X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686082101020

Well Details

Well ID: 0686082101020
Loading map...
Location: 02/01-21-068-08W6/0
Location Alias: 02/01-21-68-08 W6M
Location Alias 2: 02/01-21-068-08 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 08
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: NUVISTA 102 HZ ELM 1-21-68-8
Operator Name: NuVista Energy Ltd.
License Number: 0474474
License Date: 2015-02-03
License Status: Issued
Spud Date: 2015-02-15
Final Drill Date: 2015-03-12
Well Total Depth: 5206.00 m
Surface Hole Latitude: 54.913189
Surface Hole Longitude: -119.172278

For data sources see[1][2]

Well History

Date Event
2015-02-03 Obtained License
2015-02-17 Surface Casing Operation Performed
2015-02-25 Direction Drilling Operation Performed - Deviate
2015-03-03 Direction Drilling Operation Performed - Horizontal
2015-03-04 Intermediate Casing Operation Performed
2015-03-05 Well Log Performed
2015-03-12 Finished Drilling
2015-03-12 Well Log Performed
2015-03-12 Well Mode changed to Drilled and Cased
2015-03-14 Liner Casing Operation Performed
2015-03-16 Perforation Treatment Performed - Open-Hole Completion
2015-03-16 Rig Released
2015-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-24 Well Began Production
2015-11-24 Well Fluid changed to Gas
2015-11-24 Well Mode changed to Flowing
2016-01-11 Perforation Treatment Performed - Jet Perforation
2016-01-12 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-15 Nabors Drilling Limited 60 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-02-25 2642.20 Deviate (5 - 79 degrees)
2015-03-03 2940.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-16 Open Hole/Barefoot Completion 5201.80 5206.00 0
2015-10-06 Multi-Stage Fracture 4473.30 4473.40 0
2015-10-06 Multi-Stage Fracture 4387.70 4387.80 0
2015-10-06 Multi-Stage Fracture 4301.90 4302.00 0
2015-10-06 Multi-Stage Fracture 4216.10 4216.20 0
2015-10-06 Multi-Stage Fracture 4130.40 4130.50 0
2015-10-06 Multi-Stage Fracture 4044.60 4044.70 0
2015-10-06 Multi-Stage Fracture 3959.10 3959.20 0
2015-10-07 Multi-Stage Fracture 3874.60 3874.70 0
2015-10-07 Multi-Stage Fracture 3790.70 3790.80 0
2015-10-07 Multi-Stage Fracture 3707.00 3707.10 0
2015-10-05 Multi-Stage Fracture 5166.00 5166.10 0
2015-10-07 Multi-Stage Fracture 3623.60 3623.70 0
2015-10-07 Multi-Stage Fracture 3539.30 3539.40 0
2015-10-07 Multi-Stage Fracture 3453.80 3453.90 0
2015-10-07 Multi-Stage Fracture 3368.10 3368.20 0
2015-10-07 Multi-Stage Fracture 3282.60 3282.70 0
2015-10-07 Multi-Stage Fracture 3196.90 3197.00 0
2016-01-11 Perforation 4208.70 4209.20 13
2016-01-11 Perforation 4122.90 4123.40 13
2016-01-11 Perforation 4037.20 4037.70 13
2016-01-11 Perforation 3951.70 3952.20 13
2015-10-05 Multi-Stage Fracture 5073.70 5073.80 0
2016-01-11 Perforation 3867.20 3867.70 13
2016-01-11 Perforation 3783.30 3783.80 13
2016-01-11 Perforation 3699.50 3700.00 13
2016-01-11 Perforation 3616.10 3616.60 13
2016-01-11 Perforation 3531.80 3532.30 13
2016-01-11 Perforation 3446.30 3446.80 13
2016-01-11 Perforation 3360.70 3361.20 13
2016-01-11 Perforation 3275.20 3275.70 13
2016-01-11 Perforation 3189.40 3189.90 13
2016-01-12 Perforation 5066.30 5066.80 13
2015-10-05 Multi-Stage Fracture 4987.90 4988.00 0
2016-01-12 Perforation 4980.40 4980.90 13
2016-01-12 Perforation 4894.80 4895.30 13
2016-01-12 Perforation 4809.10 4809.60 13
2016-01-12 Perforation 4723.40 4723.90 13
2016-01-12 Perforation 4637.50 4638.00 13
2016-01-12 Perforation 4551.70 4552.30 13
2016-01-12 Perforation 4465.90 4466.40 13
2016-01-12 Perforation 4380.20 4380.70 13
2016-01-12 Perforation 4294.50 4295.00 13
2015-10-05 Multi-Stage Fracture 4902.30 4902.40 0
2015-10-05 Multi-Stage Fracture 4816.60 4816.70 0
2015-10-05 Multi-Stage Fracture 4730.80 4730.90 0
2015-10-05 Multi-Stage Fracture 4645.00 4645.10 0
2015-10-06 Multi-Stage Fracture 4559.20 4559.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-05 2015-10-07 2,859 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Not Available 100 88.8208 N/A
SAND-PREMIUM WHITE RES-30/50. 50 KG SACK Halliburton Crystalline silica. quartz 14808-60-7 100 0.7886 N/A
SAND-PREMIUM WHITE-30/50. BULK Halliburton Crystalline silica. quartz 14808-60-7 100 8.1141 N/A
SAND-PREMIUM WHITE-40/70. BULK Halliburton Crystalline silica. quartz 14808-60-7 100 2.2268 N/A
MC B-8510 Halliburton Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0094 N/A
Dibromaocetonitrile 3252-43-5 100 0.0094 N/A
Inert Ingredient Not Available 100 0.0094 N/A
Sodium bromide 7647-15-6 100 0.0094 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0494 N/A
Ethoxylated alcohols 9068 100 0.0494 N/A
Fatty nitrogen derived amides 9068 100 0.0494 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0494 N/A
Inert ingredient(s) Not Available 100 0.0494 N/A
Proprietary ingredient(s) Trade Secret 100 0.0512 N/A
OilPerm A Halliburton Surfactant Ethanol 64-17-5 100 0.0934 N/A
Heavy aromatic petroleum naphtha 64742-94-5 100 0.0933 N/A
Naphthalene 91-20-3 100 0.0933 N/A
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydro 127087-87-0 100 0.0933 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-10-02 2015-10-04 Surface Water - Runoff 2100
2015-10-02 2015-10-05 Surface Water - Runoff 4196
2015-09-17 2015-09-17 Surface Water - Runoff 2438
2015-10-02 2015-10-04 Surface Water - Runoff 6840
2015-09-18 2015-09-19 Surface Water - Runoff 4000

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 971 0.0 0.0 0.0
2016 7162 0.0 0.0 0.0
2017 3820 0.0 0.0 0.0
2018 7391 0.0 0.0 0.0
2019 7944 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-16 No Incident Encountered 0.00 0.00
2015-10-07 No Incident Encountered 0.00 0.00
2016-01-12 No Incident Encountered 0.00 0.00
2015-03-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References