation 3709.20 3709.70 22
2015-06-08 Perforation 3622.20 3622.70 22
2015-06-08 Perforation 3535.60 3536.10 22
2015-06-08 Perforation 3448.70 3449.20 22
2015-06-08 Perforation 3363.10 3363.60 22
2015-06-08 Perforation 3276.40 3276.90 22
2015-06-08 Perforation 3186.60 3187.10 22
2015-06-01 Multi-Stage Fracture 4915.80 4915.90 0
2015-06-01 Multi-Stage Fracture 4829.20 4829.30 0
2015-06-01 Multi-Stage Fracture 4742.50 4742.60 0
2015-06-02 Multi-Stage Fracture 4655.70 4655.80 0
2015-06-02 Multi-Stage Fracture 4568.90 4569.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-01 2015-06-03 2,999 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Lease Water Not Available 100 99.6954 N/A
SAND - PRC-30/50 Halliburton Crystalline silica. quartz 14808-60-7 100 0.035 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 0.2268 N/A
MC B-8510 Halliburton Bactericide/Biocide 2.2-Dibromo-3-dinitrilopropionamide 10222-01-2 100 0.0322 N/A
Dibromacetonitrile 3252-43-5 100 0.0319 N/A
Inert ingredient Not Available 100 0.0322 N/A
Sodium bromide 7647-15-6 100 0.0319 N/A
FR-66 Halliburton Friction Reducer Ammonium Chloride 12125-02-9 100 0.042 N/A
Fatty Nitrogen Derived Amides / Ethoxylated Alchol 9068 100 0.042 N/A
Hydrotreated Light Petroleum Distillate 64742-47-8 100 0.042 N/A
Inert ingredient Not Available 100 0.042 N/A
LOSURF-300D Halliburton Surfactant 1.2.4 Trimethylbenzene 95-63-6 100 0.0875 N/A
Ethanol 64-17-5 100 0.0875 N/A
Heavy aromatic petroleum naphtha 64742-94-5 100 0.0875 N/A
Naphthalene 91-20-3 100 0.0875 N/A
Poly(oxy-1.2-ethanediyl). alpha-(4-nonylphenyl)-omega-hydro
x
127087-87-0 100 0.0875 N/A
Proprietary ingredient(s) Trade Secret 100 0.0875 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-05-17 2015-06-03 Surface Water - Runoff 2637
2015-05-31 2015-06-02 Surface Water - Runoff 3805
2015-05-26 2015-05-28 Surface Water - Runoff 4689
2015-05-16 2015-05-29 Surface Water - Runoff 608
2015-05-31 2015-06-02 Surface Water - Runoff 6084

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4148 0.0 0.0 0.0
2016 7692 0.0 0.0 0.0
2017 7536 0.0 0.0 0.0
2018 8567 0.0 0.0 0.0
2019 8616 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-29 No Incident Encountered 0.00 0.00
2015-06-10 No Incident Encountered 0.00 0.00
2015-06-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References